Less Ads, More Data, More Tools Register for FREE

Pin to quick picksInvinity Energy Regulatory News (IES)

Share Price Information for Invinity Energy (IES)

Share Price is delayed by 15 minutes
Get Live Data
37.75    1.40 (3.86%)
Bid:
37.00
Ask:
38.50
Spread: 1.50 (4.054%)
Market Cap: £214.43m
IES Live PriceLast checked at - London Stock Exchange

Intraday Invinity Energy Share Chart

Invinity's Largest Battery Goes Live

22 Sep 2023 09:00

RNS Number : 3661N
Invinity Energy Systems PLC
22 September 2023
 

 

22 September 2023

Invinity Energy Systems plc

 

("Invinity" or the "Company")

 

Invinity's Largest Battery System to Date Goes Live

The Chappice Lake Solar & Storage system is now powering the Alberta Grid

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) a leading global manufacturer of utility-grade energy storage, is pleased to announce that the Company's Canadian partner Elemental Energy has officially commenced operation of its 8.4 MWh Invinity VS3 vanadium flow battery ("VFB") at their Chappice Lake Solar & Storage Project site in Alberta, Canada (see picture below). This is Invinity's largest operational battery to date, and the largest vanadium flow battery serving the North American grid.

 

 

Located in one of the sunniest places in Canada and in a province historically known as one of North America's major centres for oil production, the project features a 21 MWp solar array coupled with an 8.4 MWh VFB. A Canadian first in terms of size and application, this project will now generate enough dispatchable, low-cost, low-carbon electricity to serve the needs of over 7,000 Alberta residents with clean, on-demand solar power and is targeting carbon savings of approximately 20,000 tCO2e per year.

 

Above: Inside the 8.4 MWh Invinity VS3 vanadium flow battery system at Chappice Lake, Alberta, Canada

 

At the ribbon-cutting event held yesterday at the site near Medicine Hat, Alberta, representatives from Elemental Energy and Invinity joined a broad range of project partners and stakeholders to celebrate this exciting phase of the project. These included representatives from project funder Emissions Reduction Alberta, ownership partner Cold Lake First Nations, and representatives from many of the engineering, technical and construction service providers who contributed to the project.

 

Above: Jamie Houssian, Principal, Elemental Energy and Heather Bishop, Director of Economic Development, Cold Lake First Nations with representatives from Invinity and invited guests at the ribbon-cutting ceremony of the Chappice Lake Solar & Storage project

 

Invinity's Vancouver-based partner on the project Elemental Energy is a leading private renewable energy development company with over 100 MW of wind, solar and hydro projects in construction or operation throughout North America and has a further 1GW of projects under development.

 

Jamie Houssian, Principal at Elemental Energy said:

 

"This project, through its innovative pairing of a 21 MWp solar farm with Invinity's 8.4 MWh vanadium flow battery, will bring tremendous value to Elemental Energy and our partner, Cold Lake First Nations, as well as to the Alberta electricity grid by enabling us to deliver power when it is needed the most."

 

Matt Harper, Chief Commercial Officer at Invinity said:

 

"This is a proud moment for Invinity. Not only is our largest project to date now in revenue service, but we have proven the capabilities of a great partnership alongside Elemental Energy and Cold Lake First Nations. This achievement is further proof that Invinity's products can apply their ability to cycle almost indefinitely over long durations to significantly increase economic returns for renewable generation projects worldwide. We look forward to working with Elemental to continue to optimize how this project can serve Alberta's grid, and to using the Chappice Lake project to increase awareness of the critical role Invinity's vanadium flow batteries will play in the world's transition to 24/7 renewable energy."

 

Stay up to date with news from Invinity. Join the distribution list for the Company's monthly investor newsletter here.

 

Enquiries:

 

Invinity Energy Systems plc

+44 (0)20 4551 0361

Jonathan Marren, Chief Development Officer and Interim CFO

Joe Worthington, Director of Communications

Tavistock (Financial PR Advisor)

+44 (0)20 7920 3150

Simon Hudson / Charles Baister

invinity@tavistock.co.uk

 

Notes to Editors

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) manufactures vanadium flow batteries for large-scale, high-throughput energy storage requirements of business, industry and electrical networks.

 

Invinity's factory-built flow batteries run continually with no degradation for over 25 years, making them suitable for the most demanding applications in renewable energy production. Energy storage systems based on Invinity's batteries are safe, reliable, and economical, and range in size from less than 250 kilowatt-hours to tens of megawatt-hours.

 

Invinity was created in April 2020 through the merger of two flow battery industry leaders: redT energy plc and Avalon Battery Corporation. With over 65 MWh of systems already deployed or contracted for delivery across over 70 sites in 15 countries, Invinity is active in all major global energy storage markets and has operations in the UK, Canada, USA, China and Australia. Invinity Energy Systems plc is listed in the UK on AIM and AQSE and trades in the USA on OTCQX.

 

To find out more, visit invinity.com, sign up to our monthly Investor Newsletter here or contact Investor Relations on via +44 (0)20 4551 0361 or ir@invinity.com 

 

 

About Reach announcements

 

This is a Reach announcement. Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases into the public domain. Information required to be notified under the AIM Rules for Companies, Market Abuse Regulation or other regulation would be disseminated as an RNS regulatory announcement and not on Reach.

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRADLLBLXKLZBBZ
Date   Source Headline
1st Jun 20264:18 pmRNSNotice of AGM and Posting of Annual Report
1st Jun 20267:01 amRNS2 MWh Sale to U.S. C&I Customer
1st Jun 20267:00 amRNS2025 Financial Results
21st May 20267:00 amRNSInvinity Selected to Design GWh-Scale VFB System
12th May 20267:00 amRNS-RInvinity Delivers Europe’s Largest VFB
5th May 20267:00 amRNSTrading and Commercial Update
24th Feb 20264:02 pmRNSHolding(s) in Company
5th Feb 20267:00 amRNS-RInvinity Enhances U.S. Commercial Presence
9th Jan 20262:30 pmRNS-RSecretary of State for Scotland Visits Bathgate
2nd Jan 20267:02 amRNSBlocklisting Interim Review
2nd Jan 20267:02 amRNSBlocklisting Interim Review
2nd Jan 20267:00 amRNS20 MWh New EU Sales and Year End Trading Update
2nd Jan 20267:00 amRNS20 MWh New EU Sales and Year End Trading Update
29th Dec 20257:00 amRNSFirst Endurium Enterprise Order
29th Dec 20257:00 amRNSFirst Endurium Enterprise Order
22nd Dec 20257:00 amRNS12 MWh Sale for U.S. Project
22nd Dec 20257:00 amRNS12 MWh Sale for U.S. Project
19th Dec 20252:27 pmRNSHolding(s) in Company
19th Dec 20252:27 pmRNSHolding(s) in Company
16th Dec 20257:00 amRNS-RFirst Phase of 20.7 MWh UK Project Delivered
12th Dec 20254:00 pmRNSChange of Registered Office
11th Dec 20257:00 amRNS-RU.S. Energy Secretary Charges Invinity VFB at PNNL
19th Nov 20257:00 amRNSConstruction Begins at LoDES Project Site
2nd Oct 202511:08 amRNSHolding(s) in Company
1st Oct 202512:00 pmRNSHolding(s) in Company
30th Sep 20257:00 amRNS2025 Interim Results
29th Sep 202511:25 amRNSResult of Meeting and Total Voting Rights
23rd Sep 20251:07 pmRNS16.7 GWh of Endurium Bids Eligible for Cap & Floor
18th Sep 20257:00 amRNS4 MWh Sale to Hungarian Reseller Partner
11th Sep 202510:45 amRNSPosting of Circular and Notice of General Meeting
9th Sep 20258:06 amRNSReplacement RNS: £25m Investment and New Partner
9th Sep 20257:00 amRNS£25m Investment and New Strategic Partner
8th Sep 20253:00 pmRNS-RInvinity Launches Endurium Enterprise
8th Sep 20257:00 amRNSMoU to Expand Strategic Relationships in China
1st Aug 20257:01 amRNS10.8 MWh ENDURIUM Order Confirmed
1st Aug 20257:00 amRNSLoDES Planning Application Approved
11th Jul 202511:25 amRNSChinese Strategic Partnership
10th Jul 20254:30 pmRNSResult of Annual General Meeting
2nd Jul 20257:00 amRNSBlock listing Interim Review
23rd Jun 20257:01 amRNSENDURIUM Selected for UK LDES Cap & Floor Bids
23rd Jun 20257:00 amRNSHolding(s) in Company
17th Jun 20253:00 pmRNSNotice of Annual General Meeting
5th Jun 20257:00 amRNSAppointment of Non-Executive Director
3rd Jun 20253:37 pmRNSHolding(s) in Company
3rd Jun 20257:00 amRNSHolding(s) in Company
30th May 20257:00 amRNS2024 Financial Results
29th May 202511:23 amRNS-RUK Energy Minister Tours Invinity Bathgate Factory
24th Apr 20253:30 pmRNS-RInvinity Hosts BC and Vancouver Elected Officials
16th Apr 20257:00 amRNS-RStrategic Partner Secures LDES Project Connections
4th Apr 20254:36 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.