Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

13 Jun 2013 07:00

RNS Number : 9347G
Exillon Energy Plc
13 June 2013
 



Exillon Energy plc

Drilling Update

13 June 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

EWS I - 70

Well EWS I - 70 was drilled on the northern extension of the East EWS I field. The well was spudded on the 4th May 2013 and drilled and cemented in 13 days. The well encountered the Jurassic P reservoir at 1,871 metres, confirming 17.8 metres of effective vertical net oil pay.

The well flowed oil naturally to the surface with a flow rate of 499 bbl/day on an 8 mm choke. The well was drilled vertically from Pad 7, and is now connected to our existing production facilities.

 

EWS I - 64

Well EWS I - 64 was drilled on the north-west extension of the EWS I field. The well was spudded on the 1st February 2013 and drilled and cemented in 29 days. The well encountered the Jurassic P reservoir at 1,862 metres, confirming 2.7 metres of effective vertical net oil pay.

Upon perforation the well flowed 220 bbl/day, of which 44 bbl/day was oil. The well was drilled 1.1 km to the north-west of Pad 6. Due to the fact that the well is located lower than any other well on the structure it has been converted to water injection for the purposes of maintaining reservoir pressure.

 

EWS I - 65

Well EWS I - 65 was drilled on the north-west extension of the EWS I field. The well was spudded on the 3rd March 2013 and drilled and cemented in 25 days. The well encountered the Jurassic P reservoir at 1,858 metres, confirming 8.6 metres of effective vertical net oil pay and 14.2 metres of net pay along the well bore.

The well is currently operated with a submersible pump flowing at 156 bbl/day, of which 85 bbl/day is oil. Going forward we will seek to minimize water cut in the production from this well. The well was drilled 1.6 km to the north-west of Pad 6, and is now connected to our existing production facilities.

 

EWS I - 66

Well EWS I - 66 was drilled on the north-west extension of the EWS I field. The well was spudded on the 30th March 2013 and drilled and cemented in 14 days. The well encountered the Jurassic P reservoir at 1,852 metres, confirming 10.5 metres of effective vertical net oil pay and 18.2 metres of net pay along the well bore.

The well is currently operated with a submersible pump flowing at 574 bbl/day, of which 551 bbl/day is oil. The well was drilled 1.0 km to the north-east of Pad 6, and is now connected to our existing production facilities. Well 6 is the last planned well from Pad 6. 

Appraisal well EWS I - 90

Appraisal well EWS I - 90 was designed to test the north-east extension of the EWS I field. The structure was previously tested with well EWS I - 61, but due to a long deviation of well EWS I - 61, the structure was not tested for flow rates.

The well was spudded on the 13th April 2013 and drilled and cemented in 34 days. 18.4 metres of core was collected, which is represented by mudstones, gravel conglomerates, and sandstones. The core exhibits signs of hydrocarbon saturation. During a test the well has produced only a film of oil due to low permeability of the producing horizon.

We will assess the core data for methods of producing from this reservoir. Two additional wells have been previously planned for drilling in this part of the field in 2013. No further drilling will be completed in this area of the field prior to the completion of petrophysical studies.

The well was drilled 0.7 km to the south-east of Pad 9, and has been converted to a water source well.

 

EWS I - 201

Well EWS I - 201 was drilled on the northern part of East EWS I field. The well was spudded on the 8th April 2013 and drilled and cemented in 25 days. The well encountered the Jurassic P reservoir at 1,872 metres, confirming 13 metres of effective vertical net oil pay.

The well is currently operated with a submersible pump flowing oil at 146 bbl/day. The well was drilled 1.7 km north of Pad 7, and is now connected to our existing production facilities.

 

Media contact:

Tom Blackwell

020 7920 2300

Blackwell@mcomgroup.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFSEFEFDSEEM
Date   Source Headline
18th Jul 20184:35 pmRNSPrice Monitoring Extension
27th Jun 20183:15 pmRNS2018 AGM Results
26th Jun 20187:00 amRNSMay Production Report
26th Jun 20187:00 amRNSReport on Payments to Governments for 2017
29th May 20184:04 pmRNS2018 Annual General Meeting
24th May 20187:00 amRNSApril Production Report
23rd May 20181:43 pmRNSAppointment of new CEO
26th Apr 20183:20 pmRNS2017 Annual Report and Accounts
24th Apr 20187:00 amRNSMarch Production Report
3rd Apr 20187:00 amRNSFebruary Production Report
27th Feb 20187:00 amRNSJanuary Production Report
24th Jan 20185:03 pmRNSResolution of Management Board of WSE
16th Jan 20187:00 amRNSDecember Production Report
10th Jan 20187:00 amRNSApproval for delisting of Exillon shares from WSE
28th Dec 20177:01 amRNSNovember Production Report
15th Nov 20177:00 amRNSOctober Production Report
10th Oct 20177:00 amRNSSeptember Production Report
11th Sep 201711:48 amRNSTender Offer Results
11th Sep 20177:00 amRNSAugust Production Report
8th Sep 201712:07 pmRNSSecond Price Monitoring Extn
8th Sep 201712:02 pmRNSPrice Monitoring Extension
1st Sep 20172:32 pmRNSInterim results for the first six months of 2017
30th Aug 201712:46 pmRNS2017 EGM Results
15th Aug 20177:00 amRNSJuly Production Report
14th Aug 20173:02 pmRNS2017 Extraordinary General Meeting
9th Aug 20173:44 pmRNSRe. BoD resolution on delisting from WSE
19th Jul 20177:00 amRNSStatement on Bank Ugra
14th Jul 20176:19 pmRNSRe. Tender Offer for Exillon shares listed on WSE
11th Jul 20174:40 pmRNSSecond Price Monitoring Extn
11th Jul 20174:35 pmRNSPrice Monitoring Extension
7th Jul 20177:00 amRNSJune Production Report
26th Jun 20171:05 pmRNS2017 AGM Results
20th Jun 20177:00 amRNSMay Production Report
25th May 20171:05 pmRNSReport on Payments to Governments for 2016
24th May 20175:46 pmRNS2017 Annual General Meeting
12th May 20177:00 amRNSApril Production Report
26th Apr 20174:03 pmRNS2016 Annual Report and Accounts
11th Apr 20173:15 pmRNSLoan Facilities
11th Apr 20177:00 amRNSMarch Production Report
14th Mar 20177:00 amRNSFebruary Production Report
9th Feb 20177:00 amRNSJanuary Production Report
24th Jan 20177:00 amRNSDecember Production Report
6th Dec 20167:00 amRNSNovember Production Report
25th Nov 20167:00 amRNSOctober Production Report
14th Oct 20167:00 amRNSSeptember Production Report
9th Sep 20167:00 amRNSAugust Production Report
25th Aug 20163:12 pmRNSInterim results for the first six months of 2016
24th Aug 20167:00 amRNSJuly Production Report
6th Jul 20167:00 amRNSJune Production Report
30th Jun 20167:00 amRNSConsolidated report on payments to governments