Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksItm Power Regulatory News (ITM)

Share Price Information for Itm Power (ITM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 54.00
Bid: 53.70
Ask: 53.95
Change: 0.30 (0.56%)
Spread: 0.25 (0.466%)
Open: 55.95
High: 55.95
Low: 52.75
Prev. Close: 53.70
ITM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

US Home Refueller Design Contract & Partnership

25 May 2010 07:00

RNS Number : 4640M
ITM Power PLC
25 May 2010
 



 

 

25 May 2010

 

 

ITM Power plc ("the Company")

US Home Refueller Design Contract & Partnership

 

ITM Power plc, the energy storage and clean fuel company, is pleased to announce that it will be undertaking a detailed engineering design study for The NextEnergy Centre, a US business accelerator for alternative and renewable energy, for the development of an alpha prototype Small-scale Hydrogen Fuelling Appliance (SHFA) for 70MPa (700 bar) home refuelling, with consideration of 35MPa (350 bar).

 

The SHFA will be suitable for the next generation of hydrogen-powered vehicles currently being developed by major automotive OEMs. If successful it may provide a substantial part of the US public hydrogen fuelling network for commuter vehicles. In addition it will also facilitate the introduction of hydrogen vehicles in some commercial applications, such as hydrogen-powered fork lift-trucks for materials handling.

 

SHFA Design Study

 

ITM has been awarded a sub-contract from NextEnergy of US$81,000 over 10 months to design an alpha prototype Small-scale Hydrogen Fuelling Appliance (SHFA) for 70MPa (700 bar) refuelling. This will be capable of generating and delivering up to 5kg H2 per week in one or more refuelling events.

 

NextEnergy havereceived approval from the U.S. Department of Energy to utilize Congressional Appropriation funding to develop a 70 MPa Small-scale Hydrogen Fueling Appliance (SHFA). A Steering Committee is providing technical oversight for this 70 MPa SHFA project. The Steering Committee consists of NextEnergy, combined with the following OEMs: General Motors, Ford Motor Company, Chrysler, Daimler, AG, Toyota, Nissan, Hyundai-Kia Motors and Volkswagen. In addition the committee includes the California South Coast Air Quality Management District (AQMD), and the US Army Tank-Automotive Research, Development and Engineering Center (TARDEC).

 

http://www.nextenergy.org/services/collaborativeprograms/70mpahydrogen.aspx 

ITM will use its own IPR in providing the design study for Next Energy and will share any incremental IP generated within the contract with NextEnergy. ITM's existing IPR remains protected. The completion of the sub-contract may result in a joint venture with NextEnergy taking the design into prototype production and manufacture or licensing agreements.

 

 

Dr. Graham Cooley, CEO of ITM Power plc commented; "This agreement with Next Energy is an excellent opportunity for ITM to consolidate its considerable engineering expertise and experience in home refuelling whilst at the same time gaining exposure to the worlds largest automotive OEM's. The Next Energy project will put ITM on the world automotive stage."

 

Chuck Moeser, CHMM, Senior Consultant for Contract Development at Next Energy commented;"We are delighted to be working with ITM Power plc a pioneer in the field of home refuelling. The de-carbonization of the automotive sector is a significant focus for the US."

 

 

Note to Editors:

 

NextEnergy is a non-profit organization, founded in 2002 with assistance from the Michigan Economic Development Corporation (MEDC). Its initial charge was to implement an economic development strategy for the State of Michigan to accelerate research, development and manufacturing of Alternative Energy Technologies (AET) to advance the AET industry in Michigan. NextEnergy is now one of the USA's leading research catalysts and business accelerators for alternative and renewable energy.

http://www.nextenergy.org 

 

Since early 2007, NextEnergy has hosted the Fueling Specification for 70 MPa Compressed Hydrogen Vehicles on its website. In addition to providing the document for public review, NextEnergy managed the process of collecting, reviewing and editing content based on public comments regarding this specification. A Steering Committee provided technical oversight for the Fueling Specification. The Steering Committee consisted of NextEnergy and the following OEMs: General Motors, Ford Motor Company, DaimlerChrysler, Toyota, Nissan, Hyundai-Kia Motors and Volkswagen, as well as Air Liquide and Linde.

 

NextEnergy's role is to support the US DOE "Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project" in the greater Detroit area; to integrate, within a core urban environment, critical hydrogen infrastructure components and systems for multi-use operations; to optimize integrated, system-based solutions to advance hydrogen infrastructure for vehicular and stationary distributed power generation use; and to provide a flexible "test" platform to advance the development and validation of commercial-type on-site generation technologies.

 

ITM Power has developed a range of materials and technology to reduce the cost of hydrogen production. The company is developing equipment to convert renewable energy to a clean fuel; storing the energy as green hydrogen for decarbonising transport, industrial and residential applications.

 

 

For further information please visit www.itm-power.com or contact:

 

ITM Power plc

Graham Cooley, CEO

0114 244 5111

 

Panmure Gordon & Co.

Andrew Godber

 

020 7459 3600

 

 

Tavistock Communications

Simon Hudson / James Midmer

 

020 7920 3150

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCAIMPTMBBTBTM
Date   Source Headline
15th May 20244:43 pmRNSDirector/PDMR Shareholding
8th May 20246:00 pmRNSTotal Voting Rights
26th Apr 20247:00 amRNSPartnership with Hygen for industry growth
16th Apr 20241:32 pmRNSDirector/PDMR Shareholding
15th Mar 20244:00 pmRNSDirector/PDMR Shareholding
16th Feb 20244:00 pmRNSDirector/PDMR Shareholding
5th Feb 20244:00 pmRNSBlock listing Interim Review
31st Jan 20247:00 amRNSInterim Results
16th Jan 20244:00 pmRNSDirector/PDMR Shareholding
15th Jan 20247:00 amRNSNotice of Interim Results and Presentation
15th Dec 20234:00 pmRNSDirector/PDMR Shareholding
11th Dec 20237:00 amRNS100MW Capacity Reservation
4th Dec 20237:00 amRNSTrading Update
15th Nov 20234:00 pmRNSDirector/PDMR Shareholding
8th Nov 20237:00 amRNSLaunch of Hybrid Stack
30th Oct 20237:00 amRNSGrants under Long Term Incentive Plan
20th Oct 20237:00 amRNSITM announces completed sale of Motive Fuels Ltd
16th Oct 20237:00 amRNSEntry into the US market
13th Oct 20234:00 pmRNSDirector/PDMR Shareholding
19th Sep 20237:00 amRNSDirector/PDMR Shareholding
15th Sep 20234:00 pmRNSDirector/PDMR Shareholding
11th Sep 20234:30 pmRNSTotal Voting Rights
11th Sep 20234:30 pmRNSBlock listing Interim Review
1st Sep 20237:00 amRNSNotice of Annual General Meeting and Annual Report
17th Aug 20237:01 amRNSITM Power releases POSEIDON 20MW module
17th Aug 20237:00 amRNSITM Power PLC: Final Results
15th Aug 20234:00 pmRNSDirector/PDMR Shareholding
14th Aug 20237:00 amRNSHeads of Terms for sale of Motive Fuels Ltd
26th Jul 20237:00 amRNSRoadmap for strategic collaboration with Gore
25th Jul 20237:00 amRNSUpdate on timing of FY23 results announcement
17th Jul 202311:00 amRNSITM Power contract award towards 100MW project
17th Jul 20239:46 amRNSDirector/PDMR Shareholding
10th Jul 20237:00 amRNSITM Power Expands in Germany
3rd Jul 20237:00 amRNSStrategic collaboration with Mott Corporation
30th Jun 20237:00 amRNSUKCA Accreditation Received
15th Jun 20234:00 pmRNSDirector/PDMR Shareholding
14th Jun 20234:00 pmRNSHolding(s) in Company
1st Jun 20237:00 amRNSTrading Update
16th May 20234:00 pmRNSDirector/PDMR Shareholding
17th Apr 20234:00 pmRNSDirector/PDMR Shareholding
3rd Apr 20237:00 amRNSAdditional facilities at Bessemer Park
24th Mar 202312:33 pmRNSDirector/PDMR Shareholding
16th Mar 20234:00 pmRNSDirector/PDMR Shareholding
14th Mar 20237:00 amRNSExpanding test capacity
16th Feb 20235:00 pmRNSDirector/PDMR Shareholding
14th Feb 20237:00 amRNSLTIP Grant
3rd Feb 20236:00 pmRNSBlock listing Interim Review
31st Jan 20237:00 amRNSInterim Results and Strategic Update
23rd Jan 20237:00 amRNSNotice of Interim Results
17th Jan 20234:00 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.