Interim Results Announcement for H1 2019

3 Sep 2019 07:00

RNS Number : 9702K
Highland Gold Mining Limited
03 September 2019
 

 

HIGHLAND GOLD MINING LIMITED

03 September 2019

 

 

Interim Results Announcement for H1 2019

 

 

Highland Gold Mining Limited ("Highland Gold" or the "Company" or "Group", AIM: HGM) today reports its unaudited financial results and production figures for the half year ended 30 June 2019 ("H1 2019").

 

FINANCIAL SUMMARY

 

IFRS, US$000 (unless otherwise stated)

H1 2019

H1 2018

Gold sold (gold and gold eq. oz)

142,609

121,174

Total Cash Costs (US$/oz)*

540

536

All-in Sustaining Costs (US$/oz)*

778

697

Revenue

174,676

146,897

Operating profit

57,379

50,666

Net profit

45,692

28,639

EBITDA*

86,541

71,424

EBITDA margin (%)*

50%

49%

Earnings per share (US$)

0.125

0.088

Net cash inflow from operations

72,566

65,700

Capital expenditure

31,327

26,534

Net debt position*

216,917

189,071

 

* Definitions for non-IFRS terms are provided in the footnotes to the Chief Financial Officer's Report below.

 

The interim condensed consolidated financial statements of Highland Gold for the six months ended 30 June 2019 are set out below.

 

 

H1 2019 HIGHLIGHTS

 

Financial

 

·; First half revenue rose 18.9% year-on-year to US$174.7 million, reflecting the contribution from the newly-acquired Valunisty mine and increased sales volume at MNV.

 

·; H1 2019 EBITDA was US$86.5 million, an increase of 21.2% from H1 2018, while EBITDA margin was stable at 50% versus 49% last year.

 

·; All-in sustaining costs (AISC) per ounce rose to US$778, from US$697 in the first half of last year, due to the inclusion of Valunisty and higher maintenance capital expenditure for purchases of new equipment.

 

·; The net debt to EBITDA ratio decreased to 1.29x as of 30 June 2019 versus 1.38x as of 31 December 2018, when net debt was US$211.4 million.

 

 

 

Operations

 

·; Highland Gold produced a total of 142,254 oz of gold and gold equivalent in H1 2019, an increase of 10.3% from 128,921 oz in H1 2018.

 

·; Production at Mnogovershinnoye (MNV) in H1 2019 rose by 23.3% over the same period last year, and a new JORC-compliant reserve report extended the life of mine by seven years to 2029.

 

·; Belaya Gora and Novoshirokinskoye (Novo) saw year-on-year declines in output due to operational issues and lower grades, respectively, although grades at Novo improved in the second quarter.

 

·; Construction work at Kekura and an exploration drilling programme at Klen continued throughout H1 2019, as both projects were officially granted residency in the Chukotka special economic zone.

 

·; The Company affirms its forecast for total 2019 production of 290,000-300,000 oz of gold and gold equivalent.

 

Speaking on the Company's first half performance, Highland Gold CEO Denis Alexandrov said:

 

"Highland Gold achieved solid half-year financial performance, buoyed by stable gold prices and a weaker rouble, despite higher maintenance capex for replacing older equipment due to the extension of life of mine at our key production assets, and higher costs at our newest mine, Valunisty, which we are now focusing on bringing in line with our other operating assets.

 

From an operational standpoint, the Company met its internal targets and increased production over the first half of last year with the aid of Valunisty and a particularly strong performance from MNV. Novo made progress in rectifying some of the issues with metals grades that constrained its output over the past twelve months. Belaya Gora had a difficult half-year, but still managed to minimize the impact of its operational challenges on total production.

 

We expect higher production levels and stronger operating cash flow in the second half, as well as continued progress on construction at our key development project, Kekura, and on our ongoing projects to improve operations at each of our existing mines."

 

 

POST HALF YEAR EVENTS

 

·; Interim Dividend of £0.05 per share approved by the Board of Directors

 

·; In August, to take advantage of falling interest rates, the Company restructured its existing debt portfolio with US$103 million in longer-term credit agreements with Rosbank, Sberbank and Alfa Bank, thereby increasing the average loan tenor from 18.1 to 36.6 months and lowering the average effective interest rate from 4.19% to 4.09%.

 

·; On 16 August 2019, Highland Gold's Senior Independent Director Terry Robinson passed away after a brief illness. Executive Chairman Eugene Shvidler said: "On behalf of the Board and everyone at Highland Gold, I would like to offer our deepest, sincerest condolences to Terry's wife and family. Terry was a true gentleman in every sense of the word, and his experience, judgment, incomparable attention to detail and, most of all, his friendship will be sorely missed." The Company will consider the appointment of a new independent director in due course.

 

 

CONFERENCE CALL DIAL-IN DETAILS

 

The Company will hold a simultaneous webcast and conference call to discuss the results, hosted by CEO Denis Alexandrov, on 03 September 2019 at 10:00 UK time (12:00 Moscow).

 

This event will be streamed online. To listen and view the slide presentation in real time, it is recommended to access it via computer. The link for online registration is:

https://digital.vevent.com/rt/highlandgoldmining/index.jsp?seid=287

 

To register to participate by telephone and to receive local dial-in numbers, please follow this link:

http://emea.directeventreg.com/registration/1875585

 

 

 

FOR FURTHER INFORMATION PLEASE CONTACT:

 

Highland Gold Mining Ltd.

John Mann, Head of Communications

+ 7 495 424 95 21

Duncan Baxter, Non-Executive Director

+ 44 (0) 1534 814 202

 

Numis Securities Limited

(Nominated Adviser and Joint Broker)

John Prior, James Black, Paul Gillam

+44 (0) 207 260 1000

 

BMO Capital Markets Limited

(Joint Broker)

Jeffrey Couch, Tom Rider, Pascal Lussier Duquette

+44 (0) 207 236 1010

 

Peat & Co

(Joint Broker)

Charlie Peat

+44 (0) 207 104 2334

 

 

 

***

 

 

OPERATIONAL REVIEW

 

KHABAROVSK REGION, RUSSIA

 

Mnogovershinnoye (MNV)

 

·; H1 2019 gold production rose 23.3% year-on-year on the back of particularly strong first quarter.

·; Ore mining and processing increased by 17.9% and 15.6% year-on-year, respectively, during the period.

·; Waste stripping rose by 25.6% year-on-year, in line with MNV's mining plan, which foresees an increase in average grades in the second half of this year.

 

MNV

Units

H1 2018

H2 2018

H1 2019

Waste stripping

t

2,097,446

2,157,753

2,635,346

Underground development

m

5,923

5,860

5,570

Open-pit ore mined

t

140,982

286,004

176,189

Open-pit ore grade

g/t

2.23

2.50

2.38

Underground ore mined

t

407,903

402,903

380,334

Underground ore grade

g/t

3.10

3.52

4.01

Waste dumps ore mined

t

47,296

22,173

146,249

Waste dumps ore grade

g/t

1.04

1.04

1.10

Total ore mined

t

596,181

711,080

702,772

Average grade

g/t

2.73

3.03

2.99

Ore processed

t

609,126

701,167

704,252

Average grade

g/t

2.75

3.07

2.92

Recovery rate

%

92.0

93.2

91.7

Gold produced

oz

48,090

64 518

59,317

 

Following the extension of MNV's life of mine from 2022 to 2029, as announced by the Company earlier this year, a scoping study and design documentation were commissioned regarding renovations and upgrades to the mine, its production facilities and infrastructure. Tenders for the projects have been completed, contracts were awarded, and work on the scoping study is already in progress.

 

A trade-off study on options for increasing tailings storage capacity was also initiated during H1 2019. Solutions under consideration include semi-dry and conventional stockpiling at various possible sites, and utilization of mined-out or abandoned open pits. The study is expected to be completed in the third quarter of this year.

 

Near-mine exploration at MNV in H1 2019 included drilling in and around the Intermediate, Deer, Quiet, and Upper ore bodies on the MNV licence and on the neighbouring Kulibinskaya licence, as well as trenching at the Deer and Chainoye ore bodies. Diamond drilling totalled 7,030 m, which is 39% of the total volume planned for the year, while total trenching during the period was 1.2 km.

 

PRODUCTION COSTS

 

Total cash costs amounted to US$541 per oz (H1 2018: US$707 per oz) while all-in sustaining costs were US$697 per oz (H1 2018: US$851 per oz).

 

CAPITAL COSTS

 

A total of US$8.5 million was invested at MNV in H1 2019. This included capitalised expenditures and construction (US$5.2 million), purchase of equipment (US$3.1 million) and exploration (US$0.2 million).

 

 

Belaya Gora

 

·; Operational challenges in H1 2019, including SAG mill repairs and a localised fire incident in the second quarter, resulted in a 7.5% year-on-year decline in production.

·; Stripping increased by 83.0% year-on-year, while ore mining volume fell by 3.7%, both due in part to the cutback of the pit walls on upper levels in the second quarter.

 

Belaya Gora

Units

H1 2018

H2 2018

H1 2019

Waste stripping

t

2,462,911

2,746,028

4,506 796

Ore mined

t

1,055,596

1,039,733

1,016,752

Average grade

g/t

0.81

0.86

0.88

including:

 

 

 

 

- Ore Au >0.7 g/t

t

507,260

668,414

633,064

- Average grade

g/t

1.17

1.09

1.11

- Ore Au 0.3-0.7 g/t

t

548,336

371,319

383,687

- Average grade

g/t

0.47

0.44

0.50

Ore from stockpiles

t

162,900

84,047

211,469

Average grade

g/t

1.00

1.02

0.84

Ore processed

t

718,868

860,022

778,784

Average grade

g/t

1.11

1.15

1.03

Recovery rate

%

75.4

76.4

74.9

Gold produced

oz

19,804

24,281

18,322

 

Data is being assembled for a JORC-compliant audit of reserves in the Kolchansky and Zayachy prospects on the Belaya Gora Flanks licence, based on over 8,000 metres of exploration drilling in 2017 and 2018.

 

PRODUCTION COSTS

 

Total cash costs amounted to US$775 per oz (H1 2018: US$795 per oz) while all-in sustaining costs rose to US$1,150 per oz (H1 2018: US$849 per oz) due to higher stripping costs.

 

CAPITAL COSTS

 

A total of US$2.1 million was invested at Belaya Gora in H1 2019. This included capitalised expenditures and construction (US$1.9 million), purchase of equipment (US$0.1 million) and exploration (US$0.1 million).

 

 

ZABAIKALSKY REGION, RUSSIA

 

Novoshirokinskoye (Novo)

 

·; Mined ore in H1 2019 was 6.4% lower year-on-year, but ore processing volume rose by 2.2% to 414k tonnes.

·; Mined ore grades were substantially lower year-on-year at an average of 4.53 g/t gold equivalent over the six months, but the second quarter saw a higher average of 5.16 g/t.

 

Novo

Units

H1 2018

H2 2018

H1 2019

Underground development

m

6,184

5,258

5,295

Ore mined

t

439,430

426,332

411,175

Average grade*

g/t

5.60

4.65

4.53

Ore processed

t

405,509

427,714

414,321

Average grade*

g/t

5.83

4.72

4.73

Recovery rate*

%

80.3

79.8

79.0

Gold produced (100%)*

oz

61,027

51,780

49,742

* In gold equivalent at actual prices

(Metal grade of mined ore = Au 2.76 g/t, Ag 51.96 g/t, Pb 0.99%, Zn 0.47%, Cu 0.25%).

 

Work on the Novo 1.3 Mtpa expansion project progressed throughout H1 2019. Highlights included:

- Construction work on a water pumping station at the +637m level in the underground mine, with completion expected in November 2019 after the installation and adjustment of electrical equipment;

- The selection of contractors for work on the key remaining facilities for Stage 1 of the project (mine capacity expansion), covering reconstruction of the skip hoist and main ventilation system; and

- The initiation of work on design documentation for expanding the tailings dam in preparation for Stage 2 of the project (processing plant capacity expansion).

 

Also during the period, the Company continued to undertake studies on future ore mining at Novo, with intensified production drilling over the past few months. The deliverable of this exercise will be an updated model of the mine's mineralogical and metallurgical balance.

 

PRODUCTION COSTS

 

Total cash costs amounted to US$385 per oz (H1 2018: US$299 per oz) while all-in sustaining costs were US$460 per oz (H1 2018: US$366 per oz).

 

CAPITAL COSTS

 

A total of US$4.9 million was invested at Novo in H1 2019. This included capitalised expenditures and construction (US$3.7 million) and purchase of equipment (US$1.2 million).

 

 

Baley ore cluster (Teseevskoye, Sredny Golgotay and ZIF-1)

 

Activity at the Company's Baley group of licences in H1 2019 focused on continued design work on a heap leach facility with an annual processing capacity of 840k tonnes for the Baley ZIF-1 tailings licence. Design documentation has undergone a preliminary review process at the State Expert Panel in Krasnoyarsk, and is being updated based on their feedback. The submission of project documentation for final expert review is underway, with approval expected in Q3 2019.

 

A scoping study for Sredny Golgotay, including a trade-off analysis of various options for developing the deposit, neared completion during the reporting period. The technical and financial parameters in a preliminary report received earlier this year are in the process of being reviewed, updated, and approved. The final report is expected in Q3 2019.

 

 

CHUKOTKA AUTONOMOUS DISTRICT, RUSSIA

 

As per the Company's announcement earlier this year, a key highlight of H1 2019 was the completion of an agreement with Russia's Far East Development Corporation officially confirming residency in the Chukotka Advanced Special Economic Zone (ASEZ) for the Kekura and Klen projects, which was then signed on 03 July 2019. The ASEZ programme offers certain tax breaks and other incentives over the first five to ten years of operations.

 

 

 

 

Valunisty

 

·; Waste stripping was 16.5% lower for H1 2019 due to equipment downtime and the redeployment of equipment for snow ploughing.

·; Ore mining increased by 15.5% year-on-year in H1 2019, while ore processing rose by 28.6%.

·; Grades were lower, as expected, as the mill processed ore from Valunisty's Glavnaya and Novaya zones, as opposed to the main Valunisty ore body and the satellite Gorny mine as in H1 2018.

 

Valunisty

Units

H1 2018**

H2 2018**

H1 2019

Waste stripping

t

2,955,788

3,583,448

2,467 662

Ore mined

t

116,425

187,250

134,415

Average grade*

g/t

3.66

3.35

2.76

Ore processed

t

102,322

137,310

131,593

Average grade*

g/t

5.62

4.02

3.37

Recovery rate

%

95.9

95.7

95.2

Gold produced*

oz

19,117

17,794

14,873

* gold equivalent, including silver

** figures for 2018 (prior to acquisition by Highland Gold) shown for comparison only

 

Over the course of the half year, engineering studies and project design work continued on the planned expansion of Valunisty's processing plant capacity from 250k tonnes to 350k tonnes of ore per annum, and for the beginning of underground mining at the site. Tests were conducted using XRT ore sorting technology, with the results now under review, and inspections were carried out on the existing processing plant buildings and foundations. Mining options were also reviewed along with cost estimates for mining equipment.

 

PRODUCTION COSTS

 

Total cash costs amounted to US$730 per oz while all-in sustaining costs were US$1,123 per oz.

 

CAPITAL COSTS

 

A total of US$1.6 million was invested at Valunisty in H1 2019. This included capitalised expenditures and construction (US$0.6 million), purchase of equipment (US$0.4 million) and exploration (US$0.6 million).

 

 

Kekura

 

The current phase of construction and preparations for subsequent stages were a key focus of the Company throughout the first half of the year. Preparations for the next two phases of construction at Kekura included engineering studies, technical audits, site surveys, design work, tenders for contractors, and the preparation and submission of various types of documentation for regulatory approval.

 

Progress was made in the ongoing construction of the assay laboratory, where the foundation and structural frame are now in place, and the communications tower, where the mast has been raised and equipment block installed. The Company also reinforced the steel structures of the main building of the pilot processing plant on site. Start-up and adjustment work was carried out on the power substation, which is expected to be connected to the regional power network later this year.

 

Ground regrading work got underway in preparation for construction of an expanded camp. Work also began on an internal power line network to connect buildings around the site to the power substation.

 

In June, Russian regulators approved Kekura's mine allotment for the open pit, as well as the Company's methodology for production exploration and grade control drilling. RC drilling commenced on site towards the end of the month. The Company plans to begin stripping and initial ore mining later this year.

 

On the exploration front, about 1,300 metres of drilling on the Zapadny prospect on the broader Kekura licence was completed last spring. Preliminary desktop studies of existing data show a steeply dipping vein and veinlet impregnated zone with intervals reaching 3-5 metres at 5-6 g/t, potentially providing additional resources for the Kekura project.

 

 

 

CAPITAL COSTS

 

A total of US$10.9 million was invested at Kekura in H1 2019. This included capitalised expenditures and construction (US$9.5 million), purchase of equipment (US$0.8 million) and exploration (US$0.6 million).

 

 

Klen

 

The Company made preparations for conducting XRT bulk sorting tests on Klen ore late in H1 2019 to see if this ore sorting technology could be used for the project. A more representative sample in terms of volume and extraction method is being tested during the third quarter.

 

While waiting for the tests to be conducted, a decision was made to review new alternatives for development of the deposit with a view towards reducing projected construction costs. The Company is preparing a tender for contractors for the technical design assignment.

 

Exploration drilling was carried out on the northern flank of the Klen deposit and on the surrounding Verkhne-Krichalskaya license area during the spring. A total of 5,348 metres was drilled and samples sent for further analysis.

 

 

HEALTH, SAFETY AND ENVIRONMENT

 

Highland Gold's key health and safety goals include ensuring safe labour conditions, managing operational risks, offering ongoing employee training programmes and encouraging personal accountability for safety at the workplace.

 

The Board of Directors' HSE Committee approved a new HSE Policy and a set of targets and goals for the year at its meeting in March. Since then, a new corporate standard on "Analysis of Safe Workplace Practices" was developed. The standard and a related set of tools are currently being rolled out across the Company and its subsidiaries.

 

Despite these efforts, Highland Gold witnessed three workplace fatalities and one on-site medical emergency leading to death over the course of H1 2019. As a result, in addition to stepping up implementation of its new corporate standards, the Company is reviewing options for involving outside consultants to ensure that its health and safety goals are achieved.

 

The Company's overall Lost Time Incident Frequency Rate (LTIFR, calculated as the number of incidents for every 1,000,000 man-hours) in H1 2019 decreased to 2.77 from 5.04 in the first half of last year. There was a total of 10 lost-time incidents registered during the period - six at Novo, two at Belaya Gora and one each at MNV and Valunisty - versus 14 lost-time incidents in H1 2018.

 

Training sessions conducted in H1 2019 included a "Conscious Safety Management" course for 336 employees at the Moscow office, Valunisty, Novo and MNV; an "Internal Incident Investigation" course for 15 people from Valunisty; a "Defensive Driving" course for 81 people at MNV and Belaya Gora; a "Risk Assessment" course for 67 people from MNV, Novo and Valunisty; and "Conscious Safety Attitude" instruction for 502 employees at Novo, MNV and Belaya Gora.

 

A self-assessment of labour safety management systems was undertaken at Novo, MNV, Kekura and Valunisty in May of this year. The audit findings were used to develop an action plan aimed at further introducing improved labour safety management processes. In addition, a company-wide risk assessment project is in progress with the aim of developing a risk registry in accordance with corporate standards.

 

Highland Gold continues to adhere to its stated policy of protecting the environment and operating in accordance with all relevant regulatory requirements. An environmental monitoring system is in place at each of the Company's operations, and reducing the impact of its operations on the environment remains one of the Company's key priorities.

 

Over the course of H1 2019, in-house audits of environmental management systems were performed at MNV and Belaya Gora to ensure their compliance with environmental legislation. An action plan was developed based on the audits' findings in order to minimize the causes of systematic violations.

 

Across the Company, 1,117 employees underwent refresher training on environmental safety during the quarter. Another 270 employees were trained and tested on management of class I-IV hazardous materials. Eight managers and specialists attended external environmental safety courses.

 

 

FINANCIAL REVIEW

 

CHIEF FINANCIAL OFFICER'S REPORT

 

Highland Gold's financial performance in H1 2019 was supported by stable gold prices and a weaker local currency, with the average rouble-dollar exchange rate increasing by 9.5% y-o-y.

 

Overall revenue increased to US$174.7 million, reflecting the acquisition of Valunisty mine and increased sales volumes at MNV during the period. Revenue from gold and silver sales amounted to US$124.5 million (H1 2018: US$87.9 million) during the half. Lead and zinc concentrate revenue showed a decline from US$58.8 million in H1 2018 to US$49.7 million in H1 2019. The Company continued to pursue a "no hedge" policy.

 

Over the reporting period, the Company sold 142,609 ounces of gold and gold equivalent, compared to 121,174 ounces in H1 2018. MNV increased its sales volume by 28.3% from 47,144 in H1 2018 to 60,492 ounces in H1 2019. Belaya Gora sales remained flat at 19,554 ounces (H1 2018: 19,224 oz). Valunisty sold 14,680 oz of gold equivalent in H1 2019. The average price of gold realised by MNV, Belaya Gora and Valunisty (net of commission) was US$1,308 per oz, in line with the average market price1.

 

Novo's sales decreased to 47,883 eq. oz (down 12.6% y-o-y), mainly due to lower average grades and changes in the proportions of gold and other metals. The average price of gold equivalent realised by Novo was US$1,038 per eq. oz in H1 2019 versus US$1,073 per eq. oz in H1 2018 due to lead and zinc prices trading at 21% and 18% lower, respectively. There were also penalties for exceeding limits on arsenic and stibium content in the concentrate. The average price at Novo is based on the spot prices for metals contained in the concentrates (gold, lead, zinc, silver and copper), net of fixed processing and refining costs at third-party plants. Final adjustments are made within a maximum of 4 months after the date of shipment.

 

Gold and Gold Equivalent Sold by Mine, oz

 

 

H1 2019

H1 2018

MNV

60,492 (42.4%)

47,144 (38.9%)

Novo

47,883 (33.6%)

54,806 (45.2%)

Belaya Gora

19,554 (13.7%)

19,224 (15.9%)

Valunisty

14,680 (10.3%)

-

Total

142,609

121,174

 

The Company's cost of sales net of depreciation increased by 17.8% to US$77.7 million in H1 2019 (H1 2018: US$66.0 million). The increase was primarily driven by the acquisition of Valunisty, with costs of sales net of depreciation in H1 2019 amounting to US$10.7 million. The Company registered additional costs for third-party services at Belaya Gora as a result of outsourcing of several functions, such as mill and plant maintenance, operational drilling, excavation and transportation. Ore stockpiles increased by US$7.5 million, including an increase of US$6.1 million at Belaya Gora and Valunisty.

 

Depreciation was US$23.5 million, up 13.4% y-o-y, mainly as a result of the acquisition of Valunisty.

 

Cash Operating Costs

 

H1 2019

H1 2018

y-o-y

Cash operating costs - breakdown

US$000

US$000

change

 

 

 

 

Cost of sales

101 268

86 763

16.7%

- depreciation, depletion and amortisation

(23 532)

(20 746)

13.4%

Cost of sales, net of depreciation, depletion and amortisation

77 736

66 017

17.8%

 

 

 

 

Breakdown per item:

 

 

 

Labour

29 700

24 524

21.1%

Consumables and spares

22 916

19 987

14.7%

Power

6 297

5 677

10.9%

Movement in ore stockpiles, finished goods and stripping assets

(12 435)

(4 336)

186.8%

Maintenance, repairs and third parties services

21 674

11 919

81.8%

Taxes other than income tax

9 584

8 246

16.2%

 

Total cash costs2 per ounce (TCC) remained practically unchanged at US$540 per oz, still well below the industry median. Poorer ore at Novo and the acquisition of Valunisty, which had higher costs, were partially offset by a higher average rouble-dollar exchange rate (+9.5%). Breaking TCC down by operating unit, total cash costs at Novo were US$385 per eq. oz (H1 2018: US$299 per eq. oz), reflecting the lower grade and, as a consequence, a decreased recovery rate. MNV significantly improved total cash costs to US$541 per oz (H1 2018: US$707 per oz) as a result of the rise in production volumes and improved grades. TCC at Belaya Gora decreased to US$775 per oz (H1 2018: US$795 per oz), while TCC at the newly acquired Valunisty amounted to US$730 per oz.

 

 

H1 2019

H1 2018

y-o-y

TCC and AISC calculation

US$000

US$000

change

 

 

 

 

Cost of sales, net of depreciation, depletion and amortisation

77 736

66 017

17.8%

- cost of by-products and other sales

(644)

(848)

(24.1%)

- taxes other than income tax at non-operating entities

(80)

(191)

(58.1%)

Total cash costs (TCC)

77 012

64 978

18.5%

 

 

 

 

 + administrative expenses

7 667

7 920

(3.2%)

 + accretion and amortisation on site restoration provision

776

828

(6.3%)

 + movement in ore stockpiles obsolescence provision

5 678

-

100.0%

 + sustaining capital expenditure

19 864

10 721

85.3%

Total all-in sustaining costs (AISC)

110 997

84 447

31.4%

 

 

 

 

Gold sold (gold and gold eq.oz)

142 609

121 174

17.7%

TCC (US$/oz)

540

536

0.7%

AISC (US$/oz)

778

697

11.7%

Average realised price of gold equivalent (US$/oz)

1 204

1 204

(0.0%)

Headroom (US$/oz)

426

507

(16.1%)

 

All-in sustaining costs (AISC) increased by 11.7% to US$778 per oz in H1 2019 from US$697 per oz in H1 2018, but nevertheless delivered strong headroom of US$426 per oz. During the period, US$5.7 million of low-grade ore in stockpiles were written down at Belaya Gora and Valunisty. Sustaining capital expenditure increased by 85.3% to US$19.9 million, largely reflecting the replacement of worn-out equipment as budgeted for in 2019 in light of the extension of life of mine at our key production assets.

 

With higher revenue and flat cash costs, EBITDA rose by 21.2% y-o-y to US$86.5 million, aided by a US$8.2 million contribution from Valunisty and better performance at MNV. The EBITDA margin3 increased from 48.6% to 49.5%, which remains within range of the most efficient gold miners. Broken down by business unit, EBITDA margin was 57.4% at Novo (H1 2018: 67.8%), 52.2% at MNV (H1 2018: 39.2%), 40.2% at Belaya Gora (H1 2018: 38.8%), and 41.9% at Valunisty.

 

EBITDA Reconciliation to Operating Profit

 

 

 H1 2019

US$000

 H1 2018

US$000

Operating profit

57 379

50 666

Depreciation and amortisation

23 532

20 746

Movement in ore stockpiles obsolescence provision

5 678

-

Movement in raw materials and consumables obsolescence provision

(48)

12

EBITDA

86 541

71 424

 

 

HGML EBITDA Bridge, US$ million

 

H1 2018

71.4

+ Valunisty

8.8

+ Exchange Rate

7.0

- Metal Prices

(2.2)

+ Volume of Sales

5.7

- Costs

(4.2)

H1 2019

86.5

 

 

The increase in other operating expenses from US$1.8 million in H1 2018 to US$9.1 million in H1 2019 was mainly related to a US$5.7 million movement in ore stockpiles obsolescence provision at Belaya Gora and Valunisty during the reporting period.

 

In H1 2019, the Company recognised a net finance cost of US$0.8 million (H1 2018: US$0.8 million). The principal components were accretion expense on site restoration liability amounting to US$0.9 million (H1 2018: US$0.8 million) and interest expense on leasing of US$0.2 million in H1 2019 (H1 2018: US$0.1 million). The majority of interest expense was capitalised into the cost of qualifying assets at Kekura.

 

A foreign exchange loss of US$0.5 million (H1 2018: gain of US$0.3 million) resulted from the settlement of foreign currency transactions and the retranslation of monetary assets and liabilities denominated in Russian roubles into US dollars.

 

Income tax charges equalled US$10.4 million in H1 2019 compared with US$21.5 million in H1 2018. Current tax expense rose to US$16.9 million (MNV: US$9.6 million, Novo: US$6.1 million, Belaya Gora: US$0.5 million and Valunisty: US$0.7 million), US$6.8 million higher than in H1 2018 as a result of increased sales at MNV. The higher current tax was offset by a substantial US$9.1 million deferred tax release in H1 2019 (H1 2018: deferred tax expense of US$7.0 million), largely because of future tax revaluation following the rouble's appreciation at the end of the period. Withholding tax expense was recorded at US$2.6 million (H1 2018: US$4.6 million).

 

Net profit for the first half of 2019 totalled US$45.7 million compared to a profit of US$28.6 million in H1 2018. Earnings per share rose to US$0.125 (H1 2018: US$0.088).

 

The Company's cash inflow from operating activities was US$72.6 million (H1 2018: US$65.7 million).

 

Cash capital expenditures for the reporting period totalled US$31.3 million versus US$26.5 million in H1 2018. This largely reflected sustaining capex at MNV for replacing ageing equipment and development capex at Kekura. Capital expenditures included US$8.5 million at MNV, US$4.9 million at Novo, US$2.1 million at Belaya Gora, US$10.9 million at Kekura, US$1.6 million at Valunisty, US$1.2 million at Taseevskoye, US$1.1 million at Klen and US$1.0 million related to other exploration and development assets. Capital expenditures were entirely funded by operating cash flow.

 

The Company's debt is denominated in US dollars. Gross debt was reduced by 10.8% to US$221.0 million as of 30 June 2019 (31 December 2018: US$247.9 million) over the reporting period. The average effective interest rate (free of modification) was 4.2%, unchanged compared to the end of 2018.

 

At the end of the reporting period, cash and cash equivalents amounted to US$8.3 million, compared to US$38.7 million as of 31 December 2018. The Company's net debt position4 including lease liabilities was US$216.9 million.

 

Gross and Net Debt Comparison

 

 

31 Dec 2018

US$000

30 June 2019

US$000

Gross debt

247,851

221,025

Net debt

211,433

216,917

Interest rate

4.24%

4.19%

LIBOR

2.51%

2.39%

Net debt/EBITDA

1.38x

1.29x

 

The ratio of net debt to EBITDA decreased from 1.38 as of 31 December 2018 to 1.29 as of 30 June 2019, which is well within the Board of Directors' debt policy.

 

Cash Position Bridge, US$ million

 

Cash & Cash equivalents (1 Jan 2019)

39

+ Net cash flow from operating activities

73

- Cash capital expenditure

(31)

- Increase in stripping activity assets

(5)

- Interest paid, including capitalised

(5)

- Repayment of borrowings

(28)

- Dividends paid to equity holders of the parent

(32)

- Withholding tax expense

(3)

Cash & Cash equivalents (30 June 2019)

8

 

 

EVENTS AFTER THE REPORTING PERIOD

 

In August, to take advantage of falling interest rates, the Company restructured its existing debt portfolio with US$103 million in longer-term credit agreements with Rosbank, Sberbank and Alfa Bank, thereby increasing the average loan tenor from 18.1 to 36.6 months and lowering the average effective interest rate from 4.19% to 4.09%.

 

 

PAYMENT OF DIVIDENDS

 

The Board has approved an interim dividend of GBP 0.05 per share to be paid to shareholders on 04 October 2019. The ex-dividend date is 12 September 2019 and the record date is 13 September 2019.

 

The Company offers an option for shareholders to elect to receive their dividends in pounds sterling or in US dollars. Payments in US dollars will be fixed at an exchange rate of 1.2066 GBP/US$, or US$0.06 per share. To receive payment in US dollars, shareholders should complete and file the Currency Election Form no later than the election deadline of 13 September 2019. The Currency Election Form and instructions for filing them are available on the Company's website at address: https://www.highlandgold.com/home/investors/dividends 

 

At the Company's AGM in May 2018, shareholders approved a scrip dividend scheme, which would offer an additional option to receive dividends as new shares. However, the Board of Directors has decided not to offer a scrip dividend for the interim dividend.

 

 

Alla Baranovskaya

Chief Financial Officer

Rounding of figures may result in computational discrepancies

 

 

Glossary

 

1 Average H1 2019 LBMA price was US$1,307 per oz

 

2 Total cash costs include mine site operating costs such as mining, processing, administration, royalties and production taxes, but are exclusive of depreciation, depletion and amortisation, capital and exploration costs. Total cash costs are then divided by ounces sold to arrive at the total cash costs per ounce. This data provides additional information and is a non-GAAP measure.

 

3 EBITDA margin is defined as EBITDA divided by total revenue

 

4 Net debt is defined as cash at bank, deposits and bonds, decreased by any bank borrowing and lease obligations

 

 

Interim consolidated statement of comprehensive income

for the six months ended 30 June

 

 

2019

 

2018

 

 

unaudited

unaudited

 

Notes

US$000

US$000

 

 

 

 

 

Revenue

3

174,676

 

146,897

Cost of sales

3

(101,268)

 

(86,763)

Gross profit

 

73,408

 

60,134

 

 

 

 

 

Administrative expenses

 

(7,667)

 

(7,920)

Other operating income

 

735

 

293

Other operating expenses

 

(9,097)

 

(1,841)

Operating profit

 

57,379

 

50,666

 

 

 

 

 

Foreign exchange (loss)/ gain

 

(469)

 

255

Finance income

4.1

306

 

144

Finance costs

4.2

(1,112)

 

(901)

Profit before income tax

 

56,104

 

50,164

 

 

 

 

 

Current income tax expense

5

(16,935)

 

(10,092)

Withholding tax

5

(2,626)

 

(4,401)

Deferred income tax credit/ (expense)

5

9,149

 

(7,032)

Total income tax expense

5

(10,412)

 

(21,525)

 

 

 

 

 

Profit for the period

 

45,692

 

28,639

 

 

 

 

 

Total comprehensive income for the period

 

45,692

 

28,639

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attributable to:

 

 

 

 

Equity holders of the parent

 

45,403

 

28,557

Non-controlling interests

 

289

 

82

 

 

 

 

 

Earnings per share (US$ per share)

 

 

 

·; Basic, for the profit for the period attributable to ordinary equity holders of the parent

14

0.125

0.088

·; Diluted, for the profit for the period attributable to ordinary equity holders of the parent

14

0.125

0.088

 

 

 

 

 

 

 

 

The Group does not have any items of other comprehensive income or any discontinued operations.

 

Interim consolidated statement of financial position

as at 30 June 2019

 

 

30 June

 

31 December

 

30 June

 

2019

2018

2018

 

unaudited

audited

unaudited

Notes

US$000

US$000

US$000

Assets

 

 

 

 

 

 

Non-current assets

 

 

 

 

 

 

Exploration and evaluation assets

6

96,270

 

92,972

 

90,407

Mine properties

6

666,678

 

649,716

 

593,014

Property, plant and equipment

6

320,470

 

316,928

 

291,812

Intangible assets

3

63,651

 

63,651

 

57,802

Inventories

9

2,963

 

2,566

 

2,015

Other non-current assets

 

14,742

 

12,338

 

9,529

Deferred income tax asset

 

3,243

 

2,163

 

-

Total non-current assets

 

1,168,017

 

1,140,334

 

1,044,579

 

 

 

 

 

 

 

Current assets

 

 

 

 

 

 

Inventories

9

59,681

 

70,459

 

56,563

Trade and other receivables

 

30,239

 

29,969

 

24,414

Income tax prepaid

 

5,652

 

3,074

 

1,718

Prepayments

 

6,789

 

2,429

 

2,364

Cash and cash equivalents

10

8,284

 

38,736

 

10,906

Other current assets

 

2,083

 

2,107

 

1,879

Total current assets

 

112,728

 

146,774

 

97,844

Total assets

 

1,280,745

 

1,287,108

 

1,142,423

 

 

 

 

 

 

 

Equity and liabilities

 

 

 

 

 

 

Equity attributable to equity holders of the parent

 

 

 

 

 

 

Issued capital

12

634

 

634

 

585

Share premium

 

786,496

 

786,496

 

718,419

Assets revaluation reserve

 

832

 

832

 

832

Retained earnings

 

75,316

 

40,905

 

59,765

Total equity attributable to equity holders of the parent

 

863,278

 

828,867

 

779,601

Non-controlling interests

 

2,620

 

2,331

 

2,395

Total equity

 

865,898

 

831,198

 

781,996

 

 

 

 

 

 

 

Non-current liabilities

 

 

 

 

 

 

Interest-bearing loans and borrowings

7, 11

114,167

 

153,674

 

169,550

Liability under leases

7

2,821

 

1,558

 

1,827

Long-term accounts payable

 

417

 

355

 

347

Income tax payable

 

1,916

 

1,600

 

- 

Provisions

 

31,754

 

24,777

 

20,175

Deferred income tax liability

 

125,155

 

133,226

 

114,517

Total non-current liabilities

 

276,230

 

315,190

 

306,416

 

 

 

 

 

 

 

Current liabilities

 

 

 

 

 

 

Trade and other payables

 

30,404

 

45,412

 

25,404

Interest-bearing loans and borrowings

7, 11

106,858

 

94,177

 

27,752

Income tax payable

 

-

 

371

 

7

Liability under leases

7

1,355

 

760

 

848

Total current liabilities

 

138,617

 

140,720

 

54,011

Total liabilities

 

414,847

 

455,910

 

360,427

Total equity and liabilities

 

1,280,745

 

1,287,108

 

1,142,423

The financial statements were approved by the Board of Directors on 02 September 2019 and signed on its behalf by: John Mann and Olga Pokrovskaya.

 

Interim consolidated statement of changes in equity

for the six months ended 30 June 2019

 

 

 

Attributable to equity holders of the parent

 

 

 

 

Issued capital

Share premium

Asset revaluation reserve

Retained earnings

Total

Non-controlling interest

Total equity

 

 

US$000

US$000

US$000

US$000

US$000

US$000

US$000

At 31 December 2018

 

634

786,496

832

40,905

828,867

2,331

831,198

Total comprehensive income for the period

 

-

-

-

45,403

45,403

289

45,692

Dividends paid to equity holders of the parent

 

-

-

-

(10,992)

(10,992)

-

(10,992)

At 30 June 2019 (unaudited)

 

634

786,496

832

75,316

863,278

2,620

865,898

 

 

for the six months ended 30 June 2018

 

 

Attributable to equity holders of the parent

 

 

 

 

Issued capital

Share premium

Asset revaluation reserve

Retained earnings

Total

Non-controlling interest

Total equity

 

 

US$000

US$000

US$000

US$000

US$000

US$000

US$000

At 31 December 2017

 

585

718,419

832

55,371

775,207

2,309

777,516

Total comprehensive income for the period

 

-

-

-

28,557

28,557

82

28,639

Novo share redemption

13

-

-

-

(4)

(4)

4

-

Dividends paid to equity holders of the parent

 

-

-

-

(24,159)

(24,159)

-

(24,159)

At 30 June 2018 (unaudited)

 

585

718,419

832

59,765

779,601

2,395

781,996

 

 

 

 

 

 

 

 

 

Interim consolidated cash flow statement

for the six months ended 30 June

 

 

2019

 

2018

 

 

unaudited

 

unaudited

 

Notes

US$000

 

US$000

Operating activities

 

 

 

 

Profit before income tax

 

56,104

 

50,164

 

 

 

 

 

Adjustments to reconcile profit before income tax to net cash flows from operating activities:

 

 

 

 

Depreciation of mine properties and property, plant and equipment

6

23,532

 

20,746

Movement in ore stockpiles obsolescence provision

9

5,678

 

-

Movement in raw materials and consumables obsolescence provision

9

(48)

 

12

Write-off of mine properties and property, plant and equipment

6

595

 

254

Loss/ (gain) on disposal of property, plant and equipment

 

168

 

(85)

Bank interest receivable

4.1

(306)

 

(143)

Interest expense on bank loans

4.2

-

 

11

Accretion expense on site restoration provision

4.2

936

 

758

Net foreign exchange loss/ (gain)

 

469

 

(255)

Movement in provisions

 

6

 

-

Other non-cash expenses

 

1

 

387

Working capital adjustments:

 

 

 

 

(Increase)/ decrease in trade and other receivables and prepayments

 

(5,588)

 

6,691

Decrease in inventories

 

4,626

 

1,015

Increase/ (decrease) in trade and other payables

 

5,924

 

(1,667)

Income tax paid

 

(19,531)

 

(12,188)

Net cash flows from operating activities

 

72,566

 

65,700

 

 

 

 

 

Investing activities

 

 

 

 

Proceeds from sale of property, plant and equipment

 

155

 

380

Purchase of property, plant and equipment

3

(31,327)

 

(26,534)

Capitalised interest paid

3, 6, 7

(4,894)

 

(3,522)

Increase in stripping activity assets

6

(5,090)

 

(738)

Interest received from deposits

 

306

 

143

Net cash flows used in investing activities

 

(40,850)

 

(30,271)

 

 

 

 

 

Financing activities

 

 

 

 

Proceeds from borrowings

7

13,751

 

31,344

Repayment of borrowings

7

(41,658)

 

(38,900)

Dividends paid to equity holders of the parent

 

(31,873)

 

(24,159)

Withholding tax paid

 

(2,626)

 

(4,648)

Payment under lease

7

(809)

 

(746)

Net cash flows used in financing activities

 

(63,215)

 

(37,109)

 

 

 

 

 

Net decrease in cash and cash equivalents

 

(31,499)

 

(1,680)

Effects of exchange rate changes

 

1,047

 

198

Cash and cash equivalents at 1 January

 

38,736

 

12,388

Cash and cash equivalents at 30 June

 

8,284

 

10,906

 

1. Corporate information

These interim condensed consolidated financial statements of Highland Gold Mining Limited for the six months ended 30 June 2019 were authorised for issue in accordance with a resolution of the Directors on 02 September 2019.

Highland Gold Mining Limited is a public company incorporated and domiciled in Jersey. The registered office is located at 26 New Street, St Helier, Jersey JE2 3RA. Its ordinary shares are traded on the Alternative Investment Market (AIM).

The principal activity is building a portfolio of gold mining operations within the Russian Federation and Kyrgyzstan.

 

2. Basis of preparation and accounting policies

Basis of preparation

The interim condensed consolidated financial statements for the six months ended 30 June 2019 have been prepared in accordance with IAS 34 'Interim Financial Reporting' as adopted by the European Union. The annual financial statements of the Group for the year ended 31 December 2018 were prepared in accordance with International Financial Reporting Standards as adopted by the European Union and Companies (Jersey) Law 1991.

The interim condensed consolidated financial statements do not include all the information and disclosures required in the annual financial statements and should be read in conjunction with the Group's annual financial statements as at 31 December 2018.

Having made relevant enquiries, the Directors believe that it is appropriate to adopt the going concern basis in the preparation of the interim condensed consolidated financial statements in view of the fact that the Company and the Group have adequate resources to continue in operational existence for the foreseeable future.

The impact of seasonality or cyclicality on operations is not considered significant to the interim condensed consolidated financial statements.

 

Changes in accounting policies

The accounting policies adopted in the preparation of the interim condensed consolidated financial statements are consistent with those applied in the preparation of the consolidated financial statements for the year ended 31 December 2018, except for the adoption of new standards and interpretations effective as of 1 January 2019. The Group has not early adopted any standard, interpretation or amendment that has been issued but is not yet effective.

Effective 1 January 2019, the Group applies, for the first time, IFRS 16 Leases.

The nature and the impact of each amendment is described below:

 

New Standards and Interpretations adopted by the Group

The following is a list of new or amended IFRS standards and interpretations that have been applied by the Group for the first time in these interim condensed consolidated financial statements.

 

Title

Subject

Effective for annual periods beginning on or after

Effect on the condensed consolidated interim financial statements

IFRS 16

Leases

1 January 2019

Please see below

Amendments to IFRS 9

Prepayment features with negative compensation and modifications of financial liabilities

1 January 2019

No effect

IFRIC 23

Uncertainty over income tax treatment

1 January 2019

No effect

Amendments to IAS 12

Income tax consequences of dividends

1 January 2019

No effect

Amendments to IAS 19

Plan amendments, curtailment and settlement

1 January 2019

No effect

Amendments to IAS 23

Treatment of borrowings after the related asset is ready for its intended use or sale

1 January 2019

No effect

 

 

 

 

 

IFRS 16 Leases

 

Starting from 1 January 2019, the Group applied, for the first time, IFRS 16 "Leases" (hereinafter "IFRS 16") issued by the International Accounting Standard Board. IFRS 16 does not apply to leases to explore for or use minerals, oil, natural gas and similar non-regenerative resources.

 

 

IFRS 16 introduces significant changes to the lessee accounting by removing the distinction between operating and finance lease and requires the recognition of a right-of-use asset and a lease liability at commencement for all leases, except for short-term leases and leases of low value assets.

 

The Group assesses whether a contract is or contains a lease, at inception of the contract. Starting from 1 January 2019, the Group recognised a right-of-use asset and a corresponding lease liability with respect to in-scope lease arrangements in which it is the lessee. Previously, such a liability except for finance leases was not recognised in the financial statements due to the fact that it was treated as an operating lease in accordance with IAS 17 "Leases".

 

The lease liability is initially measured at the present value of the lease payments that are not paid at the commencement date, discounted by using the rate implicit in the lease. If this rate cannot be readily determined, the Group uses its incremental borrowing rate.

 

Lease payments included in the measurement of the lease liability comprise:

 

·; Fixed lease payments (including in-substance fixed payments), less any lease incentives;

·; Variable lease payments that depend on an index or rate, initially measured using the index or rate at the commencement date;

·; The amount expected to be payable by the lessee under residual value guarantees;

·; The exercise price of purchase options, if the lessee is reasonably certain to exercise the options; and

·; Payments of penalties for terminating the lease, if the lease term reflects the exercise of an option to terminate the lease.

 

The lease liability is presented within lease liability in the condensed consolidated interim statement of financial position. The lease liability is subsequently measured by increasing the carrying amount to reflect interest on the lease liability (using the effective interest method) and by reducing the carrying amount to reflect the lease payments made.

 

The Group remeasures the lease liability (and makes a corresponding adjustment to the related right-of-use asset) whenever:

·; The lease term has changed or there is a change in the assessment of exercise of a purchase option, in which case the lease liability is remeasured by discounting the revised lease payments using a revised discount rate;

·; The lease payments change due to changes in an index or rate or a change in expected payment under a guaranteed residual value, in which cases the lease liability is remeasured by discounting the revised lease payments using the initial discount rate (unless the lease payments change is due to a change in a floating interest rate, in which case a revised discount rate is used);

·; A lease contract is modified and the lease modification is not accounted for as a separate lease, in which case the lease liability is remeasured by discounting the revised lease payments using a revised discount rate.

 

The right-of-use assets comprise the initial measurement of the corresponding lease liability, lease payments made at or before the commencement day. They are subsequently measured at cost less accumulated depreciation and impairment losses.

 

Right-of-use assets are depreciated on a straight-line basis over the shorter period of the lease term and the useful life of the underlying asset. If a lease transfers ownership of the underlying asset or the cost of the right-of-use asset reflects that the Group expects to exercise a purchase option, the related right-of-use asset is depreciated over the useful life of the underlying asset. The depreciation starts at the commencement date of the lease.

 

The right-of-use assets are presented within Property, Plant and Equipment in the condensed consolidated interim statement of financial position.

 

The Group applies IAS 36 to determine whether a right-of-use asset is impaired and accounts for any identified impairment loss when incurred.

 

 

Transition to IFRS 16

 

The Group has elected to apply the modified retrospective approach on transition to IFRS 16 with the overall effect of the initial application of the standard, recognised in accordance with the approach described in paragraph C7-C8 IFRS 16 Leases and presented below:

 

·; In the condensed consolidated interim financial statements for six months ended 30 June 2019, the Group has not restated comparative information for six months ended 30 June 2018 and as of 31 December 2018;

·; As at 1 January 2019, the Group recognised an additional lease liability in the amount of US$2.3 million, calculated as the net present value of the remaining lease payments (as of the application date), discounted using the discount rate of 7.66% as of 1 January 2019;

·; As of 1 January 2019, The Group elected to record the right-of-use asset at an amount equal to the lease liability at the date of transition and recognised an asset in the form of a right-of-use in the amount of US$2.3 million;

·; The Group did not change the initial carrying amounts of recognised assets and liabilities at the date of initial application for leases previously classified as finance leases (i.e., the right-of-use assets and lease liabilities equal the lease assets and liabilities recognised under IAS 17). The requirements of IFRS 16 was applied to these leases from 1 January 2019.

 

The Group has applied the following exemptions available on the date of transition to IFRS 16 and for subsequent accounting:

·; Short-term lease agreements that expire within 12 months from the date of initial application;

·; Leases for which the underlying assets is of low value when it is new (regardless of whether those leases are material to the lessee in aggregate).

Lease payments associated with such leases are recognised as an expense on a straight line basis.

The following table reconciles the Group's lease obligations at 31 December 2018, as previously disclosed in the Group's consolidated financial statements, to the lease obligations recognised on initial application of IFRS 16 at 1 January 2019.

 

 

US$000

Finance lease commitments at 31 December 2018

2,318

 

 

Operating lease commitments at 31 December 2018

2,737

Effect of discounting

(418)

Lease liabilities recognised as of 1 January 2019

2,319

 

 

Total lease liabilities as of 1 January 2019

4,637

 

 

Additional IFRS 16 leases are mostly represented by offices lease.

 

 

 

IFRS standards to be applied after 2019

The following standards and interpretations, which have not been applied in these condensed consolidated interim financial statements, were in issue but not yet effective:

 

Title

Subject

Effective for annual periods beginning on or after

Expected effect on the condensed consolidated financial statements

Amendment to IFRS 3

Business combinations

1 January 2020

No effect anticipated

Amendment to IAS 1 and IAS 8

Definition of material

1 January 2020

No effect anticipated

Amendments to references to the Conceptual Framework in IFRS Standards

Updates of references to or from the Conceptual Frameworks to the IFRS standards

1 January 2020

No effect anticipated

IFRS 17

Insurance contracts

1 January 2021

No effect anticipated

 

 

 

3. Segment information

For management purposes, the Group is organised into business units based on the nature and geography of their activities, and has five reportable segments as follows:

·; Gold production of Khabarovsk region;

·; Gold production of Chukotka region;

·; Polymetallic concentrate production;

·; Development and exploration; and

·; Other.

The gold production of Khabarovsk region reportable segment comprises two operating segments, namely Mnogovershinnoye (MNV) and Belaya Gora (BG) at which level management monitors its results for the purpose of making decisions about resource allocation and evaluating the effectiveness of its activity. MNV and BG have been aggregated into one reportable segment as they exhibit similar long-term financial performance and have similar economic characteristics: nature of products (gold and silver), nature of the production processes, type of customer for their products (banks), methods used to distribute their products and nature of the environment (both are located in the Khabarovsk region).

 

Following the acquisition of subsidiaries in late December 2018, the Group identified a new reportable segment - the gold production of Chukotka region. This new segment consists of three companies, namely Rudnik Valunisty (RV), Kanchalano-Amguemskaya Square (KAS) and Severo-Vostochnaya Gorno-Geologicheskaya Company (Kayen). All three companies operate in the same region and have similar economic characteristics. They produce gold and silver and perform exploration work with the aim of extending their reserves base.

 

The polymetallic concentrate production segment, namely Novoshirokinskoye (Novo), is analysed by management separately due to the fact that the nature of its activities differs from the gold production process.

 

The development and exploration segment contains entities which hold licenses in the development and exploration stages: Kekura, Klen, Taseevskoye, Unkurtash, Lubov, and related service entities: Zabaykalzolotoproyekt (ZZP) and BSC.

The 'other' segment includes head office, management company and other non-operating companies which have been aggregated to form the reportable segment. 

Segment performance is evaluated based on EBITDA (defined as operating profit excluding depreciation and amortisation, impairment losses, movement in ore stockpiles obsolescence provision, movement in raw materials and consumables obsolescence provision and gain on settlement of contingent consideration). The development and exploration segment is evaluated based on the life of mine models in connection with the capital expenditure spent during the reporting period.

The following tables present revenue, EBITDA and assets information for the Group's reportable segments. The segment information is reconciled to the Group's profit after tax for the period.

The finance costs, finance income, income taxes, foreign exchange gains are managed on a group basis and are not allocated to operating segments.

Transfer prices between operating segments are on an arm's length basis in a manner similar to transactions with third parties.

The accounting policies used by the Group in reporting segments internally are the same as those contained in Note 2 of the interim condensed consolidated financial statements.

Revenue from several customers was greater than 10% of total revenues.

In the first half of 2019 the gold and silver revenue reported in the gold production segment of Khabarovsk region was received from sales to Gazprombank in the amount of US$78.6 million (H1 2018: US$87.9 million) and to Sberbank in the in the amount of US$26.7 million (H1 2018: US$0.0 million) in the territory of the Russian Federation.

In the first half of 2019 the gold and silver revenue reported in the gold production segment of Chukotka region was received from sales to Gazprombank in the amount US$19.2 million in the territory of the Russian Federation.

In the first half of 2019 the concentrate revenue reported in the polymetallic concentrate production segment in the total amount of US$49.7 million was received from sales: to Kazzinc in the territory of the Republic of Kazakhstan (H1 2019: US$32.5 million; H1 2018: US$27.8 million) and to Hyosung TNC in the territory of the People's Republic of China (H1 2019: US$17.2 million; and H1 2018: US$29.1 million).

Other third-party revenues in both H1 2019 and H1 2018 were received in the territory of the Russian Federation.

Inter-segment revenues mostly represent management services.

 

 

 

 

 

 

 

 

 

 

 

Period ended 30 June 2019

 

 Gold production of Khabarovsk region

 

 Gold production of Chukotka region

 

Polymetallic concentrate production segment

 

Development & Exploration

 

Other

 

Eliminations

 

Total

 

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenue

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gold revenue

 

104,706

 

17,314

 

-

 

-

 

-

 

-

 

122,020

Silver revenue

 

574

 

1,879

 

-

 

-

 

-

 

-

 

2,453

Concentrate revenue*

 

-

 

 

 

49,701

 

-

 

-

 

-

 

49,701

Other third-party

 

41

 

299

 

129

 

33

 

-

 

-

 

502

Inter-segment

 

19

 

 

 

-

 

40

 

7,925

 

(7,984)

 

-

Total revenue

 

105,340

 

19,492

 

49,830

 

73

 

7,925

 

(7,984)

 

174,676

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cost of sales

 

61,690

 

13,350

 

25,706

 

106

 

416

 

-

 

101,268

EBITDA

 

51,865

 

8,104

 

28,601

 

(1,477)

 

(552)

 

-

 

86,541

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other segment information

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Depreciation

 

(13,206)

 

(2,621)

 

(7,286)

 

(3)

 

(416)

 

-

 

(23,532)

Movement in ore stockpiles obsolescence provision

 

(1,799)

 

(3,879)

 

-

 

-

 

-

 

-

 

(5,678)

Movement in raw materials and consumables obsolescence provision

 

(1)

 

-

 

49

 

-

 

-

 

-

 

48

Finance income

 

 

 

 

 

 

 

 

 

 

 

 

 

306

Finance costs

 

 

 

 

 

 

 

 

 

 

 

 

 

(1,112)

Foreign exchange loss

 

 

 

 

 

 

 

 

 

 

 

 

 

(469)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Profit before income tax

 

 

 

 

 

 

 

 

 

 

 

 

 

56,104

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Income tax

 

 

 

 

 

 

 

 

 

 

 

 

 

(10,412)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Profit for the period

 

 

 

 

 

 

 

 

 

 

 

 

 

45,692

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Segment assets at 30 June 2019

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Non-current assets

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital expenditure**

 

173,326

 

74,105

 

156,536

 

676,338

 

3,113

 

-

 

1,083,418

Intangible assets

 

9,690

 

5,848

 

5,134

 

42,978

 

-

 

-

 

63,651

Other non-current assets***

 

8,568

 

6,877

 

1,369

 

3,651

 

483

 

-

 

20,948

Current assets****

 

59,880

 

25,898

 

36,246

 

3,908

 

4,195

 

(17,399)

 

112,728

Total assets

 

 

 

 

 

 

 

 

 

 

 

 

 

1,280,745

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital expenditure - addition during the first half of 2019*****, including:

 

15,425

 

2,580

 

4,396

 

18,951

 

167

 

-

 

41,519

Stripping activity assets

 

4,527

 

563

 

-

 

-

 

-

 

-

 

5,090

Capitalised interest

 

-

 

 

 

-

 

5,832

 

-

 

-

 

5,832

Unpaid/ (settled) accounts payable

 

279

 

 

 

(541)

 

(468)

 

-

 

-

 

(730)

Cash capital expenditure

 

10,619

 

2,017

 

4,937

 

13,587

 

167

 

-

 

31,327

 

*Concentrate revenue contains US$47.7 million of IFRS 15 revenue, a positive provisional price adjustment of US$1.5 million which represents changes in the fair value of the provisional pricing feature in the trade receivables of 2019 and a positive price adjustment of US$0.5 million related to 2018.

**Capital expenditure is the sum of exploration and evaluation assets, mine properties and property, plant and equipment.

***Other non-current assets include long term prepayments of US$11.3 million (31 December 2018: US$9.3 million)

****Current assets at 30 June 2019 include corporate cash and cash equivalents of US$8.3 million, inventories of US$59.7 million, trade and other receivables of US$35.9 million and other assets of US$8.9 million. Eliminations relate to intercompany accounts receivable.

***** Capital expenditure for the first half of 2019 includes additions to property, plant and equipment of US$34.0 million (Note 6), capitalised interest of US$5.8 million (Note 6) (incl. cash interest expense of US$4.8 million, US$0.9 million of modification effect and US$0.1 million of capitalised upfront commission) and prepayments previously made for property, plant and equipment of US$1.7 million.

Non-current assets at 30 June 2019 are located in the Russian Federation (US$1,121.6 million) and in the Kyrgyz Republic (US$46.5 million). Current assets at 30 June 2018 are located in the Russian Federation.

 

 

 

Period ended 30 June 2018

 

Gold production segment

 

Polymetallic concentrate production segment

 

 

Development & exploration

 

Other

 

Eliminations

 

Total

 

 

US$000

 

US$000

 

 

US$000

 

US$000

 

US$000

 

US$000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenue

 

 

 

 

 

 

 

 

 

 

 

 

 

Gold revenue

 

87,122

 

-

 

 

-

 

-

 

-

 

87,122

Silver revenue

 

759

 

-

 

 

-

 

-

 

-

 

759

Concentrate revenue*

 

-

 

58,815

 

 

-

 

-

 

-

 

58,815

Other third-party

 

32

 

118

 

 

51

 

-

 

-

 

201

Inter-segment

 

36

 

-

 

 

-

 

6,739

 

(6,775)

 

-

Total revenue

 

87,949

 

58,933

 

 

51

 

6,739

 

(6,775)

 

146,897

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cost of sales

 

62,241

 

24,236

 

 

254

 

32

 

-

 

86,763

EBITDA

 

34,373

 

39,949

 

 

(585)

 

(2,313)

 

-

 

71,424

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other segment information

 

 

 

 

 

 

 

 

 

 

 

 

 

Depreciation

 

(12,843)

 

(7,868)

 

 

(3)

 

(32)

 

-

 

(20,746)

Movement in ore stockpiles obsolescence provision

 

-

 

-

 

 

-

 

-

 

-

 

-

Movement in raw materials and consumables obsolescence provision

 

6

 

(18)

 

 

-

 

-

 

-

 

(12)

Individual impairment

 

 

 

 

 

 

 

 

 

 

 

 

-

Finance income

 

 

 

 

 

 

 

 

 

 

 

 

144

Finance costs

 

 

 

 

 

 

 

 

 

 

 

 

(901)

Foreign exchange gain

 

 

 

 

 

 

 

 

 

 

 

 

255

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Profit before income tax

 

 

 

 

 

 

 

 

 

 

 

 

50,164

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Income tax

 

 

 

 

 

 

 

 

 

 

 

 

(21,525)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Profit for the period

 

 

 

 

 

 

 

 

 

 

 

 

28,639

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Segment assets at 30 June 2018

 

 

 

 

 

 

 

 

 

 

 

 

 

Non-current assets

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital expenditure**

 

174,418

 

158,443

 

 

641,439

 

933

 

-

 

975,233

Intangible assets  

 

9,690

 

5,134

 

 

42,978

 

-

 

-

 

57,802

Other non-current assets

 

4,714

 

2,791

 

 

3,660

 

379

 

-

 

11,544

Current assets***

 

70,972

 

33,796

 

 

4,551

 

4,368

 

(15,843)

 

97,844

Total assets

 

 

 

 

 

 

 

 

 

 

 

 

1,142,423

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital expenditure - addition during the first half of 2018****, including:

 

12,304

 

6,741

 

 

11,970

 

733

 

-

 

31,748

Stripping activity assets

 

738

 

-

 

 

-

 

-

 

-

 

738

Capitalised interest

 

-

 

-

 

 

1,017

 

-

 

-

 

1,017

Unpaid/ (settled) accounts payable

 

2,658

 

37

 

 

574

 

190

 

-

 

3,459

Cash capital expenditure

 

8,908

 

6,704

 

 

10,379

 

543

 

-

 

26,534

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Concentrate revenue contains US$61.8 million of IFRS 15 revenue, based on initial invoices, and a negative provisional price adjustment of US$3.0 million which represents changes in the fair value of provisionaly priced trade receivables.

**Capital expenditure is the sum of exploration and evaluation assets, mine properties and property, plant and equipment.

***Current assets at 30 June 2018 include corporate cash and cash equivalents of US$10.9 million, inventories of US$56.6 million, trade and other receivables of US$26.1 million and other assets of US$4.2 million. Eliminations relate to intercompany accounts receivable.

**** Capital expenditure for the first half of 2018 includes additions to property, plant and equipment of US$31.7 million (Note 6), capitalised interest of US$0.9 million (Note 6) and capitalised upfront commission US$0.1 million (Note 6) and prepayments previously made for property, plant and equipment of US$(1.0) million.

Non-current assets at 30 June 2018 are located in the Russian Federation (US$999.2 million) and in the Kyrgyz Republic (US$45.4 million). Current assets at 30 June 2018 are located in the Russian Federation.

 

 

4. Finance income and costs

4.1 Finance income

 

For the six months ended 30 June

 

2019

 

2018

 

unaudited

 

unaudited

 

US$000

 

US$000

 

 

 

 

Bank interest

306

 

143

Other

-

 

1

Total finance income

306

 

144

4.2 Finance costs

 

For the six months ended 30 June

 

2019

 

2018

 

unaudited

 

unaudited

 

US$000

 

US$000

 

 

 

 

Accretion expense on site restoration provision

936

 

758

Interest expense on bank loans

-

 

11

Interest expense on lease

176

 

132

Total finance costs

1,112

 

901

 

5. Income tax

The major components of income tax expense in the interim consolidated statement of comprehensive income are:

 

For the six months ended 30 June

 

2019

 

2018

 

unaudited

 

unaudited

 

US$000

 

US$000

Current income tax

 

 

 

Current income tax charge

16,935

 

10,092

Withholding tax on dividends*

2,626

 

4,648

Adjustments in respect of prior year current tax

-

 

(247)

Deferred income tax

 

 

 

Relating to origination and (reversal) of temporary differences**

(9,149)

 

 

7,032

Income tax expense

10,412

 

 

21,525

 

 

There are no tax amounts recognised directly in equity during the first half of 2019 (H1 2018: Nil).

The majority of the Group entities are Russian tax residents. Effective tax rate for the six months ended 30 June 2019 is charged at 13.9% (H1 2018: 33.6%), representing the best estimate of the average annual effective income tax rate expected for the full year, excludes withholding tax, applied to the pre-tax income of the six months period. The effective income tax rate in the first half of 2019 is lower than the statutory rate of 20% for the Russian Federation mainly due to non-deductible expenses and the lower tax rates on overseas losses.

The actual tax expense differs from the amount which would have been determined by applying the statutory rate of 20% for the Russian Federation to profit before income tax as a result of the application of relevant jurisdictional tax regulations, which disallow certain deductions which are included in the determination of accounting profit.

*Withholding tax on dividends represents 15% of dividends paid by Russian subsidiaries to holding company.

**Changes in the in temporary difference was caused by future tax revaluation of the rouble depreciation as at the end of the period.

 

 

 

6. Mine properties, exploration and evaluation assets, and property, plant and equipment

 

Reconciliation of fixed assets for the period ending 30 June 2019

 

 

Exploration and evaluation assets

 

Mining assets

 

Stripping activity assets

 

Freehold building

 

Plant and equipment

 

Construction in progress

 

Total

 

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

Cost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2018

 

93,503

 

848,688

 

18,785

 

233,402

 

260,477

 

91,159

 

1,546,014

Additions

 

3,227

 

9,082

 

5,090

 

-

 

8

 

16,600

 

34,007

Lease under IFRS16****

 

-

 

-

 

-

 

2,319

 

-

 

-

 

2,319

Transfers

 

209

 

860

 

-

 

2,462

 

5,722

 

(9,253)

 

-

Write-off*

 

(301)

 

-

 

-

 

(370)

 

(3,893)

 

-

 

(4,564)

Disposals

 

-

 

-

 

-

 

(24)

 

(1,139)

 

(85)

 

(1,248)

Capitalised depreciation

 

163

 

2,110

 

-

 

-

 

-

 

401

 

2,674

Capitalised interest**

 

 

 

5,832

 

-

 

-

 

-

 

-

 

5,832

Change in estimation - site restoration asset***

 

-

 

5,707

 

-

 

347

 

-

 

-

 

6,054

Other movement

 

 

 

191

 

-

 

-

 

(84)

 

578

 

685

At 30 June 2019

 

96,801

 

872,470

 

23,875

 

238,136

 

261,091

 

99,400

 

1,591,773

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Depreciation and impairment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2018

 

531

 

207,346

 

10,411

 

106,139

 

160,109

 

1,862

 

486,398

Provided during the year

 

-

 

10,515

 

1,087

 

3,345

 

8,585

 

-

 

23,532

Transfers

 

-

 

296

 

-

 

(296)

 

-

 

-

 

-

Write-off*

 

-

 

1

 

-

 

(138)

 

(3,832)

 

-

 

(3,969)

Disposals

 

-

 

-

 

-

 

(17)

 

(908)

 

-

 

(925)

Capitalised depreciation

 

-

 

9

 

-

 

1,546

 

1,119

 

-

 

2,674

Capitalised to inventory

 

-

 

2

 

-

 

195

 

448

 

-

 

645

Impairment

 

 

 

-

 

-

 

-

 

-

 

-

 

-

At 30 June 2019

 

531

 

218,169

 

11,498

 

110,774

 

165,521

 

1,862

 

508,355

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net book value:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2018

 

92,972

 

641,342

 

8,374

 

127,263

 

100,368

 

89,297

 

1,059,616

At 30 June 2019

 

96,270

 

654,301

 

12,377

 

127,362

 

95,570

 

97,538

 

1,083,418

 

 

* Write-off for the first half of 2019 in the amount of US$0.6 million relates to retirement of old inefficient equipment.

** Borrowing costs capitalised at Kekura mining assets for the first half of 2019 include US$5.8 million of interest expense (containing US$4.8 million of interest as per agreement increased by US$0.9 million of the modification effect during H1 2019 and capitalised upfront commission of US$0.1 million). The modified effective interest rates were between 3.42% and 6.2% (actual effective interest rates as per agreements: 3.42% and 4.9%).

*** During the first half of 2019 there was a change in the rehabilitation estimate associated with the change in volumes of expected site restoration activities, discount and inflation rates. The net present value of the increase in the cost estimate is US$6.1 million (increase of US$2.3 million at MNV, increase of US$1.0 million at RV, increase of US$1.6 million at Novo, increase of US$ 0.8 million at BG, increase of US$0.1 million at Klen and increase of US$ 0.3 million at Kekura) which was booked as an increase to mining assets and non-current provisions.

**** Addition under IFRS 16 for the first half of 2019 represent right-of-use RDM office in lease in amount of US$2.3 million.

No plant and equipment has been pledged as security for bank loans in the first half of 2019.

Mine assets in the interim consolidated statement of financial position comprise mine assets and stripping activity assets.

Property, plant and equipment in the interim consolidated statement of financial position comprise freehold building, plant and equipment and construction in progress.

 

Reconciliation of fixed assets for the period ending 30 June 2018

 

 

 

Exploration and evaluation assets

 

Mining assets

 

Stripping activity assets

 

Freehold building

 

Plant and equipment

 

Construction in progress

 

Total

 

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

 

US$000

Cost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2017

 

88,926

 

768,181

 

19,724

 

218,474

 

237,103

 

76,852

 

1,409,260

Additions

 

2,139

 

7,490

 

738

 

14

 

79

 

21,218

 

31,678

Transfers

 

(258)

 

4,968

 

-

 

(583)

 

8,239

 

(12,366)

 

-

Write-off*

 

-

 

-

 

-

 

(176)

 

(1,560)

 

-

 

(1,736)

Disposals

 

-

 

-

 

-

 

(174)

 

(433)

 

(264)

 

(871)

Capitalised depreciation

 

131

 

2,477

 

-

 

-

 

-

 

612

 

3,220

Capitalised interest**

 

-

 

1,017

 

-

 

-

 

-

 

-

 

1,017

Change in estimation - site restoration asset***

 

-

 

(1,403)

 

-

 

-

 

-

 

-

 

(1,403)

Other movement

 

 -

 

 

 

 

(111)

 

(66)

 

(177)

At 30 June 2018

 

90,938

 

782,730

 

20,462

 

217,555

 

243,317

 

85,986

 

1,440,988

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Depreciation and impairment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2017

 

-

 

191,223

 

8,647

 

96,375

 

145,302

 

1,590

 

443,137

Provided during the year

 

-

 

7,974

 

2,202

 

2,940

 

7,630

 

-

 

20,746

Transfers

 

-

 

-

 

-

 

-

 

-

 

-

 

-

Write-off*

 

-

 

-

 

-

 

(50)

 

(1,432)

 

-

 

(1,482)

Disposals

 

-

 

-

 

-

 

(155)

 

(421)

 

-

 

(576)

Capitalised depreciation

 

-

 

130

 

-

 

1,561

 

1,529

 

-

 

3,220

Capitalised to inventory

 

-

 

2

 

-

 

193

 

(16)

 

-

 

179

Impairment

 

531

 

-

 

-

 

-

 

-

 

-

 

531

At 30 June 2018

 

531

 

199,329

 

10,849

 

100,864

 

152,592

 

1,590

 

465,755

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net book value:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

At 31 December 2017

 

88,926

 

576,958

 

11,077

 

122,099

 

91,801

 

75,262

 

966,123

At 30 June 2018

 

90,407

 

583,401

 

9,613

 

116,691

 

90,725

 

84,396

 

975,233

 

* Write-off for the first half of 2018 in the amount of US$0.3 million relates to retirement of old inefficient equipment.

** Borrowing costs capitalised at Kekura mining assets for the first half of 2018 include US$0.9 million of interest expense (containing US$3.5 million of interest as per agreement increased by US$0.8 million of the modification effect during H1 2018 decreased by US$3.4 million of the modification effect as at 01 January 2018) and capitalised upfront commission of US$0.1 million. The modified effective interest rates were between 3.0% and 6.2% (actual effective interest rates as per agreements: 3.0% and 4.7%).

*** During the first half of 2018 there was a change in the rehabilitation estimate associated with the change in volumes of expected site restoration activities, discount and inflation rates. The net present value of the decrease in the cost estimate is US$1.4 million (decrease of US$1.3 million at MNV, decrease of US$0.4 million at Novo, increase of US$ 0.3 million at BG and decrease of US$ 0.04 million at Kekura) which was booked as an decrease to mining assets and non-current provisions.

No plant and equipment has been pledged as security for bank loans in the first half of 2018.

Mine assets in the interim consolidated statement of financial position comprise mine assets and stripping activity assets.

Property, plant and equipment in the interim consolidated statement of financial position comprise freehold building, plant and equipment and construction in progress.

 

 

 

7. Financial assets and liabilities

Fair value hierarchy

The Group uses the following hierarchy for determining and disclosing the fair value of financial instruments by valuation technique:

Level 1: quoted (unadjusted) prices in active markets for identical assets or liabilities

Level 2: other techniques for which all inputs which have a significant effect on the recorded fair value are observable, either directly or indirectly

Level 3: techniques which use inputs which have a significant effect on the recorded fair value that are not based on observable market data.

The carrying amounts of financial instruments, such as cash, accounts receivable and payable, loans payable, approximate their fair value. These receivables relate to sales contracts where the selling price is determined after delivery to the customer, based on the market price at the relevant quotational period (QP) stipulated in the contract.

 

The Group held the following financial instruments measured at fair value:

Assets measured at fair value

30 June 2019

Level 1

Level 2

 

US$000

US$000

US$000

Trade receivables, incl. Provisionaly priced trade receivables

16,441

-

16,441

 

 

 

 

 

 

 

 

In H1 2019, concentrate sales include a positive fair value movement of US$1.5 million (H1 2018: US$0.3 million) relating to a provisionaly priced trade receivables.

 

Changes in liabilities arising from financing activities

 

 

1 January 2019

New leases under IFRS 16 as at 1 January 2019

Cash flow

Accrued interest

Foreign exchange movement

Modification

Other

30 June 2019

 

 

US$000

US$000

US$000

US$000

US$000

US$000

US$000

US$000

Interest bearing loans and borrowings (excluding items listed below)

 

247,851

-

(32,787)

4,894

143

863

61

221,025

Obligations under leases and hire purchase contracts

 

2,318

2,319

(809)

175

259

-

(86)

4,176

Total liabilities from financing activities

 

250,169

2,319

(33,596)

5,069

402

863

(25)

225,201

 

8. Commitments and contingencies

Capital commitments

At 30 June 2019, the Group had commitments of US$20.0 million (at 31 December 2018: US$8.2 million, at 30 June 2018: US$24.2 million) principally relating to development assets and US$3.6 million (at 31 December 2018: US$3.2 million, at 30 June 2018: US$2.6 million) for the acquisition of new machinery.

Contingent liabilities

Management has identified possible tax claims within the various jurisdictions in which the Group operates totalling US$ nil million at 30 June 2019 (at 31 December 2018: US$0.3 million, at 30 June 2018: US$0.4 million).

 

 

 

9. Inventories

 

30 June

31 December

30 June

2019

2018

2018

unaudited

audited

unaudited

Non-current*

US$000

US$000

US$000

Ore stockpiles

26,634

21,072

19,708

Ore stockpile obsolescence provision**

(23,671)

(18,506)

(17,693)

Total non-current inventories

2,963

2,566

2,015

 

 

30 June

31 December

30 June

2019

2018

2018

unaudited

audited

unaudited

Current

US$000

US$000

US$000

Raw materials and consumables

47,164

59,371

46,659

Ore stockpiles

16,709

14,785

13,507

Gold in progress

5,488

5,202

6,081

Finished goods

3,035

3,351

2,630

 

72,396

82,709

68,877

 

 

 

 

Raw materials and consumables obsolescence provision***

(12,202)

(12,250)

(12,223)

Ore stockpile obsolescence provision**

(513)

-

(91)

Total  current inventories

59,681

70,459

56,563

 

* The portion of the ore stockpiles that is to be processed in more than 12 months from the reporting date is classified as non-current inventory.

** Stockpiled low-grade ore at BG and RV is tested for impairment semi-annually. Movement in ore stockpile obsolescence provision at BG amounted to US$1.8 million (H1 2018: US$Nil) and at RV amounted to US$3.9 million in H1 2019 recognised in other operating expenses.

*** Movement in raw materials and consumables obsolescence provision amounted to US$0.05 million in the first half of 2019 (H1 2018: US$0.02 million). No inventory has been pledged as security.

 

10. Cash and cash equivalents

Cash at bank earns interest at fixed rates based on daily bank deposit rates. The fair value of cash and cash equivalents is equal to the carrying value.

For the purpose of the interim consolidated cash flow statement, cash and cash equivalents comprise the following:

 

 

 

30 June

31 December

30 June

2019

2018

2018

unaudited

audited

unaudited

 

US$000

US$000

US$000

Cash at bank and in hand

1,914

8,291

8,683

Short term deposits

6,370

30,445

2,223

 

 

8,284

38,736

10,906

 

 

 

 

11. Interest-bearing loans and borrowings

 

 

 

 

 

30 June 2019unauditedUS$000*

31 December 2018auditedUS$000*

30 June 2018unauditedUS$000*

 

Nominal interest rate as per agreement %

Effective interest rate %

Modification

Maturity

Current

 

 

 

 

 

 

 

UniCredit loan (3)

4.53 (2018: 4.58)

6.2

 Modified

June 2020

49,171

25,000

-

Raiffaizen loan (4)

 (2018: 4.60)

5.64

 Modified

November 2019

-

10,865

11,000

UniCredit loan (5)

3.4 (2018: 3.4)

3.78

 Modified

October 2020

24,119

24,887

16,517

Sberbank loan (7)

1.50

1.50

 Non-modified

May 2022

320

239

235

Rosbank loan (10)

3.96

3.96

 Non-modified

September 2019

25,000

25,000

-

Rosbank loan (11)

3.97

3.97

 Non-modified

September 2019

8,000

8,000

-

Sberbank loan (15)

1.5

1.5

 Non-modified

July 2022

248

186

 

Total current loans

 

 

 

 

106,858

94,177

27,752

Non-current

 

 

 

 

 

 

 

Gazprombank loan (1)

3.10

3.10

 Non-modified

March 2020

-

-

40,630

Sberbank loan (2)

3.42

3.42

 Non-modified

August 2021

20,000

20,000

20,000

UniCredit loan (3)

 4.1 (2017: 3.6)

 6.2 (2017: 3.6)

 Modified

June 2020

-

23,515

47,836

Raiffaizen loan (4)

 (2018: 4.60)

5.6

 Modified

November 2019

-

-

5,207

UniCredit loan (5)

3.4 (2018: 3.4)

3.78

 Modified

October 2020

8,330

20,747

33,172

Alfa-bank loan (6)

3.0

3.0

 Non-modified

December 2019

-

-

22,000

Sberbank loan (7)

1.5

1.5

 Non-modified

May 2022

471

598

705

Raiffaizen loan (8)

 4.9; 4.55

 4.9; 4.55

 Non-modified

September 2022

20,000

6,250

-

Raiffaizen loan (9)

 4.8; 3.97

 4.8; 3.97

 Non-modified

September 2022

40,000

40,000

-

UniCredit loan (12)

4.80

4.80

 Non-modified

December 2023

25,000

25,000

-

Gazprombank loan (13)

5.55

5.55

 Non-modified

April 2021

-

7,329

 

Expobank loan (14)

5.00

5.00

 Non-modified

April 2022

-

9,770

-

Sberbank loan (15)

1.50

1.50

 Non-modified

July 2022

366

465

 

Total non-current loans

 

 

 

 

114,167

153,674

169,550

Total interest-bearing loans

 

 

 

 

221,025

247,851

197,302

* include current portion of non-current loans

 

(1) The loan was repaid in September 2018.

 

(2) In August 2017, the Group secured a revolving facility with Sberbank with the draw period set until 14 August 2021. The interest rate is set for every instalment separately. The loan is repayable in instalments between August 2017 and August 2021. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$20.0 million (31 December 2018: US$20.0 million). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5.

 

(3) In December 2015, the Group raised financing with UniCredit bank. In November 2017, the interest rate decreased to LIBOR USD 1M + 2.05% from LIBOR USD 1M + 2.8% in June 2017 (2016: LIBOR USD 1M + 4.0%) with the draw period set until 17 January 2016. Due to implementation of new requirement of IFRS 9 effective rate is LIBOR 1M at the date of modification + 5%. The loan is repayable in instalments between July 2019 and June 2020 (2016: between July 2017 and December 2018). The drawn down payable balance obtained under the agreement at 30 June 2019 is US$50.0 million (December 2018: US$50.0). Due to implementation of new requirement of IFRS 9 book value of the loan was modified and at 30 June 2019 is US$49.2 million (31 December 2018: US$48.5 million). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5 and the Group EBITDA to interest expense ratio should be equal to or higher than 4.0.

 

(4) The loan was repaid in March 2019.

 

 

(5) In October 2016, the Group raised financing with UniCredit bank adjusted for an upfront fee 0.9% with the draw period set until 20 November 2016. In November 2017, the interest rate decreased to 3.4% from 3.55% in 2016. Due to implementation of new requirement of IFRS 9 the effective rate is 3.8%. The loan is repayable October 2020 (2016: October 2019). The drawn down payable balance obtained under the agreement at 30 June 2019 is US$32.5 million (December 2018: US$45.8). Due to implementation of IFRS 9 the book value of the loan was modified and at 30 June 2019 is US$32.5 million (31 December 2018: US$45.6). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5; the ratio of EBITDA to interest expenses should be equal to or higher than 4.0.

 

(6) The loan was repaid in September 2018.

 

 

(7) In May 2018, the Group raised financing with Sberbank with the draw period set until 31 August 2018. The rouble-based interest rate of 8.75% was decreased to 1.50% upon receipt of Belarus governmental compensation. The loan is repayable in instalments between September 2018 and May 2022. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$0.8 million (31 December 2018: 0.8). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5.

 

(8) In September 2018, the Group secured a revolving facility with Raiffeisenbank with the draw period set until 14 January 2019. The interest rate is set for every instalment separately. The loan is repayable in instalments until 14 September 2022. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$20.0 million (31 December 2018: US$ 6.3 million). The outstanding bank debt is subject to the following covenants: the ratio of total net debt to EBITDA should be equal to or lower than 4.0; the ratio of EBITDA to interest expense should be equal to or higher than 4.0; the ratio of total net debt to Equity should be lower than 0.6.

 

(9) In September 2018, the Group (MNV) secured a revolving facility with Raiffeisenbank with the draw period set until 09 January 2019. The interest rate is set for every instalment separately. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$40.0 million (31 December 2018: US$40.0 million). The outstanding bank debt is subject to the following covenants: the ratio of total net debt to EBITDA should be equal to or lower than 4.0; the ratio of EBITDA to interest expense should be equal to or higher than 4.0; the ratio of total net debt to Equity should be lower than 0.6.

 

(10) In September 2017, the Group (MNV) secured a revolving facility with Rosbank. The interest rate is set for every instalment separately. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$25.0 million (31 December 2018: US$25.0 million). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5; the ratio of EBITDA to interest expense should be equal to or higher than 4.0.

 

(11) In September 2017, the Group (BG) secured a revolving facility with Rosbank. The interest rate is set for every instalment separately. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$8.0 million (31 December 2018: US$8.0 million). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5; the ratio of EBITDA to interest expense should be equal to or higher than 4

 

(12) In December 2018, the Group secured a revolving facility with UniCreditbank with the draw period set until 27 November 2023. The interest rate is set for every instalment separately. The loan is repayable in instalments between December 2018 and December 2023. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$25.0 million (31 December 2018: US$25.0 million). The outstanding bank debt is subject to the following covenants: the ratio of net debt to EBITDA should be equal to or lower than 3.5; the ratio of EBITDA to interest expense should be equal to or higher than 4.0

 

(13) The loan was repaid in March 2019.

 

(14) The loan was repaid in March 2019.

 

(15) Loan agreement with Sberbank signed on 06 July 2018 with the draw period set until 20 October 2018. The rouble-based interest rate of 8.75% was decreased to 1.50% upon receipt of Belarus governmental compensation. The loan is repayable in instalments between 25 October 2018 and 05 July 2022. The drawn down payable balance obtained under the agreement at 30 June 2019 is US$0.6 million (31 December 2018: US$0.7 million). The outstanding bank debt is subject to the following covenant: the ratio of net debt to EBITDA should be equal to or lower than 3.5

 

The total outstanding bank debt of the Group at 30 June 2019 is US$221.0 million. There were no covenant breaches as at 30 June 2019.

 

12. Share Capital

The total amount of the authorised ordinary shares of £0.001 each remained unchanged and equalled 750,000,000. Ordinary shares issued and fully paid amounted to 363,843,441 shares, representing US$634 thousand.

 

 

13. Related party transactions

There were no related party transactions during the first half of 2019.

During the first half of 2018 OJSC Novo-Shirokinsky Rudnik performed a partial redemption of its shares acquired in prior periods. As a result, the share of non-controlling interest increased by US$4 thousand.

The Group had applied the provisional accounting approach for the companies Rudnik Valunisty LLC, Kanchalano-Amguemskaya Square LLC and Severo-Vostochnaya Gorno-Geologicheskaya Company LLC under purchase price allocation due to the complexity of the acquisition. The finalisation of the valuation work required to determine the fair values of the assets and liabilities acquired will be completed within in December 2019. There were no updates to the provisional fair value calculation as at 30 June 2019.

 

 

14. Earnings per share

Basic earnings per share amounts are calculated by dividing profit for the period attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the period.

Diluted earnings per share amounts are calculated by dividing the profit attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the period plus the weighted average number of ordinary shares that would be issued on the exercise of share options into ordinary shares.

The following reflects the income and share data used in the basic and diluted earnings per share computations:

 

 

 

 

For the six months ended 30 June

 

 

2019

 

2018

 

 

US$000

 

US$000

 

 

 

 

 

Net profit attributable to ordinary equity holders of the parent

 

45,403

 

28,557

 

 

 

 

 

 

 

Thousands

 

Thousands

Weighted average number of ordinary shares for basic earnings per share

 

363,843

 

325,222

There have been no other transactions involving ordinary shares or potential ordinary shares between the reporting date and the date of completion of these financial statements.

The share capital comprises only one class of ordinary shares, which carry a voting right and the right to a dividend. There are no restrictions on the distribution of dividends and the repayment of capital.

 

15. Impairment of goodwill and non-current assets

In accordance with the Group's accounting policy, goodwill is tested for impairment annually and when circumstances indicate the carrying value may be impaired.

When there is an indicator of impairment of non-current assets within a cash-generating unit (CGU) or a group of CGUs containing goodwill, non-current assets are tested for impairment first at each CGU and any impairment loss on the non-current assets is recognised before testing the groups of CGUs for potential goodwill impairment. Impairment is recognised when the carrying amount exceeds the recoverable amount.

Non-current assets are tested for impairment when events or changes in circumstances suggest that the carrying amount may not be recoverable. The assessment is done at the CGU level, which is the lowest level for which identifiable cash flows are largely independent of the cash flows of other assets.

 

16. Events after the reporting period

In August, to take advantage of falling interest rates, the Company restructured its existing debt portfolio with US$103 million in longer-term credit agreements with Rosbank, Sberbank and Alfa Bank, thereby increasing the average loan tenor from 18.1 to 36.6 months and lowering the average effective interest rate from 4.2% to 4.09%.

 

The Board of Directors has approved an interim dividend of £0.05 per share, to be paid to shareholders on 04 October 2019. The ex-dividend date is 12 September 2019 and the record date is 13 September 2019.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
IR UUABRKUAKRAR
Date   Source Headline
17th Nov 20205:48 pmRNSCOMPULSORY ACQUISITION OF OUTSTANDING SHARES
3rd Nov 20205:10 pmRNSOFFER EXTENDED
29th Oct 20207:05 amRNSHolding(s) in Company
29th Oct 20207:00 amRNSQ3 2020 Operating Results
28th Oct 202011:55 amRNSHolding(s) in Company
26th Oct 20209:38 amRNSHolding(s) in Company
23rd Oct 20208:38 amRNSHolding(s) in Company
22nd Oct 202012:04 pmBUSForm 8.3 - HIGHLAND GOLD MINING LTD
21st Oct 20205:30 pmRNSHighland Gold Mining
21st Oct 20205:30 pmRNSCancellation of Trading on AIM
21st Oct 20202:03 pmBUSForm 8.3 - Highland Gold Mining
21st Oct 20201:45 pmRNSDirectorate Changes
21st Oct 20201:34 pmBUSForm 8.3 - HIGHLAND GOLD MINING LTD
21st Oct 202011:43 amRNSDirector/PDMR Shareholding
21st Oct 202011:21 amRNSForm 8.3 - Highland Gold Mining Ltd
21st Oct 202010:36 amRNSForm 8.5 (EPT/NON-RI)
21st Oct 20208:52 amRNSForm 8.3 - Highland Gold Mining Ltd
20th Oct 20205:45 pmRNSOFFER DECLARED WHOLLY UNCONDITIONAL
20th Oct 202012:52 pmPRNForm 8.3 - Highland Gold Mining Ltd
20th Oct 202011:39 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
20th Oct 202010:53 amRNSForm 8.5 (EPT/NON-RI)
20th Oct 20208:34 amRNSForm 8.3 - Highland Gold Mining Ltd
20th Oct 20208:29 amRNSForm 8.5 (EPT/RI)
20th Oct 20207:00 amRNSHolding(s) in Company
19th Oct 202012:38 pmPRNForm 8.3 - Highland Gold Mining Ltd
19th Oct 202011:46 amRNSForm 8.5 (EPT/NON-RI)
19th Oct 202010:15 amBUSForm 8.3 - Highland Gold Mining Ltd
19th Oct 20208:53 amRNSForm 8.3 - Highland Gold Mining Ltd
19th Oct 20208:52 amRNSForm 8.5 (EPT/RI)
16th Oct 202011:11 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
16th Oct 20209:27 amRNSForm 8.5 (EPT/RI)-Amendment
16th Oct 20208:33 amRNSForm 8.5 (EPT/RI)
15th Oct 202010:22 amBUSFORM 8.3 - HIGHLAND GOLD MINING LTD
15th Oct 20209:22 amRNSForm 8.5 (EPT/RI)
14th Oct 202010:41 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
14th Oct 20209:28 amRNSForm 8.5 (EPT/RI)
14th Oct 20208:32 amRNSForm 8.5 (EPT/NON-RI)
13th Oct 20205:07 pmPRNForm 8.3 - DD Highland Gold 13102020
13th Oct 20201:49 pmBUSForm 8.3 - Highland Gold Mining
13th Oct 202012:18 pmBUSForm 8.3 - Highland Gold Mining Ltd
13th Oct 20209:35 amRNSForm 8.5 (EPT/NON-RI)
13th Oct 20209:21 amRNSForm 8.5 (EPT/RI)
12th Oct 20203:05 pmRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 202012:14 pmPRNForm 8.3 - Highland Gold Mining Ltd
12th Oct 202011:21 amBUSFORM 8.3 - HIGHLAND GOLD MINING LTD
12th Oct 202010:15 amRNSForm 8.5 (EPT/NON-RI)
12th Oct 20209:49 amRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 20209:46 amRNSForm 8.5 (EPT/RI)
12th Oct 20208:20 amRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 20207:00 amRNSForm 8.3 - [Highland Gold Mining Ltd]

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.