Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Centurion Update

13 Nov 2008 07:00

RNS Number : 0568I
Nighthawk Energy plc
13 November 2008
 



Nighthawk Energy plc

Centurion Project Update

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM: HAWK), the US focused hydrocarbon production and development company, are pleased to announce an operational update in respect of the Centurion project. Nighthawk holds a 50 per cent. interest in the project, operated by Running Foxes Petroleum Inc. ("Running Foxes"), which holds the remaining percentage interest.

Franklin 13-6 well placed on production at a restrained rate of 80 barrels of oil per day 

Hydrocarbons encountered at Atoka-Nighthawk 12-29 in the Simpson and Mississippian sandstones

Water and gas lines being laid to previously drilled water disposal well, lowering water disposal costs from US$3.00 to US$0.10 per barrel

The Centurion project, which is located in Sumner County, Kansas, covers approximately 15,000 acres and lies within the prolific Sedgwick Basin which has produced from the Arbuckle, Simpson, Viola, Mississippian and Cherokee horizons at depths of less than 5,000 feet.

On 8 October 2008, Nighthawk announced that two low cost exploration wells had been drilled, the Franklin 13-6 and the Atoka Nighthawk 13-11, both of which indicated positive results. The initial wells were located on a major basement flexure testing multiple pay zones. In addition, the drilling of the Atoka-Nighthawk 12-29 well had commenced at that time.

Franklin 13-6

The Franklin 13-6 well reached total depth at 3,904 feet and encountered excellent live oil shows and large mudlog gas kicks throughout a 60 foot zone from 3,391 to 3,451 in the Mississippian Chat, a carbonate reservoir and prolific production horizon in the area.

The Franklin 13-6 well has since been completed in three Mississippian zones and placed on production. The well is now moving 160 barrels of fluid a day with an oil cut of 50 per cent., equating to current production of 80 barrels of oil per day and associated gas The installation of a higher capacity pumpjack is being considered by the operator in order to move greater volumes of fluids, which is expected to increase oil production significantly. 

The operator is currently laying water and gas lines to the water disposal well Andra 16-12 drilled by Nighthawk and Running Foxes during 2007. Operation of the water disposal well will have a dramatic effect on project economics. Water can be moved to the water disposal well for  approximately  US$0.10 per barrel compared to US$3.00 by trucking.

Atoka-Nighthawk 13-11 

The Atoka-Nighthawk 13-11 well was completed at 4,000 feet and is dewatering the Excello, Summit and V shales. The well is making increasing amounts of gas and the operator is pursuing a tap facility to sell product. Regional infrastructure is good and an accessible major pipeline is located near to the project area.

Atoka-Nighthawk 12-29

The Atoka-Nighthawk 12-29 well has encountered hydrocarbons in both the Simpson and Mississippian sandstone. The well is being completed in a Simpson sand and will be acidised in the near future.

Estimated oil in place for conventional reservoirs in the Centurion project area vary from 5,000 to 500,000 barrels of oil per well on 40 acre spacing depending on reservoir characteristics.

David Bramhill, Managing Director of Nighthawk commented "This initial success at Centurion is very encouraging and the land base of in excess of 15,000 acres offers substantial potential for the future. Of Nighthawk's seven projects in which it holds significant interests ranging from 50 to 80 per cent., four are now in production, Jolly Ranch, Devon Oilfield, Cisco Springs and Centurion. During the remainder of 2008 we also expect some of the Buchanan Group projects to attain production status. The success of the Centurion wells highlights the technical skills of our partner Running Foxes who maintain a drilling success rate of in excess of 90 per cent. over our jointly held projects."

David Racher B.Sc (Hons) Geology, who is a consultant to Nighthawk and has over 37 years of experience in the hydrocarbons industry and previously managed the Lasmo plc onshore US portfolio in KansasLouisianaSouth DakotaTexas and Wyoming, has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill

01271 882160

davidbramhill@nighthawkenergy.net

Hanson Westhouse Limited

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3350

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBRBDBDSBGGID
Date   Source Headline
26th Mar 20097:00 amRNSHalf Yearly Report
10th Mar 20097:00 amRNSDevon Project Update
27th Feb 200912:09 pmRNSTotal Voting Rights
24th Feb 20097:00 amRNSJolly Ranch Well Acquisition
19th Feb 20097:00 amRNSDevon Discovery
12th Feb 200912:20 pmRNSHolding(s) in Company
12th Feb 200912:17 pmRNSHolding(s) in Company
5th Feb 20097:00 amRNSPlacing
21st Jan 20097:00 amRNSHolding(s) in Company
6th Jan 20097:00 amRNSJolly Ranch Update
19th Dec 20087:00 amRNSJolly Ranch Operational Update
17th Dec 20089:43 amRNSHolding(s) in Company
10th Dec 20087:00 amRNSDirectorate Change and Senior Appointment
9th Dec 200810:43 amRNSHolding(s) in Company
2nd Dec 20089:17 amRNSHolding(s) in Company
1st Dec 20081:01 pmRNSTotal Voting Rights
1st Dec 200810:03 amRNSHolding(s) in Company
26th Nov 20082:55 pmRNSResult of AGM
26th Nov 20087:00 amRNSJolly Ranch Group Update
25th Nov 20087:00 amRNSPlacing of ?5million
13th Nov 20087:00 amRNSCenturion Update
3rd Nov 20087:00 amRNSJolly Ranch Update
29th Oct 20084:38 pmRNSPrice Monitoring Extension
27th Oct 20087:00 amRNSFinal Results
8th Oct 200811:21 amRNSHolding(s) in Company
8th Oct 20087:00 amRNSUpdate on Projects
2nd Oct 20087:55 amRNSUpdate on Projects
23rd Sep 20087:00 amRNSHolding(s) in Company
18th Sep 20087:00 amRNSBuchanan Group Projects Update
4th Sep 20085:20 pmRNSHolding(s) in Company
21st Aug 20089:34 amRNSJolly Ranch Update
29th Jul 20089:05 amRNSHolding(s) in Company
24th Jul 20089:58 amRNSHolding(s) in Company
17th Jul 20089:06 amRNSHolding(s) in Company
30th Jun 20084:03 pmRNSTotal Voting Rights
16th Jun 20087:00 amRNSJolly Ranch and Middle Mist P
9th Jun 20087:00 amRNSBuchanan and Worden Projects
4th Jun 20084:51 pmRNSIssue of Equity
3rd Jun 20087:00 amRNSDevon Oilfield Update
30th May 200812:13 pmRNSTotal Voting Rights
27th May 20084:29 pmRNSIssue of Equity
7th May 20087:00 amRNSJolly Ranch Update
1st May 20082:01 pmRNSHolding(s) in Company
30th Apr 20085:11 pmRNSTotal Voting Rights
30th Apr 20087:01 amRNSJolly Ranch Update
22nd Apr 200812:51 pmRNSHolding(s) in Company
14th Apr 20084:39 pmRNSHolding(s) in Company
4th Apr 20081:56 pmRNSIssue of Equity
28th Mar 20087:01 amRNSHolding(s) in Company
18th Mar 20088:46 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.