We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHochschild Regulatory News (HOC)

Share Price Information for Hochschild (HOC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 161.40
Bid: 160.20
Ask: 160.60
Change: 0.00 (0.00%)
Spread: 0.40 (0.25%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 161.40
HOC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Azuca scoping study update

30 Sep 2010 07:00

RNS Number : 5780T
Hochschild Mining PLC
30 September 2010
 



 

 

30 September 2010 

 

Positive scoping study at 100% owned Azuca project in Peru

Moving forward with increased drilling and prefeasibility study

 

·; Total global resources of 60.8 million silver equivalent ounces

·; Estimated initial silver equivalent production of 3.5 million ounces per year on average, representing more than 13% of Hochschild's 2010 attributable production

·; Estimated total cash operating cost of $71 per tonne

·; Project now at pre-feasibility stage, with targeted completion in H2 2011

·; Significant geological potential and ongoing intensive drilling campaign to develop additional resources

 

Hochschild Mining plc ("Hochschild") is pleased to announce positive results from a scoping study completed by an independent party at its 100% owned Azuca project, located in the Company's existing operating cluster in southern Peru. Results of the scoping study indicate that at base case gold and silver prices of $1,000/oz and $17/oz respectively, the project could return a cumulative total pre-tax cash flow1 of approximately $107 million and 21% IRR. Using spot prices for gold and silver of $1,300/oz and $21.9/oz respectively, the project could return a cumulative total pre-tax cash flow2 of approximately $247 million and 46% IRR. The study assumes initial plant throughput of 750 tonnes per day with engineering designed to easily accommodate future capacity increases.

 

Azuca has reached global resources of 60.8 million silver equivalent ounces and is now in pre-feasibility stage with targeted completion in H2 2011. The Company is undertaking an intensive drilling campaign to develop additional resources with a view to continue extending the scale and profitability of the project.

 

Ignacio Bustamante, CEO of Hochschild Mining plc commented:

 

"We are pleased to announce positive results from the Azuca scoping study which is an important step towards establishing an additional producing asset in our southern Peru cluster. The results of the study confirm that Azuca has the potential to become a profitable mine and we will now progress the project to pre-feasibility stage which we aim to complete in H2 2011. Today's announcement demonstrates our continued focus on value creation through organic growth by developing our high quality project portfolio. We envision moving forward aggressively to advance this project."

 

Raymond Jannas, VP of Exploration commented:

 

"In addition to the results announced today, we are extremely confident about the growth potential of the asset, which remains geologically open in several of its structures and presents other mineralised areas yet to be explored. With nine rigs on site and a highly experienced team of geologists, we are now focused on an intensive drilling campaign to continue extending the scale, size and profitability of the project."

 

Highlights of scoping study3 (base case using $1,000 per ounce ("/oz") gold and $17/oz silver and a 60:1 silver-to-gold equivalent ratio):

 

·; Conceptual mine production of 2.3 million tonnes at an average grade of 362 g/t silver and 1.45 g/t gold, focusing on the higher grade zones of the deposit (As detailed in Table 1 below)

·; Recovered ounces: 96,743 ounces gold and 24.1 million ounces silver or approximately 29.9 million ounces of silver equivalent (based on metallurgical recoveries of 89% for both gold and silver)

·; Pre-tax cash flows: $107 million non-discounted, $61 million at a 5% discount rate and $32 million at a 10% discount rate

·; Cumulative total pre-tax internal rate of return ("IRR"): 21%

·; Total cash operating cost: $71 per tonne

·; Initial capital expenditure of $75 million plus life of mine capex of $96 million

·; 750 tonnes per day ("tpd") underground mine

 

1Non-discounted

2Non-discounted

3Results of scoping study can vary by +/- 30%

 

Table 1: Azuca resources and mineable resources:  

 

Resources

Tonnage

Ag g/t

Au g/t

Ag eq g/t

Ag eq moz

Total resource

5,521,841

266

1.27

343

60.8

Resource in higher grade zones

2,564,594

393

1.82

502

42.0

Resource used for conceptual mine production*

2,330,58

362

1.45

449

33.2

* Includes mine dilution and mine loss

 

Please click on the link below to view a map of the location and geological footprint of the Azuca project within Hochschild's southern Peru cluster: http://www.rns-pdf.londonstockexchange.com/rns/5780T_-2010-9-30.pdf

 

 

  

 

 

Table 2: Azuca project scoping study4 - initial results:

 

Item

Units

Mine life

years

8.5

Average annual silver production

ounces/year (millions)

2.7

Average annual gold production

ounces/year (thousands)

10.8

Average annual silver equivalent production

Au eq ounces/year (millions)

3.5

Life-of-mine silver production

ounces

24.1

Life-of-mine silver equivalent production

Ag eq. ounces (millions)

29.9

Plant processing rate (~750 tonnes per day)

tonnes/year (thousands)

274

Metallurgical recovery - gold

%

89.3%

Metallurgical recovery - silver

%

89.0%

Total cash operating cost

per tonne processed

$71.4

Total cash operating cost

per ounce Ag eq.

$5.6

Total cash operating cost, inc capital

per ounce Ag eq.

$11.3

Total cash operating cost (by-product)

per ounce Ag (Au credit)

$3.1

Total cash operating cost inc capital (by-product)

per ounce Ag (Au credit)

$10.2

 

 

Table 3: Azuca project sensitivity analysis (base case in bold and highlighted):

 

Gold price/silver price ($/oz)

Category

$1,000/

$17.00

$1,100/

$18.70

$1,200/

$20.40

$1,300/

$21.90

IRR (%)

21

30

38

46

Cash Flow ($ millions)

107

155

204

247

NPV 5% ($ millions)

61

97

133

165

NPV 10% ($ millions)

32

60

87

112

Cash flow and NPV's are all shown pre-tax, but do include smelter and transportation charges. Value added tax (generally recoverable in Peru) was not included in the cash flows.

 

Mining & processing assumptions

 

The mine design concept for the Azuca project is to utilise cut and fill, which is also used at Hochschild's Arcata mine. The ore is mined in vertical slices and extracted with micro-scoops. Filling activity will be performed using tailings through hydraulic fill.

 

The base case processing plan for the Azuca project envisages crushing and grinding, followed by flotation to generate a saleable gold-silver concentrate, with a concentration ratio of 42.8.

 

Mineral resource estimate details

 

The resource estimate is reported at a cut-off grade of 249 g/t silver equivalent (using a silver to gold ratio of 60:1), which approximates the cut-off grade for the underground mining and flotation process option selected for Azuca, using base-case silver and gold prices of $13.50 and $810 per ounce respectively. The cut-off grade is a factor of operating costs, metallurgical recoveries and prices; it is therefore possible that a lower or higher cut-off grade could be applied in the future.

 

4 Results of scoping study can vary by +/- 30%

 

 

 

___________________________________________________________________________

Enquiries:

Hochschild Mining plc

 

Isabel Lütgendorf +44 (0)20 7907 2934

Head of Investor Relations

 

Finsbury

Faeth Birch +44 (0)20 7251 3801

Public Relations

___________________________________________________________________________

 

 

About Hochschild Mining plc:

Hochschild Mining plc is a leading precious metals company listed on the London Stock Exchange (HOCM.L / HOC LN) with a primary focus on the exploration, mining, processing and sale of silver and gold. Hochschild has over forty years' experience in the mining of precious metal epithermal vein deposits and currently operates four underground epithermal vein mines, three located in southern Peru, one in southern Argentina and one open pit mine in northern Mexico. Hochschild also has numerous long-term prospects throughout the Americas.

 

Forward looking statements:  

 

This announcement may contain forward looking statements. By their nature, forward looking statements involve risks and uncertainties because they relate to events and depend on circumstances that will or may occur in the future. Actual results, performance or achievements of Hochschild Mining plc may, for various reasons, be materially different from any future results, performance or achievements expressed or implied by such forward looking statements.

 

The forward looking statements reflect knowledge and information available at the date of preparation of this announcement. Except as required by the Listing Rules and applicable law, the Board of Hochschild Mining plc does not undertake any obligation to update or change any forward looking statements to reflect events occurring after the date of this announcement.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUGDCBUXBGGG
Date   Source Headline
24th Apr 20247:00 amRNSQ1 Production Report
2nd Apr 20247:00 amRNSSale of Crespo project for $15 million
13th Mar 20247:00 amRNSFinal Results
6th Mar 20247:00 amRNSNotice of Results and Investor Presentation
5th Mar 20247:00 amRNSOption to acquire Monte Do Carmo project, Brazil
23rd Feb 202411:01 amRNSDirector Declaration
21st Feb 20247:00 amRNSFirst Gold Pour at Mara Rosa
31st Jan 20248:33 amRNSDirector Declaration
24th Jan 20247:00 amRNSQ4 2023 Production Report
19th Jan 20242:58 pmRNSHolding in Company
14th Dec 20237:00 amRNSDirectorate Change
8th Dec 202311:00 amRNSAGM Update
22nd Nov 20239:42 amRNSCapital Markets event & 2024 Guidance - Correction
22nd Nov 20237:00 amRNSCapital Markets event & 2024 Guidance
17th Nov 202312:37 pmRNSHolding in Company
16th Nov 20237:00 amRNSNotice of retail investor presentation
18th Oct 20237:00 amRNSQ3 2023 Production Report
21st Sep 20237:00 amRNSAppointment of Non-Executive Director
6th Sep 20237:00 amRNSInterim Results
29th Aug 20237:00 amRNSConfirmation of Board and Management changes
17th Aug 20234:38 pmRNSHolding in Company
14th Aug 20237:00 amRNSHochschild Provides Update on Volcan Gold Project
11th Aug 20239:30 amRNSHolding in Company
4th Aug 202310:53 amRNSHolding in Company
2nd Aug 20237:00 amRNSInmaculada Environmental Permit Approved
25th Jul 20237:00 amRNSQ2 2023 Production Report
10th Jul 20236:05 pmRNSHolding in Company
30th Jun 20234:05 pmRNSReport on Payments to Governments 2022
9th Jun 20234:16 pmRNSAGM Result
31st May 202311:52 amRNSTotal Voting Rights
30th May 20237:00 amRNSHochschild Announces Leadership Transition
12th May 20235:51 pmRNSAdditional Listing & Voting Rights
10th May 20237:00 amRNSQ1 2023 Production Report
5th May 20232:14 pmRNSDirector Declaration
28th Apr 20233:59 pmRNS2022 Annual Report and Notice of 2023 AGM
20th Apr 20237:00 amRNSFinal Results
5th Apr 20237:00 amRNSHochschild Terminates Option Over Snip Gold
31st Mar 20237:00 amRNSInmaculada Permit Update
31st Jan 20237:00 amRNSQ4 2022 Production Report
30th Dec 20227:00 amRNSInmaculada Permit Update
15th Nov 20225:00 pmRNSHolding in Company
3rd Nov 20227:00 amRNSInmaculada Update
26th Oct 20227:00 amRNSQ3 2022 Production Report
20th Sep 20227:09 amRNSLaunch of New Website
5th Sep 20223:07 pmRNSConversion Rate for 2022 Interim Dividend
17th Aug 20227:00 amRNSInterim Results
16th Aug 20229:57 amRNSPublication of Sustainability Report for 2021
12th Aug 20222:06 pmRNSInvestor Presentation
10th Aug 20227:00 amRNSEnvironmental authorisation at Mara Rosa granted
22nd Jul 20229:55 amRNSDirector Declaration

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.