The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Jolly Ranch Update

6 Jan 2009 07:00

RNS Number : 1417L
Nighthawk Energy plc
06 January 2009
 



Nighthawk Energy plc

Jolly Ranch Update

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM: HAWK), the US focused hydrocarbon production and development company, are pleased to announce an operational update in respect of the Jolly Ranch Group project, located in Elbert, Lincoln and Washington Counties, Colorado. Nighthawk holds a 50 per cent. working interest in the project and the operator, Running Foxes Petroleum Inc. ("Running Foxes"), holds the remaining interest.

Highlights

Co-mingling of Atoka, Cherokee and Marmaton reservoirs from single wells underway, minimising costs, increasing rate of return per well and reducing the need for multiple wells on single location

Codell wells Jolly 9C-1 and Jolly 16C-1 reach total depth, encounter hydrocarbons and have been cased for production

Rig moved to the Fisher 14-20 location in the Middle Mist area to test prolific J Sand formation

Ongoing independent evaluation of newly acquired Bluebird Oilfield exceeding original expectations

Current average Jolly Ranch operating profit threshold indicated to be US$25.00 per barrel 

The Jolly Ranch Group project is a major hydrocarbon production and development venture which includes Jolly Ranch, currently the core area, Middle Mist and Mustang Creek, to the north and west of Jolly Ranch respectively. The total project area comprises 370,578 gross acres (281,069 acres on a net basis).

Drilling results from the initial ten wells drilled have established Jolly Ranch as a significant new oil and natural gas field, particularly in the Atoka and Cherokee shales, which are laterally extensive and are believed to be continuous over the entire project area. In addition, several conventional oil bearing zones, in particular the Marmaton, have been penetrated during drilling.

Co-mingling of production

Under the rules and regulations of the Colorado Oil and Gas Commission, co-mingling of production from the Atoka, Cherokee and Marmaton reservoirs is permitted at Jolly Ranch.  The reservoir characteristics in terms of age of rock and pressure data imply similarity and are therefore not expected to result in production problems. This means that the requirement for multiple wells on one location to produce from separate formations is reduced as production is permitted from multiple reservoirs simultaneously from one well, minimising costs and increasing the rate of return on a per well basis.

The previously drilled wells, the Craig 15-34 and the Craig 4-4, have been placed on production following perforation and acidisation in the Tebo and Lower Atoka shales. Both wells swabbed between 90 and 100 per cent. oil prior to being placed on production. These wells are now awaiting further completion in the Upper Atoka, V and Excello shales and the conventional Marmaton zone.

The Craig 8-1 well, which initially produced from the Lower Atoka shales, has also been completed in the Tebo shales and is now producing from both formations.

All of the ten initial wells, with the exception of the Jolly 10-1 which will be used as a water disposal well, have been or will be subjected to slickwater and sand fraccing in the Cherokee zones. This process has proved to be successful based on the results from the Craig 15-32, Craig 8-1, Jolly 16-1 and Jolly 4-13 wells. 

The Craig 15-32, Jolly 2-1 and Jolly 16-1 wells continue to produce at previously reported rates. Production of 1,000 barrels of oil per day (gross) at Jolly Ranch is targeted to be reached during Q1 2009.

Codell and J Sand drilling programme

As announced on 19 December 2008 a drilling programme has commenced to test the shallow Codell and J Sand formations, which are of Cretaceous age located at depths of between 3,000 and 4,000 feet and are both prolific producing zones in the region.

Two wells testing the Codell formation, the Jolly 9C-1 and the Jolly 16C-1, have reached total depth, encountered hydrocarbons based on petrophysical log evaluation and have been cased for production.

Black Gold Inc., a local drilling company, has moved the rig to the Fisher 14-20 which is located in the Middle Mist area of the project. The well is designed to test the J Sand formation at less than 6,000 feet. The well is an offset to a historical well that encountered significant hydrocarbons which, based on log analysis, had 17.5 feet of pay in the J Sand with 374,566 barrels of oil in place.

Bluebird Oilfield

The Bluebird Oilfield was acquired in December 2008 as part of a land package offered at a State of Colorado land sale. The acreage lies within the Mustang Creek section of the Jolly Ranch Group project.

Independent evaluation of historical data is ongoing, however indications are that the original estimates of between one to four million barrels of recoverable oil are understated. Evaluation of the Bluebird continues with drilling and development expected to commence during Q2 2009.

Jolly Ranch profitability threshold

The directors estimate that the current operating breakeven threshold at Jolly Ranch is an oil price of approximately US$25.00 per barrel. However, vendor prices are falling substantially, in some cases by as much as 30 to 40 per cent. This reduction in costs is being reflected in the operational expenditure on the project and, if this trend continues, the directors expect that the operating breakeven oil price could fall to US$15.00 per barrel.

Many hydrocarbon projects in the US are being suspended or cancelled due to operating costs of between US$30 to US$60 per barrel. Nighthawk's current profitability threshold demonstrates the financial robustness of the Jolly Ranch project.

David Racher B.Sc (Hons) Geology, who is a consultant to Nighthawk and has over 37 years of experience in the hydrocarbons industry and previously managed the Lasmo plc onshore US portfolio in KansasLouisianaSouth DakotaTexas and Wyoming, has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill

07801 540358

davidbramhill@nighthawkenergy.net

Hanson Westhouse Limited

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3350

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUUUQWGUPBGMA
Date   Source Headline
19th Jul 20187:00 amRNSUpdate on Chapter 11 cases
29th Jun 20187:00 amRNSChapter 11 update and resignation of Nomad
26th Jun 20187:00 amRNSUpdate on Chapter 11 cases
11th Jun 20187:00 amRNSCancellation of GM and Chapter 11 Update
31st May 20183:06 pmRNSNotice of General Meeting
16th May 20187:00 amRNSChapter 11 update
14th May 20185:48 pmRNSUpdate on Chapter 11 proceedings
10th May 20187:00 amRNSRequisition of general meeting
4th May 20185:17 pmRNSDirectorate Change
1st May 20187:30 amRNSSuspension - Nighthawk Energy Plc
1st May 20187:00 amRNSNotice of Chapter 11 and Suspension
20th Apr 20187:00 amRNSUpdate on CBA Loan
11th Apr 20187:00 amRNSProduction update
23rd Mar 20187:00 amRNSProduction update
28th Feb 201810:22 amRNSSenior management appointment
20th Feb 20187:00 amRNSProduction Update
14th Feb 20187:00 amRNSSenior management change
25th Jan 20187:00 amRNSAppointment of US Investment Bank
12th Jan 20187:00 amRNSProduction Update
5th Jan 20185:19 pmRNSHolding(s) in Company
28th Dec 20177:00 amRNSAmendment to Existing Bank Agreement
28th Nov 20178:30 amRNSProduction update
22nd Nov 20177:00 amRNSResource Update
7th Nov 20177:00 amRNSDirectorate Change
1st Nov 20177:00 amRNSFarmout Option Agreement
25th Oct 20177:00 amRNSCompany Update
3rd Oct 20177:00 amRNSReserves Based Loan Covenant Compliance
26th Sep 20177:00 amRNSHalf-year Report
14th Sep 20177:00 amRNSCompany Update
30th Aug 20177:00 amRNSAmendment of Loan Notes
3rd Aug 20177:00 amRNSCompany Presentation and Operational Update
3rd Jul 20177:00 amRNSBanking Agreement
23rd Jun 201710:36 amRNSProduction Update and Result of AGM
31st May 20179:36 amRNSReserves Based Loan Covenant Compliance
26th May 20174:03 pmRNSFinal Results
2nd May 20177:00 amRNSReserves Based Loan Covenant Compliance
26th Apr 20177:00 amRNSProduction update
5th Apr 20174:16 pmRNSResults of General Meeting
15th Mar 20177:00 amRNSNotice of GM - Rule 9 Waiver
15th Feb 20177:00 amRNSUpdate re Operations and Year-end Reserves
26th Jan 20177:00 amRNSCorrection - Production Update
24th Jan 20177:00 amRNSProduction Update
18th Jan 20174:35 pmRNSPrice Monitoring Extension
12th Jan 20177:00 amRNSOperations Update
3rd Jan 20177:00 amRNSCompany Update
21st Dec 20164:35 pmRNSPrice Monitoring Extension
16th Dec 20167:00 amRNSMonarch JDA Settlement Agreement
12th Dec 20164:35 pmRNSPrice Monitoring Extension
7th Dec 20164:35 pmRNSPrice Monitoring Extension
2nd Dec 20164:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.