Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGeorgina Energy Regulatory News (GEX)

Share Price Information for Georgina Energy (GEX)

Share Price is delayed by 15 minutes
Get Live Data
6.10    0.10 (1.67%)
Bid:
5.90
Ask:
6.30
Spread: 0.40 (6.78%)
Market Cap: £11.45m
GEX Live PriceLast checked at - London Stock Exchange

Intraday Georgina Energy Share Chart

Drilling Update

1 Aug 2006 14:19

Glencar Mining PLC01 August 2006 GLENCAR MINING PLC Results of first pass drilling programme at Sanankoro Target, Mali 1 August 2006 Glencar Mining plc ("Glencar" or the "Company") is pleased to announce theresults of a first pass, reverse circulation drilling programme at the Sanankorotarget, in the Bokoro concession in southern Mali. Borehole BKRC007 returnedan intersection of 21 metres grading 1.12 grams per tonne gold between 16 and 37metres downhole depth. The Bokoro concession is one of three concessions being explored under the termsof a Framework Agreement between subsidiaries of Glencar and Gold FieldsLimited, one of the world's major gold producers. Under the terms of theFramework Agreement, the Gold Fields subsidiary may spend up to US$12 million onexploration over three concession areas in southern Mali, in order to earn a 65%interest in the concessions. Reverse circulation drilling at Sanankoro commenced on 26 May 2006 and wascompleted on the 9 June 2006. Thirty five inclined holes at a nominal azimuth of135degrees were drilled for a total of 2,723 metres. The holes were drilledalong five northwest - southeast orientated fencelines. The minimum downholedepth was 66 metres and the maximum downhole depth was 120 metres. The drillingtested an interpreted structural contact where local artisanal mining activityhad shown the presence of high grade gold associated with quartz veining inaltered porphyry and metasedimentary rocks. Geophysical interpretation ofairborne magnetometry had indicated a strong structural zone associated withextensive potassic alteration zones, which often define gold bearing structures.Some 2.4 kilometres to the northwest of the drilled area, there exists veryextensive artisanal alluvial workings which have yielded abundant grains ofcoarse gold, apparently of local origin. The drilling programme intersected mineralised, altered porphyry in the vicinityof the hard rock artisanal workings. The best intersection was 21 metresgrading 1.12 grams per tonne gold in BKRC007, which shows the potentiallyextensive nature of the mineralised lithologies. The mineralizationintersected is encouraging for a first pass drill programme, and it is nowbelieved that further work will be required to establish the hardrock source ofthe alluvial gold to the northwest. The Sanankoro target is one of a number of targets which it is planned to drillunder the terms of the Framework Agreement with the Gold Fields subsidiary. Aswell as follow up drilling on the Sanankoro target, it is planned to drill atleast two additional targets, one on each of the Farasaba and Sanioumaleconcessions, during the coming field season. Glencar will also be conducting extensive drilling programmes on its 95% ownedKomana West prospect where significant high grade gold intersections havealready been made in two drilling programmes completed in 2006. Grades of 55.19grams per tonne (uncut) over 20 metres and 11 metres at 41.84 grams per tonne(uncut) were reported from these programmes and there is considerable potentialfor extension to the strike and depth extent of the known deposit. Theobjective of the forthcoming drill programmes will be to prove up the goldresource within the prospect. Hugh McCullough, EurGeol., PGeo, Managing Director of Glencar, is a member ofthe Institute of Geologists of Ireland. He is a qualified person as defined inthe Guidance Note for Mining, Oil and Gas Companies, March 2006, of the LondonStock Exchange. He has reviewed and approved the technical informationcontained in this announcement. For further information, please contact: Glencar Mining plcHugh McCullough, Managing DirectorTel: +353 1 661 9974e-mail: info@glencarmining.ie Heneghan PRRachel WatchornTel: +353 1 6607395e-mail: rachel@hpr.ie This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 202610:28 amRNSRepayment of Debt
2nd Jun 20267:00 amRNSIssue of Equity
1st Jun 202610:49 amRNSCompletion of £1 Million Fundraise
29th May 20269:03 amRNSAudited Final Results for Year Ended 31 Jan 2026
27th May 20264:42 pmRNSExercise of Warrants
26th May 20267:00 amRNSHussar EP513 Pre-Drill Works
22nd May 20268:16 amRNSIssue of Equity
20th May 20267:00 amRNSHussar EP513 Drill Contract Executed
6th May 202610:27 amRNSTermination of share purchase agreement
1st May 20267:04 amRNSCompletion of £1 Million Fundraise
28th Apr 202611:17 amRNSIssue of Equity
20th Apr 202611:59 amRNSResults of General Meeting
16th Apr 20269:48 amRNSHussar EP513 Drill Contract
27th Mar 20267:10 amRNSNet Asset Value(s)
25th Mar 20265:07 pmRNSPosting of Circular and Notice of AGM
13th Mar 20267:10 amRNSNet Asset Value(s)
12th Mar 20267:00 amRNSHussar EP513 Drill Contract Update
10th Mar 20267:10 amRNSNet Asset Value(s)
4th Mar 20267:00 amRNSHussar EP513 Drill Preparations Update
24th Feb 20267:00 amRNSMt Winter EPA 155 ALRA RECEIVED
17th Feb 20267:00 amRNSHussar EP513 Site Inspection
13th Feb 20267:30 amRNS-RBroker Research Initiation
5th Feb 20267:00 amRNSHussar EP513 Drill Operations Site Inspection
30th Jan 202611:16 amRNSDebt Drawdown of £500,000
29th Jan 20261:17 pmRNSHolding(s) in Company
26th Jan 20267:00 amRNSHussar EP513 Drilling/Funding
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
9th Dec 20257:00 amRNSOperational Update
20th Nov 20257:16 amRNSExpression of Interest to Fund Hussar EP513
14th Nov 20257:00 amRNSReplacement: Placing and Debt Facility
11th Nov 202510:00 amRNSACQUISITION OF ADDITIONAL RE-ENTRY TARGETS
4th Nov 20259:23 amRNSPlacing and Debt Facility
31st Oct 20257:47 amRNSHussar EP513 Drilling Approval
30th Oct 202511:20 amRNSHussar EP513 Drilling Approval Obtained
27th Oct 20257:33 amRNSInterim Results
22nd Oct 202510:52 amRNSHussar EP513 Environmental Plan APPROVAL
28th Aug 202510:53 amRNS£1m Fundraise to Advance Hussar & Mt Winter
28th Aug 20257:44 amRNSOFF-TAKE MOU EXECUTED AND PERMIT UPDATE
26th Aug 20257:01 amRNSOFFTAKE PROPOSAL & Helium-3 POTENTIAL
19th Aug 20257:00 amRNSMt Winter EPA 155 Update
18th Aug 20257:00 amRNSHussar EP513 Drilling Approval Update
6th Aug 20251:07 pmRNSResult of AGM
14th Jul 20257:00 amRNSHussar EP513 WELL MANAGEMENT PLAN APPROVAL
10th Jul 20257:00 amRNSRevised Resource Upgrade of 37.8% EPA155 Mt Winter
8th Jul 20257:00 amRNSMt Winter EPA 155 Update
7th Jul 20258:30 amRNSNotice of Annual General Meeting
7th Jul 20257:00 amRNSHussar EP513 Update
4th Jul 20254:00 pmRNSRestoration of Trading
30th Jun 20257:00 amRNS2025 Audited Final Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.