Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGreka Drilling Regulatory News (GDL)

  • There is currently no data for GDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Rig Order

5 Apr 2011 07:00

RNS Number : 2899E
Greka Drilling Limited
05 April 2011
 



 

5 April 2011

Greka Drilling Limited

("Greka Drilling" or "the Company")

 

Greka Drilling orders 25 specialised CBM drilling rigs with 125 on option

Greka Drilling Limited (AIM: GDL), the largest independent and specialised unconventional gas driller in China, announces the order of 25 specialised Coal Bed Methane ("CBM") drilling rigs with an additional 125 on option. This will increase the Greka Drilling fleet from seven to thirty-two rigs.

Greka has entered into a contractual agreement with Drillmec, a wholly owned subsidiary of the Trevi Group (BIT:TFI) for the construction and delivery of the rigs. The first rig will be ready for shipment in July and is expected to be commissioned on site in September, followed by an additional four rigs every month from November until the initial order of twenty-five is complete. Once the deliveries begin, one rig is to be commissioned per week until completion of the current confirmed order. The purchase price for the initial 25 rigs is US$39.25 million (excluding ancillary equipment).  The contract contains an option for an additional 125 rigs and provides the flexibility to order larger capacity rigs at the discretion of Greka Drilling. The option is contracted on the same terms as the initial order, adjusted for inflation.

All of the new drilling rigs will be dedicated to production drilling at Shizhuang South (GSS) in Shanxi Province, China, through a recently awarded contract from Green Dragon Gas (AIM:GDG) to drill in excess of 100 wells (vertical and horizontal) in the initial phase.

Greka Drilling will enhance the capability of its existing Schramm rigs currently configured to drill vertical wells to SIS which will take the current number of rigs drilling SIS wells by yearend to 16, accounting for some of the new deliveries. Conversion of the existing Schramm rigs is expected to be completed by July. The Company will outsource some of its contracted simpler vertical wells to third party contractors so as to complete the targeted SIS wells by yearend. It is expected that following the delivery of the new Drillmec rigs which will be dedicated to production drilling at GSS, the current Schramm rigs will move to exploration drilling in the other blocks operated by Green Dragon and other potential customers throughout China.

The focus on production drilling will also enable Greka Drilling to increase profitability via improved rig utilisation rates. The production drilling process is substantially quicker than exploration drilling, where the Company's drilling fleet is dedicated to drilling in several unique locations collecting geological data and sub-surface knowledge. The improved efficiencies in production drilling come from lower average drilling and mobilisation/demobilisation times and economies of scale derived from all of the rigs operating in the same area with a common drilling objective. The production drilling fleet is to be controlled via digital feeds to the Company's central SCADA operation control centre in Zhengzhou, where the skilled supervision team controls the execution and performance.

Greka Drilling has a significant first mover advantage in the application of specialist Surface to Inseam (SIS) horizontal drilling methodology in the exploitation of CBM in China. Greka has developed its SIS methodology through continuous SIS drilling since March 2008.

Randeep Grewal, Chairman and Chief Executive of Greka Drilling Ltd, commented:

"We are delighted to have concluded this vital decision and contract. Our selection process has been rigorous and the final contract awarded is testament to the strict standards and demands by which we have modelled our exponentially growing business. Greka Drilling worked very closely with Drillmec to design the rigs to a unique specification which met our particular needs rather than acquiring a generic design which will provide the maximum efficiency in capital deployed and operational functionality in the field. We have been pleased with the flexibility demonstrated by Drillmec through the process to date and look forward to a long term mutually rewarding relationship with the Trevi Group.

Importantly the new fleet has characteristics that are totally new to China and which will pioneer the approach to drilling CBM wells. Currently Greka Drilling's existing fleet drills to measured depths of 1500 meters with crews of five. The new Drillmec fleet with the available options can take us to measured depths of 5000 meters with crews of two in a fully automated and centrally controlled fleet. This will allow us to drill for customers focused on unconventional gas including CBM and shale. The acquisition of these advanced next generation rigs will also increase utilisation rates significantly for the Company, enhancing efficiency. It will also enable Greka to continue to play a core role in China's strategy to explore and exploit its large market needed unconventional gas resources in full."

 

 

For further information on Greka Drilling, please refer to the website at www.grekadrilling.com or contact:

 

Stephen Hill, VP Corporate Communications

Greka Drilling Limited

+852 3710 0108

Dr Azhic Basirov / David Jones

Nomad & Broker

Smith & Williamson

+44 20 7131 4000

Tim Redfern / Anu Tayal

Broker

Evolution Securities

+44 20 7071 4312

Paul Connolly / John Dwyer / Steve Baldwin

Broker

Macquarie Capital (Europe) Limited

+44 20 3037 2000

James Henderson / Nick Lambert / Rollo Crichton-Stuart

 

Investor relations

 

Pelham Bell Pottinger

+44 20 7861 3232

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBGDSSSGBGBS
Date   Source Headline
25th Oct 20185:30 pmRNSGreka Drilling
19th Oct 20189:28 amRNSHolding(s) in Company
17th Oct 201812:05 pmRNSResult of EGM
15th Oct 20186:27 pmRNSHolding(s) in Company
1st Oct 20183:56 pmRNSProposed delisting and EGM
27th Sep 20181:50 pmRNSHalf-year Report
31st Jul 20188:33 amRNSResult of AGM
9th Jul 20187:30 amRNSRestoration - Greka Drilling Ltd
9th Jul 20187:00 amRNSPosting of Annual Report
6th Jul 20183:47 pmRNSFinal Results
2nd Jul 201812:00 pmRNSStatement re. Suspension
2nd Jul 20187:30 amRNSSuspension - Greka Drilling Limited
15th Jun 201812:07 pmRNSSecond Price Monitoring Extn
15th Jun 201812:02 pmRNSPrice Monitoring Extension
13th Jun 20184:40 pmRNSSecond Price Monitoring Extn
13th Jun 20184:35 pmRNSPrice Monitoring Extension
24th May 20187:00 amRNSOperations Update
29th Jan 20187:00 amRNSOperations Results 2017
21st Dec 20174:33 pmRNSContracts Update
16th Nov 20178:26 amRNSONGC Contract Execution
1st Nov 201711:31 amRNSResult of AGM
24th Oct 20177:00 amRNSContract Awards and Directorate Changes
11th Oct 20174:24 pmRNSNotice of AGM
27th Sep 20177:00 amRNSHalf-year Report
16th Aug 20177:00 amRNSNew Contract Wins
29th Jun 201711:50 amRNSAnnual Financial Report
16th Jun 20177:00 amRNSONGC issues LOA to Greka Drilling
2nd Jun 20177:00 amRNSDebt Facility
5th May 20174:40 pmRNSSecond Price Monitoring Extn
5th May 20174:35 pmRNSPrice Monitoring Extension
28th Apr 20177:00 amRNSFinal Results
6th Apr 20177:00 amRNSGreka Declared Winner of ONGC Contract
28th Feb 20177:00 amRNS50th Well Completed in India
6th Feb 20174:40 pmRNSSecond Price Monitoring Extn
6th Feb 20174:35 pmRNSPrice Monitoring Extension
18th Jan 201712:01 pmRNSOperations Update
30th Nov 20169:35 amRNSPetroChina Drilling Contract Award
27th Sep 20167:00 amRNSHalf-year Report
21st Sep 201611:28 amRNSDebt Financing
26th Jul 20163:07 pmRNSResult of AGM
26th Jul 20167:00 amRNSOperations Update
30th Jun 20169:03 amRNSNotice of AGM
16th Jun 20164:35 pmRNSPrice Monitoring Extension
8th Jun 20167:00 amRNSIndia Drilling Update
26th Apr 20164:35 pmRNSPrice Monitoring Extension
21st Apr 20167:00 amRNSFinal Results
20th Apr 201610:26 amRNSMobilisation of Rigs in India
19th Apr 20165:52 pmRNSNotice of Results
31st Mar 20167:00 amRNSDebt Financing
1st Mar 20167:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.