Less Ads, More Data, More Tools Register for FREE

Pin to quick picksInvinity Energy Regulatory News (IES)

Share Price Information for Invinity Energy (IES)

Share Price is delayed by 15 minutes
Get Live Data
36.00    -2.50 (-6.41%)
Bid:
35.50
Ask:
36.50
Spread: 1.00 (2.817%)
Market Cap: £207.60m
IES Live PriceLast checked at - London Stock Exchange

Intraday Invinity Energy Share Chart

Invinity's Largest Battery Goes Live

22 Sep 2023 09:00

RNS Number : 3661N
Invinity Energy Systems PLC
22 September 2023
 

 

22 September 2023

Invinity Energy Systems plc

 

("Invinity" or the "Company")

 

Invinity's Largest Battery System to Date Goes Live

The Chappice Lake Solar & Storage system is now powering the Alberta Grid

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) a leading global manufacturer of utility-grade energy storage, is pleased to announce that the Company's Canadian partner Elemental Energy has officially commenced operation of its 8.4 MWh Invinity VS3 vanadium flow battery ("VFB") at their Chappice Lake Solar & Storage Project site in Alberta, Canada (see picture below). This is Invinity's largest operational battery to date, and the largest vanadium flow battery serving the North American grid.

 

 

Located in one of the sunniest places in Canada and in a province historically known as one of North America's major centres for oil production, the project features a 21 MWp solar array coupled with an 8.4 MWh VFB. A Canadian first in terms of size and application, this project will now generate enough dispatchable, low-cost, low-carbon electricity to serve the needs of over 7,000 Alberta residents with clean, on-demand solar power and is targeting carbon savings of approximately 20,000 tCO2e per year.

 

Above: Inside the 8.4 MWh Invinity VS3 vanadium flow battery system at Chappice Lake, Alberta, Canada

 

At the ribbon-cutting event held yesterday at the site near Medicine Hat, Alberta, representatives from Elemental Energy and Invinity joined a broad range of project partners and stakeholders to celebrate this exciting phase of the project. These included representatives from project funder Emissions Reduction Alberta, ownership partner Cold Lake First Nations, and representatives from many of the engineering, technical and construction service providers who contributed to the project.

 

Above: Jamie Houssian, Principal, Elemental Energy and Heather Bishop, Director of Economic Development, Cold Lake First Nations with representatives from Invinity and invited guests at the ribbon-cutting ceremony of the Chappice Lake Solar & Storage project

 

Invinity's Vancouver-based partner on the project Elemental Energy is a leading private renewable energy development company with over 100 MW of wind, solar and hydro projects in construction or operation throughout North America and has a further 1GW of projects under development.

 

Jamie Houssian, Principal at Elemental Energy said:

 

"This project, through its innovative pairing of a 21 MWp solar farm with Invinity's 8.4 MWh vanadium flow battery, will bring tremendous value to Elemental Energy and our partner, Cold Lake First Nations, as well as to the Alberta electricity grid by enabling us to deliver power when it is needed the most."

 

Matt Harper, Chief Commercial Officer at Invinity said:

 

"This is a proud moment for Invinity. Not only is our largest project to date now in revenue service, but we have proven the capabilities of a great partnership alongside Elemental Energy and Cold Lake First Nations. This achievement is further proof that Invinity's products can apply their ability to cycle almost indefinitely over long durations to significantly increase economic returns for renewable generation projects worldwide. We look forward to working with Elemental to continue to optimize how this project can serve Alberta's grid, and to using the Chappice Lake project to increase awareness of the critical role Invinity's vanadium flow batteries will play in the world's transition to 24/7 renewable energy."

 

Stay up to date with news from Invinity. Join the distribution list for the Company's monthly investor newsletter here.

 

Enquiries:

 

Invinity Energy Systems plc

+44 (0)20 4551 0361

Jonathan Marren, Chief Development Officer and Interim CFO

Joe Worthington, Director of Communications

Tavistock (Financial PR Advisor)

+44 (0)20 7920 3150

Simon Hudson / Charles Baister

invinity@tavistock.co.uk

 

Notes to Editors

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) manufactures vanadium flow batteries for large-scale, high-throughput energy storage requirements of business, industry and electrical networks.

 

Invinity's factory-built flow batteries run continually with no degradation for over 25 years, making them suitable for the most demanding applications in renewable energy production. Energy storage systems based on Invinity's batteries are safe, reliable, and economical, and range in size from less than 250 kilowatt-hours to tens of megawatt-hours.

 

Invinity was created in April 2020 through the merger of two flow battery industry leaders: redT energy plc and Avalon Battery Corporation. With over 65 MWh of systems already deployed or contracted for delivery across over 70 sites in 15 countries, Invinity is active in all major global energy storage markets and has operations in the UK, Canada, USA, China and Australia. Invinity Energy Systems plc is listed in the UK on AIM and AQSE and trades in the USA on OTCQX.

 

To find out more, visit invinity.com, sign up to our monthly Investor Newsletter here or contact Investor Relations on via +44 (0)20 4551 0361 or ir@invinity.com 

 

 

About Reach announcements

 

This is a Reach announcement. Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases into the public domain. Information required to be notified under the AIM Rules for Companies, Market Abuse Regulation or other regulation would be disseminated as an RNS regulatory announcement and not on Reach.

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRADLLBLXKLZBBZ
Date   Source Headline
13th Dec 202211:05 amRNSSecond Price Monitoring Extn
13th Dec 202211:00 amRNSPrice Monitoring Extension
13th Dec 20227:00 amRNS1.5 MWh Sale to Hyosung Heavy Industries
7th Dec 20224:40 pmRNSSecond Price Monitoring Extn
7th Dec 20224:35 pmRNSPrice Monitoring Extension
1st Dec 20224:41 pmRNSSecond Price Monitoring Extn
1st Dec 20224:36 pmRNSPrice Monitoring Extension
1st Dec 20222:06 pmRNSSecond Price Monitoring Extn
1st Dec 20222:00 pmRNSPrice Monitoring Extension
1st Dec 202211:14 amRNS15 MWh Taiwan Sale, 255 MWh Follow-on Potential
1st Dec 20227:00 amRNSTotal Voting Rights
22nd Nov 20225:16 pmRNSResult of Capital Reorganisation EGM
21st Nov 20227:00 amRNS2.2 MWh Sale to Taiwanese Resale Partner
4th Nov 20227:00 amRNSProposed Capital Reorganisation and Notice of EGM
1st Nov 20227:00 amRNSTotal Voting Rights
21st Oct 20227:00 amRNS10 MWh California Sale Contract Executed
13th Oct 20227:00 amRNSLargest Project to Date Wins CEC Funding
12th Oct 20227:00 amRNS0.8 MWh Sale to Equans Belux
7th Oct 20227:00 amRNS1.3 MWh Sale to U.S. Datacenter
6th Oct 20225:33 pmRNSHolding(s) in Company
3rd Oct 20227:00 amRNSTotal Voting Rights
29th Sep 20227:00 amRNSInterim Results, Current Trading and Board Changes
21st Sep 20226:02 pmRNSBlocklisting Applications
21st Sep 20228:00 amRNSBlocklisting Applications
1st Sep 20225:50 pmRNSHolding(s) in Company
31st Aug 20222:17 pmRNSResult of AGM & Short-Term Warrant General Meeting
30th Aug 20227:00 amRNSInvinity Completes Manufacturing Expansion
18th Aug 20227:00 amRNS1.8 MWh EMEC Battery System Successfully Energised
16th Aug 20224:41 pmRNSSecond Price Monitoring Extn
16th Aug 20224:36 pmRNSPrice Monitoring Extension
16th Aug 20227:00 amRNSMoU Signed for Joint Venture with U.S. Vanadium
12th Aug 20227:00 amRNSNotice of AGM & Short-Term Warrant General Meeting
9th Aug 20229:00 amRNSUS Climate Legislation Set to Boost Energy Storage
8th Aug 20227:00 amRNSCommencement of U.S. Trading on OTCQX
12th Jul 20221:30 pmRNSDirector/PDMR Shareholding
11th Jul 20227:00 amRNSGrant of Share Options
7th Jul 20227:00 amRNSAppointment of Chief Development Officer
5th Jul 20227:00 amRNSEnergy Superhub Oxford goes live
29th Jun 202212:00 pmRNSMailing of Annual Report
27th Jun 20227:00 amRNS2021 Full Year Results and Current Trading
23rd Jun 20228:24 amRNSReplacement Notice of Results & Presentation
23rd Jun 20227:00 amRNSNotice of Results & Investor Presentation
18th May 20227:00 amRNSExecuting on U.S. Strategy
12th May 20227:00 amRNSExercise of Warrants
29th Apr 20227:00 amRNSExercise of Warrants
19th Apr 20227:00 amRNSInvinity Receives ISO Certifications
11th Apr 202211:06 amRNSSecond Price Monitoring Extn
11th Apr 202211:00 amRNSPrice Monitoring Extension
8th Apr 20227:00 amRNSSuccessful Product Test and MOU with Hyosung
9th Mar 20227:00 amRNSAdmission to Trading on AQSE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.