Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGreka Drilling Regulatory News (GDL)

  • There is currently no data for GDL

Operational update/Interim results date

29 Aug 2012 10:00

RNS Number : 9830K
Greka Drilling Limited
29 August 2012
 



 

29 August 2012

Greka Drilling Limited

("Greka Drilling" or "the Company")

 

Operational Highlights - 119% increase in Meters Drilled year-on-year

Interim Results to be announced on 3 September 2012

 

Greka Drilling Limited (AIM: GDL), the largest independent and specialised unconventional gas driller in China, is pleased to announce that its interim results will be released on 3 September 2012.

 

OPERATIONAL HIGHLIGHTS

 

·; 57,997 meters drilled in H1 2012 compared with 26,435 meters drilled in the same period last year, an increase of 119% year-on-year

·; LiFaBriC wells averaged 3,897 total meters in H1 2012 compared with 3,691 total meters during the same period year-on-year (H1 2011), a 6% increase

·; The longest LiFaBriC lateral section was 5,454 meters in H1 2012 (5,297 meters in H1 2011), a 3% increase

·; The longest measured depth ("MD") of a single LiFaBriC section, surface to intersect, was 1,809 meters in H1 2012 (1,668 meters in H1 2011), an 8% increase

·; The longest total vertical depth ("TVD") of a single vertical well was 1,414 meters in H1 2012 (1,233 meters in H1 2011), a 15% increase

 

CORPORATE HIGHLIGHTS

 

·; All new rigs have now arrived at our Shanxi Base Camp as planned , increasing the fleet from 7 rigs to 32 rigs, with ISO 9001 certification on all 25 new GD75 rigs being attained

·; The Company has completed the commissioning and integration of what is currently the single largest fleet of Electromagnetic MWD (Measurement While Drilling) tools available within the People's Republic of China ("PRC")

·; The first of the new fleet of rigs was fitted with equipment that allowed the rig to be monitored remotely via the Supervised Control and Data Acquisition system (SCADA) from a centralized Zhengzhou control facility. This control system will be added to all the other rigs in the fleet

·; Company personnel increased to 715 at end of H1 2012 versus 520 in December 2011 (325 at end of H1 2011), a 38 % increase

·; 639 personnel received internal training for a total of 73,684 man hours in H1 2012

·; In line with improving overall efficiency and reacting to operational events, the Operational Control Centre ("OCC") saw the creation of positions for both Well Planning/Modeling and Production Planning Engineers. These positions give a 24/7 coverage of our operations, providing decisions into the field within 1-2 hours from up to 8 hours historically

·; Construction of the Shanxi Base Camp was completed in H1 2012 with a total on-site resident headcount of over 450 personnel. The Company website provides photographs of the site which is the first of its kind in China

 

The Company is pleased to report that the first phase of the rig fleet expansion plan is now complete. The first phase involved design, construct and commission of a rig fleet of 25 rigs. These rigs, purpose built for unconventional gas development, were co-designed with the manufacturer, made in China and the first of its kind imported in to China being successfully commissioned. This entire business plan was conceived and executed within a year, an important milestone.

The Company, which prides itself in technological firsts, believes it has one of the largest directional drilling teams in China of any independent driller. In coping with the geological difficulties that exist in unconventional gas production, the Company looks forward to providing third parties with the necessary skill sets to optimise drilling and will update the market as and when appropriate.

Today the Company is able to drill at greater depths and geo-steer more precisely with increased well lengths to over 1,800 meters. In addition to this, the Company is now drilling vertical wells targeting unconventional gas reservoirs at depths of over 1,400 meters.

Randeep Grewal, Chairman and Chief Executive of Greka Drilling, commented:

"I am delighted to report that we have grown the business on time and within plan. In this half year we have completed our first phase of rig fleet growth by adding the 25 specialized rigs in which we were instrumental in their configuration and design. We have significantly increased senior management capability from multiple disciplines both within China and from the wider region with skills specific to the drilling services industry. We have enhanced the day-to-day operating structure of the Company and introduced technology that allows the business to reap the benefits of scale. While we have had several clients engage us with an interest in our capabilities, we have so far been focused on getting the fleet and personnel induction phase completed to make sure we are prepared for the next phase of our continued growth. We are now prepared to accept third party contracts and increase the clientele of the business."

 

For further information on Greka Drilling, please refer to the website at www.grekadrilling.com or contact:

Stephen Hill, VP Corporate Communications

Greka Drilling Limited

+852 3710 0108

Dr Azhic Basirov / David Jones

Nomad & Broker

Smith & Williamson

+44 20 7131 4000

Paul Connolly / John Dwyer / Steve Baldwin

Broker

Macquarie Capital (Europe) Limited

+44 20 3037 2000

James Henderson / Nick Lambert / Rollo Crichton-Stuart

 

Investor relations

 

Pelham Bell Pottinger

+44 20 7861 3232

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDMGZRRLRGZZG
Date   Source Headline
30th Sep 20134:35 pmRNSPrice Monitoring Extension
30th Sep 201312:28 pmRNSHalf Yearly Report
17th Sep 20134:40 pmRNSSecond Price Monitoring Extn
17th Sep 20134:35 pmRNSPrice Monitoring Extension
16th Sep 20134:35 pmRNSPrice Monitoring Extension
9th Sep 20134:35 pmRNSPrice Monitoring Extension
3rd Sep 20134:40 pmRNSSecond Price Monitoring Extn
3rd Sep 20134:35 pmRNSPrice Monitoring Extension
29th Aug 20137:00 amRNSOperations Update
19th Jul 20138:32 amRNSOperations Update
16th Jul 20131:29 pmRNSResult of AGM
26th Jun 201310:35 amRNSAnnual Report and Notice of Annual General Meeting
20th Jun 20137:00 amRNSFurther CNPC Contract
4th Jun 20134:35 pmRNSPrice Monitoring Extension
29th May 20134:40 pmRNSSecond Price Monitoring Extn
29th May 20134:35 pmRNSPrice Monitoring Extension
28th May 20133:00 pmRNSHolding(s) in Company
9th May 20137:00 amRNSMain Board Listing
18th Apr 20137:00 amRNSWell Completion
16th Apr 20134:35 pmRNSPrice Monitoring Extension
12th Mar 20137:11 amRNSFinal Results
7th Mar 20139:03 amRNSNotice of Results
5th Feb 20134:35 pmRNSPrice Monitoring Extension
30th Jan 20137:00 amRNS2012 Operational Review
3rd Jan 20135:05 pmRNSHolding(s) in Company
28th Dec 201212:00 pmRNSGreka Drilling signs drilling contract with CNPC
11th Dec 20127:00 amRNSThird party contract
12th Sep 201210:05 amRNSGreka Drilling enhances LiFaBriC
3rd Sep 20129:41 amRNSHalf Yearly Report
29th Aug 201210:00 amRNSOperational update/Interim results date
29th Aug 20127:00 amRNSShare Price Movement
12th Jul 20124:12 pmRNSResult of AGM
20th Jun 201210:29 amRNSAnnual Report & Notice of AGM
10th Apr 20127:00 amRNSFinal Results
1st Feb 20124:40 pmRNSSecond Price Monitoring Extn
1st Feb 20124:35 pmRNSPrice Monitoring Extension
26th Jan 20129:46 amRNSHolding(s) in Company
22nd Nov 20117:00 amRNSDrilling Rig Fleet Growth Update
7th Oct 20114:40 pmRNSSecond Price Monitoring Extn
7th Oct 20114:35 pmRNSPrice Monitoring Extension
7th Sep 20117:00 amRNSHalf Yearly Report
19th Jul 20114:37 pmRNSPrice Monitoring Extension
28th Jun 20119:34 amRNSFirst of 25 Rigs Accepted on Schedule
9th May 20114:40 pmRNSSecond Price Monitoring Extn
9th May 20114:35 pmRNSPrice Monitoring Extension
5th Apr 20117:00 amRNSDrilling Rig Order

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.