Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEXI.L Regulatory News (EXI)

  • There is currently no data for EXI

Drilling Update

13 Jun 2013 07:00

RNS Number : 9347G
Exillon Energy Plc
13 June 2013
 



Exillon Energy plc

Drilling Update

13 June 2013 - Exillon Energy plc, a London Premium listed independent oil producer with assets in two oil-rich regions of Russia, Timan-Pechora ("Exillon TP") and West Siberia ("Exillon WS"), is pleased to announce a drilling update.

EWS I - 70

Well EWS I - 70 was drilled on the northern extension of the East EWS I field. The well was spudded on the 4th May 2013 and drilled and cemented in 13 days. The well encountered the Jurassic P reservoir at 1,871 metres, confirming 17.8 metres of effective vertical net oil pay.

The well flowed oil naturally to the surface with a flow rate of 499 bbl/day on an 8 mm choke. The well was drilled vertically from Pad 7, and is now connected to our existing production facilities.

 

EWS I - 64

Well EWS I - 64 was drilled on the north-west extension of the EWS I field. The well was spudded on the 1st February 2013 and drilled and cemented in 29 days. The well encountered the Jurassic P reservoir at 1,862 metres, confirming 2.7 metres of effective vertical net oil pay.

Upon perforation the well flowed 220 bbl/day, of which 44 bbl/day was oil. The well was drilled 1.1 km to the north-west of Pad 6. Due to the fact that the well is located lower than any other well on the structure it has been converted to water injection for the purposes of maintaining reservoir pressure.

 

EWS I - 65

Well EWS I - 65 was drilled on the north-west extension of the EWS I field. The well was spudded on the 3rd March 2013 and drilled and cemented in 25 days. The well encountered the Jurassic P reservoir at 1,858 metres, confirming 8.6 metres of effective vertical net oil pay and 14.2 metres of net pay along the well bore.

The well is currently operated with a submersible pump flowing at 156 bbl/day, of which 85 bbl/day is oil. Going forward we will seek to minimize water cut in the production from this well. The well was drilled 1.6 km to the north-west of Pad 6, and is now connected to our existing production facilities.

 

EWS I - 66

Well EWS I - 66 was drilled on the north-west extension of the EWS I field. The well was spudded on the 30th March 2013 and drilled and cemented in 14 days. The well encountered the Jurassic P reservoir at 1,852 metres, confirming 10.5 metres of effective vertical net oil pay and 18.2 metres of net pay along the well bore.

The well is currently operated with a submersible pump flowing at 574 bbl/day, of which 551 bbl/day is oil. The well was drilled 1.0 km to the north-east of Pad 6, and is now connected to our existing production facilities. Well 6 is the last planned well from Pad 6. 

Appraisal well EWS I - 90

Appraisal well EWS I - 90 was designed to test the north-east extension of the EWS I field. The structure was previously tested with well EWS I - 61, but due to a long deviation of well EWS I - 61, the structure was not tested for flow rates.

The well was spudded on the 13th April 2013 and drilled and cemented in 34 days. 18.4 metres of core was collected, which is represented by mudstones, gravel conglomerates, and sandstones. The core exhibits signs of hydrocarbon saturation. During a test the well has produced only a film of oil due to low permeability of the producing horizon.

We will assess the core data for methods of producing from this reservoir. Two additional wells have been previously planned for drilling in this part of the field in 2013. No further drilling will be completed in this area of the field prior to the completion of petrophysical studies.

The well was drilled 0.7 km to the south-east of Pad 9, and has been converted to a water source well.

 

EWS I - 201

Well EWS I - 201 was drilled on the northern part of East EWS I field. The well was spudded on the 8th April 2013 and drilled and cemented in 25 days. The well encountered the Jurassic P reservoir at 1,872 metres, confirming 13 metres of effective vertical net oil pay.

The well is currently operated with a submersible pump flowing oil at 146 bbl/day. The well was drilled 1.7 km north of Pad 7, and is now connected to our existing production facilities.

 

Media contact:

Tom Blackwell

020 7920 2300

Blackwell@mcomgroup.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFSEFEFDSEEM
Date   Source Headline
20th Nov 20209:01 amRNS2020 Annual General Meeting
19th Nov 20207:30 amRNSShares of Exillon to be traded at J P Jenkins Ltd.
18th Nov 202012:00 pmRNSNOTICE OF INTENTION TO CANCEL LISTING ON LSE
18th Nov 202012:00 pmRNSEGM Results
18th Nov 202011:00 amRNSAppointment of Alternate Director
16th Oct 202010:55 amRNSEGM notification and intended listing cancellation
8th Jul 20207:00 amRNSUpdate on Delisting from the London Stock Exchange
18th Jun 20207:00 amRNSReport on Payments to Governments for 2019
28th Apr 20207:00 amRNSMarch Production Report
27th Apr 20207:00 amRNSFebruary Production Report
4th Mar 20207:00 amRNSJanuary Production Report
14th Feb 20201:10 pmRNSUpdate on cancellation of listing of shares
28th Jan 20207:00 amRNSDecember Production Report
24th Dec 20197:00 amRNSNovember Production Report
12th Nov 20197:00 amRNSOctober Production Report
31st Oct 201911:45 amRNSNotice of Intention to Delist from the LSE
15th Oct 20197:00 amRNSSeptember Production Report
10th Sep 20197:00 amRNSAugust Production Report
30th Aug 20197:00 amRNSAnnouncement of Exillon Energy plc
14th Aug 20197:00 amRNSJuly Production Report
24th Jul 20197:00 amRNSJune Production Report
28th Jun 20191:18 pmRNSAnnouncement of Exillon Energy plc
25th Jun 20191:26 pmRNSAGM Results
25th Jun 20197:00 amRNSMay Production Report
24th May 20195:01 pmRNS2019 Annual General Meeting
21st May 20197:00 amRNSReport on Payments to Governments for 2018
9th May 20197:00 amRNSApril Production Report
1st May 20197:45 amRNSSuspension of share listing
1st May 20197:30 amRNSSuspension Exillon Energy Plc
29th Apr 20197:00 amRNSMarch Production Report
26th Apr 201912:47 pmRNSAnnouncement of Exillon Energy plc
26th Mar 20197:00 amRNSFebruary Production Report
26th Feb 20197:00 amRNSJanuary Production Report
24th Jan 20197:00 amRNSDecember Production Report
27th Dec 20187:00 amRNSNovember Production Report
20th Dec 20184:43 pmRNSNotification of class 2 transaction
14th Dec 201812:07 pmRNSSecond Price Monitoring Extn
14th Dec 201812:02 pmRNSPrice Monitoring Extension
30th Nov 20182:20 pmRNSOctober Production Report
26th Oct 20187:00 amRNSSeptember Production Report
24th Oct 20184:40 pmRNSSecond Price Monitoring Extn
24th Oct 20184:35 pmRNSPrice Monitoring Extension
28th Sep 20184:56 pmRNSInterim results for the first six months of 2018
28th Sep 20184:35 pmRNSPrice Monitoring Extension
25th Sep 20187:00 amRNSAugust Production Report
4th Sep 201812:00 pmRNSTR-1 notification
4th Sep 201812:00 pmRNSTR-1 notification
30th Aug 20187:00 amRNSJuly Production Report
25th Jul 20187:00 amRNSJune Production Report
18th Jul 20184:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.