Olympic Gold Project Further Update

22 Jul 2020 07:00

RNS Number : 6812T
Great Western Mining Corp. plc
22 July 2020
 

GREAT WESTERN MINING CORPORATION PLC

("Great Western", "GWM" or the "Company")

 

Olympic Gold Project Further Update

 

Great Western Mining Corporation PLC (AIM - GWMO, Euronext Growth - 8GW) provides a progress report on its recently acquired option over the Olympic Gold Project in Nevada where further targeted surface sample assays taken by exploration personnel have now been successfully analysed in an independent laboratory, with positive results.

 

Results of sampling at the OMCO Mine Extension target were reported to shareholders on 9 July and initial work has now been completed on three further targets in the area:

 

· Trafalgar Hill

· West Ridge

· Rhyolite Dome

 

Preliminary results are set out below:

 

Trafalgar Hill

The Trafalgar Hill target is centred around a small adit on the side of Trafalgar Hill where Great Western's selective sampling of a spoil heap has yielded gold grades of up to 24.20 ppm, as set out in Table 1 below:

 

Sample

UTM NAD83 (m)

Location

Au (ppm)

Ag (ppm)

Easting

Northing

567209

421,086

4,273,785

Trafalgar Hill - Adit T2 dump

24.20

12.40

567212

421,020

4,273,820

Trafalgar Hill - north outcrop

0.05

 

567213

421,033

4,273,697

Trafalgar Hill - south of summit

0.07

0.90

567214

421,072

4,273,608

Trafalgar Hill - Shaft T5 dump

0.01

 

Table 1 Selective sampling results from the Trafalgar Hill prospect.

 

Trafalgar Hill Trafalgar Hill is an area of light volcanic rock, subsequently altered by a significant influx of silica, resulting in a pale, hard, resistant unit. Great Western considers that the vein exploited in the past from the small adit could be significant and ranks it as a strong target for follow up. As this vein has been worked previously, its orientation may be inferred to a reasonable degree of accuracy, meaning that it is effectively drill-ready without the need for further preliminary work.

 

West Ridge

Selective sampling conducted at the target area found anomalous gold and silver assays, see Table 2 below, with a best result of 1.47 ppm gold taken from quartz vein material at a spoil heap. There are few outcrops to be seen but dump material implies that alteration at West Ridge is mixed, with a combination of green propylitic alteration occurring in the spoil heaps and silicification evident. The combination of epithermal vein textures and anomalous gold-silver assays is very encouraging, so follow-up mapping and soil sampling will be carried out to establish vein targets for drill-testing.

 

Sample

UTM NAD83 (m)

Location

Au (ppm)

Ag (ppm)

Easting

Northing

567215

421,713

4,273,348

Target 4 - Shaft 402 dump

0.72

6.50

567216

421,713

4,273,348

Target 4 - Shaft 402 dump

1.47

4.90

567217

421,725

4,273,362

Target 4 - vein 30 m NE of Shaft 402

0.71

1.50

567220

421,683

4,273,321

Target 4 - Adit 403 dump

0.42

4.00

Table 2 Selective sampling results from the West Ridge prospect.

 

Rhyolite Dome

The Rhyolite Dome prospect is located at the south-east end of the Olympic Gold Project claim area, occurring within a heavily-altered felsic unit. Silicification is pervasive, along with other minor alteration styles. A buried breccia target occurs beneath the postulated dome structure, where selective sampling around the dome produced anomalous results, see Table 3. The target zone does not crop out on surface, and so drilling is required in order to test it thoroughly.

 

Sample

UTM NAD83 (m)

Location

Au (ppm)

Ag (ppm)

Easting

Northing

567218

423,449

4,272,027

Rhyolite Dome - dump

0.02

 

567219

423,449

4,272,027

Rhyolite Dome - dump

0.26

2.50

567221

423,389

4,271,921

Rhyolite Dome - quartz ledge

0.04

3.00

567222

423,439

4,271,996

Rhyolite Dome - altered outcrop

0.02

0.40

Table 3 Selective sampling results from the Rhyolite Dome prospect.

 

The above information has been reviewed by William Cooper, who is the Vice-President Exploration of Great Western Mining Corporation PLC. He holds a MSc in Mining Geology from the Camborne School of Mines. He is a Member of the Australian Institute of Geoscientists (MAIG) and is a Qualified Person as defined in the Note for Mining and Oil & Gas Companies which form part of the AIM Rules for Companies. Mr Cooper consents to the inclusion of the information in the form and context in which they appear.

 

Great Western Executive Chairman Brian Hall commented: "Together with the sampling exercise on the OMCO Mine Extension already reported, this completes our initial assessment of the four main targets so far identified at the Olympic Gold Project. The next stage will be a magnetic survey over the OMCO Mine Extension to try to identify mineralisation on the other side of a fault from the original successful gold workings, which produced over 35,000 oz. gold in the first half of the 20th century from high grade rocks. In parallel with this, we expect to use the same contractor to carry out a magnetic survey over part of the RH Group, where soil sampling in late 2019 established gold and silver potential in an area never previously mined. At Mineral Jackpot, we are looking into the option of using a light mobile rig to drill directly into veins which we have already mapped, by-passing the need to drill trenches prior to drilling. Such a rig could potentially be used to assess the ancient spoil heaps at Mineral Jackpot, which we are planning to leach for gold and silver. Due to current trans-Atlantic travel restrictions, we have engaged with local specialist personnel and are now moving forward strongly with our 2020 programme, funded by our recent share placings."

 

 

For further information:

Great Western Mining Corporation PLC

Brian Hall, Chairman

+44 207 933 8780

Max Williams, Finance Director

+44 207 933 8780

 

Davy (NOMAD, Euronext Growth Adviser & Joint Broker)

John Frain

 

+353 1 679 6363

 

Novum Securities (Joint Broker)

Jon Belliss

 

+44 207 399 9400

 

 

ETX Capital (Joint Broker)

Thomas Smith

 

+44 207 392 1494

 

Walbrook PR (PR advisers)

Nick Rome/Nicholas Johnson

 

+44 207 933 8783

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDQFLFLBDLEBBE
Date   Source Headline
9th Jun 202612:24 pmRNSHolding(s) in Company
9th Jun 202612:18 pmRNSHolding(s) in Company
8th Jun 20267:00 amRNSAdmission to Trading on OTCQB in the United States
3rd Jun 202610:30 amRNSHolding(s) in Company
2nd Jun 20267:00 amRNSChange of Nominated Adviser
1st Jun 20267:00 amRNSTungsten Exploration Update
29th May 20267:05 amRNSNotice of AGM
29th May 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
28th May 20267:00 amRNSOption Agreement over Eastside-Tango Project
26th May 202610:00 amRNSExercise of Warrants and Issue of Equity
11th May 202611:30 amRNSExercise of Warrants & Issue of Equity
7th May 20267:00 amRNSMetallurgical Test Work Underway: Tungsten Project
27th Apr 20261:30 pmRNSHolding(s) in Company
27th Apr 20261:30 pmRNSHolding(s) in Company
20th Apr 20269:30 amRNSExercise of Warrants and Issue of Equity
17th Apr 202612:00 pmRNSGrant of Share Options
16th Apr 20267:00 amRNSDrilling Contractor Secured for Tungsten Project
13th Apr 20267:00 amRNSOTCID Application Submitted
18th Mar 20267:00 amRNSExtension of Tungsten Project Area
13th Mar 202611:35 amRNSGrant of Share Options
13th Mar 202611:35 amRNSGrant of Share Options
3rd Mar 20265:06 pmRNSHolding(s) in Company
2nd Mar 20265:30 pmRNSHolding(s) in Company
2nd Mar 20263:51 pmRNSTotal Voting Rights
2nd Mar 20267:00 amRNSTungsten Exploration Plan & Investor Presentation
24th Feb 20267:01 amRNSHolding(s) in Company
24th Feb 20267:00 amRNSHolding(s) in Company
18th Feb 202612:03 pmRNSTotal Voting Rights
18th Feb 202612:00 pmRNSHolding(s) in Company
18th Feb 202612:00 pmRNSHolding(s) in Company
30th Jan 20267:00 amRNS£3.25m Placing to Accelerate Exploration Portfolio
29th Jan 20267:00 amRNSTungsten Mineralisation Confirmed at Defender
28th Jan 20267:00 amRNSIP Survey & RC Drilling Results at Rhyolite Dome
22nd Jan 20267:00 amRNSAu-Ag-Cu Mineralisation Confirmed at West Huntoon
12th Jan 20267:00 amRNSAppointment of Chief Executive Officer
5th Jan 20267:00 amRNSTungsten Exploration Update
18th Nov 20257:00 amRNSQ4 Exploration Programme Overview
3rd Nov 202512:10 pmRNSTotal Voting Rights
27th Oct 20257:00 amRNSHuntoon Copper Project Update
21st Oct 20257:00 amRNSDrilling Update
17th Oct 20252:15 pmRNSEXERCISE OF WARRANTS AND ISSUE OF EQUITY
6th Oct 20257:00 amRNSDrilling Underway at West Huntoon
29th Sep 20257:00 amRNSExploration Update
25th Sep 20257:00 amRNSHalf-year Report
16th Sep 20257:00 amRNS-RNew Corporate Presentation
15th Sep 20259:20 amRNSHolding(s) in Company
3rd Sep 20251:45 pmRNSHolding(s) in Company
1st Sep 202511:52 amRNSHolding(s) in Company
1st Sep 20257:00 amRNSExploration Update
29th Aug 202510:10 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.