Kekura Feasibility Study and Resource Update

6 Feb 2018 07:00

RNS Number : 9496D
Highland Gold Mining Limited
06 February 2018
 

HIGHLAND GOLD MINING LIMITED

 

Kekura Feasibility Study and Resource Update

 

06 February 2018

 

 

Highland Gold Mining Limited ("Highland Gold" or the "Company", AIM: HGM) today announces results from a Definitive Feasibility Study ("DFS") and updated JORC-compliant Mineral Resource and Ore Reserve estimates ("Resource Update") completed by international consultancy Fluor with input from SRK. An executive summary of the report will be available shortly on the Company's website (www.highlandgold.com).

 

Kekura, located in the Chukotka region in Russia's Far East, is the Company's flagship development project. Substantial exploration work and technical studies have already been completed to date, with production targeted to commence in 2021.

 

DFS HIGHLIGHTS

 

Resource Update for Kekura with total gold reserves of 2.0 Moz at a grade of 7.0 g/t versus the previously reported 1.7 Moz at a grade of 10.7 g/t (1 January 2017).The DFS envisages a sequential and combined open-pit and underground operation with an estimated total mine life of 16 years, compared to eight years projected in the preliminary feasibility study.Expected mill head grade of 7.49 g/t for the first nine years of plant operation, and 5.58 g/t for the final seven years. Open-pit mining planned for the first four years, with combined open-pit and underground operations starting from year five. Mining and processing plant capacity of 800 ktpa, with volumes dropping to 300 ktpa in the final seven years as mining operations move completely underground. Gold mineralisation at Kekura is primarily non-refractory and can be recovered through a conventional gravity with respective cyanidation flowsheet, with expected total recoveries exceeding 85%.Power supply from the regional electrical grid, versus previously-planned self-generation.Expected capital costs of US$ 229 million.Average annual gold production of 172 koz for the first eight years of operation and 46 koz for the final eight years.Total life of mine production of 1.744 Moz at an average total cash cost of US$ 511/oz and all-in sustaining costs of US$ 541/oz.Post-tax NPV@10% of US$ 311 million and IRR of 38%, excluding historical costs and based on a gold price of US$ 1250/oz.

 

Kekura enjoys a high-grade mineral resource base. The Resource Update contained in the DFS was prepared using data collected from geological exploration in the period from 2006 to 2017, including exploration drilling and pilot mining.

 

 

 

Mineral Resources of the Kekura Deposit*

In accordance with the JORC Code (2012) as of 01 January 2018

 

 

Ore

(MT)

Au

(g/t)

Contained Au

(tonnes)

Contained Au

(Moz)

Measured

0.58

11.0

6.5

0.206

Indicated

8.72

8.0

69.5

2.231

Inferred

0.16

3.3

0.5

0.017

Total

9.46

8.1

76.5

2.454

 

* Notes:

- Mineral Resources are reported inclusive of ore reserves.

- Cut-off grade of 1.0 g/t

 

 

Ore Reserves of the Kekura Deposit**

In accordance with the JORC Code (2012) as of 01 January 2018

 

 

 

Ore

(MT)

Au

(g/t)

Contained Au

(tonnes)

Contained Au

(Moz)

Proven

Open Pit

0.65

9.24

6.0

0.193

 

Underground

-

-

-

-

 

Total

0.65

9.24

6.0

0.193

Probable

Open Pit

5.10

7.82

39.9

1.282

 

Underground

3.13

5.31

16.6

0.534

 

Total

8.23

6.86

56.5

1.815

Total

 

8.88

7.03

62.5

2.008

 

** Cut-off grade of 1.6 g/t Au is applied to the open pit and 2.0 g/t for vertical zones and 3.0 g/t for horizontal zones Au at the underground mine.

 

 

Preliminary construction work is already underway at Kekura, with the bulk of construction due to take place in 2019-2020. Key equipment will be selected and ordered this year for delivery to site in early 2019. Pre-commissioning is scheduled for late 2020 or early 2021, with ramp-up to full production in the second half of 2021.

 

The broader Kekura licence area covers nearly 1,500 square kilometres and hosts 11 additional prospects that could provide further resources for the Kekura mill. The Company has already initiated exploration drilling on the Granat prospect with results expected later this year.

 

Information contained in this release with respect to drilling and resource / reserves statements has been taken from the report "Kekura Gold Project Feasibility Study" and prepared in compliance to the JORC Code 2012 by a panel of qualified industry experts of SRK for Highland Gold Mining. The Competent Person for the estimation of Mineral Resources is Liubov Egorova, MAusIMM, who has more than 10 years relevant experience. The Competent Person for the open pit ore reserves is David Pearce, FAusIMM who has 30 years' experience in open pit mining. The Competent Person for the underground ore reserves is Michael Beare, MIMMM who has more than 20 years' experience in underground mining. Together they have verified the information pertaining to the DFS in this release. They have sufficient experience relevant to the style of mineralisation and type of deposit under consideration to qualify as Competent Persons as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves".

 

 

FOR FURTHER INFORMATION PLEASE CONTACT:

 

Highland Gold Mining Ltd.

 

John Mann, Head of Communications

+ 7 495 424 95 21

Duncan Baxter, Non-Executive Director

+ 44 (0) 1534 814 202

 

 

Numis Securities Limited

(Nominated Adviser and Joint Broker)

John Prior, James Black, Paul Gillam

+44 (0) 207 260 1000

 

BMO Capital Markets Limited

(Joint Broker)

Jeffrey Couch, Neil Haycock, Pascal Lussier Duquette

+44 (0) 207 236 1010

 

 

Peat & Co

(Joint Broker)

Charlie Peat

+44 (0) 207 104 2334

 

 

***

 

Glossary

 

JORC - Widely accepted standard for reporting mineral resources and ore reserves established by the Australasian Joint Ore Reserves Committee.

 

Mineral Resource - concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

 

Inferred Mineral Resource- that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

 

Indicated Mineral Resource - that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

 

Measured Mineral Resource- that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

 

Mineral Reserve - the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mined.

 

Probable Mineral Reserve - the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

 

Proven Mineral Reserve - is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFISFLIEIIT
Date   Source Headline
30th Jul 20201:49 pmRNSAdjournment of Annual General Meeting
9th Jul 20207:00 amRNSQ2 2020 Operating Results
6th Jul 20204:07 pmRNSTR-1: Notification of major holdings
29th Jun 20207:00 amRNSUpdate on COVID-19 Response
2nd Jun 20207:00 amRNSSale of Kayen
20th May 20207:00 amRNSMailing of 2019 Annual Report and Notice of AGM
22nd Apr 20207:00 amRNSQ1 2020 Operating Results
15th Apr 20207:00 amRNSFull Year 2019 Audited Results
9th Apr 20207:00 amRNSFull Year Results Announcement Date
20th Mar 20207:05 amRNSHGM Updates on COVID-19 Policies and Measures
19th Mar 20207:00 amRNS1st Gold Pour at Kekura and Capital Project Update
17th Mar 20207:00 amRNSExploration Licence for Krasnaya Gorka
11th Mar 20207:00 amRNSAppointment of Chief Operating Officer
21st Jan 20207:00 amRNSQ4 2019 Operating Results
12th Dec 20197:00 amRNSDividend Declaration
3rd Dec 20192:00 pmRNSHGM Conducts First Gold Sale on Moscow Exchange
2nd Dec 20197:00 amRNSDirectorate Change
21st Oct 20197:00 amRNSQ3 2019 Operating Results
3rd Sep 20197:00 amRNSInterim Results Announcement for H1 2019
28th Aug 20191:17 pmRNSInterim Results Announcement Date
19th Aug 20192:38 pmRNSDeath of a Director
19th Jul 20197:00 amRNSQ2 2019 Operating Results
3rd Jul 20197:00 amRNSKekura and Klen Admitted to Special Economic Zone
4th Jun 20192:04 pmRNSResults of Scrip Dividend Election
23rd May 201911:24 amRNSResults of Annual General Meeting
2nd May 20197:00 amRNSInterim Scrip Dividend Pricing Announcement
30th Apr 20191:13 pmRNSMailing of 2018 Annual Report and Notice of AGM
25th Apr 20197:00 amRNSQ1 2019 Operating Results
12th Apr 20197:00 amRNSFull Year 2018 Audited Results
5th Apr 20192:01 pmRNSFull Year Results Announcement Date
2nd Apr 20197:00 amRNSHIGHLAND GOLD MINING LIMITED
15th Feb 20194:34 pmRNSHolding(s) in Company
15th Feb 20197:00 amRNSDirector/PDMR Shareholdings
4th Feb 20194:06 pmRNSBlock listing Interim Review
21st Jan 20197:00 amRNSQ4 2018 Operating Results
14th Jan 20197:00 amRNSNew Reserve Audit Extends MNV Life of Mine to 2029
3rd Jan 20199:34 amRNSHolding(s) in Company
3rd Jan 20199:24 amRNSDirector/PDMR Shareholding
31st Dec 20187:00 amRNSCompletion of Acquisition and Issue of Equity
20th Dec 20181:34 pmRNSUpdate on Valunisty Acquisition
13th Dec 20187:00 amRNSDividend Declaration
18th Oct 20187:00 amRNSQ3 2018 Operating Results
17th Oct 20183:25 pmRNSHolding(s) in Company
8th Oct 20187:00 amRNSNew Branding, Website and Mission Statement
4th Sep 20187:00 amRNSInterim Results Announcement for H1 2018
29th Aug 201811:30 amRNSInterim Results Announcement Date
6th Aug 20189:25 amRNSBlock listing Interim Review
2nd Aug 201810:19 amRNSNew Exploration Licence Near MNV
26th Jul 20187:00 amRNSQ2 2018 Operating Results
24th May 20182:29 pmRNSResult of Extraordinary General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.