The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Toral Lead-Zinc Project Update, Spain

28 Jul 2017 07:00

RNS Number : 3653M
Ferrum Crescent Ltd
28 July 2017
 

28 July 2017

Ferrum Crescent Limited

("FCR", the "Company" or the "Group")(ASX, AIM, JSE: FCR)

 

Update re Lead-Zinc Exploration Drill Programme, Toral Project, Spain

 

Highlights

 

· Drilling of 6 holes completed which have all returned visually-identified lead-zinc intersections from which samples are now being prepared and sent for assay in Spain.

· All drilling conducted was within 200 metres from surface and, due to the drilling occurring across various elevation levels on a hill, it has been possible to recover core at various levels within the structure.

· A revised structural thrust model whereby mineralisation is constrained within a series of thrusts and driven to surface from depth has been established with confirmation from the intersections encountered at each and every hole drilled.

· With the geological aims of the exploration drill programme having substantially been met, the programme has been deemed completed by the Board after hole 6 and has now been halted.

· The results from the ongoing assays will be analysed once received and entered into the revised structural model for Toral.

· Significant data set and analytics relating to the historic NI43-101 resources report now recovered from Micon International Ltd.

 

Planned next exploration phase

 

· Principal objective is now to relate the latest understanding of the thrust model to the significant amounts of new core and the assay results obtained from the drill programme.

· The analysis of the new core will facilitate a review of the core from the historic third party drill campaign with a view to assaying specific previously-untested sections of the historic core for shallow mineralisation.

· All the assays plus the historic data set will enable the swift development of the next phase of exploration in order to pursue specific project economic targets, to include the expansion of the resource.

· The drilling of 'long-holes' which is a previously untested approach designed to move through multiple shale/slate layers will also be assessed. The objective is to encapsulate the entire mineralised section in each hole by traversing the complete series of parallel, mineralised planes.

· Internal scoping and comparative studies commenced in July 2017 in order to support economic development planning towards a Pre-Feasibility Study.

 

 

FCR, the European lead-zinc explorer, announces an update in respect of its lead-zinc exploration drill programme at its 100%-owned Toral project, located in Leon Province, Spain. The near surface drilling campaign at the project, designed to determine the presence of near surface mineralisation, has, as of this week, returned core containing visible lead-zinc from every one of the 6 drill holes completed. Assays from these holes are now being prepared and sent to laboratories in Seville, Spain, with results currently anticipated within the next 6 weeks.

 

Consequently, the basic case for the new structural model recently developed by FCR, relating to faulting concentrating a thrust of mineralisation to surface, has now been sufficiently verified. Accordingly, the drill programme has been halted and the Company will await the assay results and input its findings into a new Toral model in order to plan the next stage of exploration.

 

The new drilling data combined with information recently transferred to FCR from Micon International Ltd., which was generated from historic work conducted by third parties on the asset, will be utilised together with the significant amounts of historic drilling data to develop the Company's understanding of the sub-surface structures.

 

In particular, FCR is seeking to determine the presence of overlapping planes of lead-zinc mineralisation caused by the combination of thrust/fault conditions. Multiple exploration options remain open including the drilling of 'long-holes' to attempt to pass through multiple shale layers all the way to the base wall in order to establish the series of mineralised planes.

 

Figure 1 (http://www.rns-pdf.londonstockexchange.com/rns/3653M_-2017-7-27.pdf) shows the 2017 Toral drill campaign area relative to historic intersections and Figure 2 (http://www.rns-pdf.londonstockexchange.com/rns/3653M_1-2017-7-27.pdf) shows selected photos from site taken during the campaign.

 

Cost and comparatives analysis

Further to the FCR geological team's oversight of the May-July 2017 drill programme, the Company has decided to commence a series of work streams as follows:

 

· Internal scoping study using recent comparative costs within Spain

· Formal lead-zinc comparators study with explorers and producers

· Chemical metallurgical review of the Toral ore separation characteristics

· Initial full analysis of the project's historic shallow core-sections held near Ponferrada, Leon, Spain

 

Commenting today, Justin Tooth, Executive Chairman of FCR, said:

 

"Our team has now visually identified from every hole of the drill campaign the existence of lead-zinc within 200 metres of surface and accordingly we have obtained sufficient data from the core to support the main tenets of the Company's new geological model for Toral. We shall now apply this new drilling data to the significant amount of historic information available on Toral, including the data recently obtained from Micon International as well as the core stored locally from the historic Lundin drill programme.

 

"There has been a large amount of historical drilling conducted at Toral which returned significant lead-zinc intersections, and we are now enhancing our understanding of the structure and definition of the deposit in a cost-effective manner. While the assays from the latest drill campaign are submitted and returned over the next six weeks, the Company has sufficient information in the meantime to progress with designing the next stages of further exploration at Toral and to examine economic comparators for a potential future lead-zinc mining operation. A key focus for our geological team is to assess the possibility of defining overlapping planes of lead-zinc mineralisation concentrated within the project area. I look forward to providing further updates on our progress in due course."

 

 

For further information on the Company, please visit www.ferrumcrescent.com or contact:

 

Ferrum Crescent Limited

Justin Tooth, Executive Chairman

Grant Button, Director and Company Secretary

T: +61 8 9474 2995

UK enquiries:

Laurence Read (UK representative)

T: +44 7557 672 432

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler

T: +44 (0)20 7409 3494

 

Beaufort Securities Limited (Broker)

Elliot Hance

T: +44 (0)20 7382 8300

 

Bravura Capital (Pty) Ltd (JSE Sponsor)

Melanie De NysschenT (direct): +27 11 459 5037

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRGDRIBDBGRR
Date   Source Headline
9th Aug 20197:00 amRNSFormal Stakeholder Engagement Process Initiated
8th Aug 20194:40 pmRNSSecond Price Monitoring Extn
8th Aug 20194:35 pmRNSPrice Monitoring Extension
8th Aug 20192:05 pmRNSSecond Price Monitoring Extn
8th Aug 20192:00 pmRNSPrice Monitoring Extension
8th Aug 201911:05 amRNSSecond Price Monitoring Extn
8th Aug 201911:00 amRNSPrice Monitoring Extension
11th Jul 20197:00 amRNSDrilling Update
13th Jun 20198:00 amRNSDrilling Update for the Toral Project, Spain
15th May 20191:00 pmRNSCommencement of drilling at the Toral Project
14th May 20195:23 pmRNSHolding(s) in Company
13th May 20197:00 amRNSRig mobilised to site - Toral Project
17th Apr 20195:00 pmRNSHolding(s) in Company
17th Apr 20195:00 pmRNSHolding(s) in Company
29th Mar 20194:40 pmRNSSecond Price Monitoring Extn
29th Mar 20194:35 pmRNSPrice Monitoring Extension
29th Mar 201911:30 amRNSEquity Fundraise, Issue of Warrants & Joint Broker
28th Mar 20197:00 amRNSChange in Spanish Legislation re Mining Land Use
15th Mar 20197:15 amRNSInterim Results
11th Mar 20197:00 amRNSScoping Study Economics for the Toral Project
8th Mar 20197:30 amRNSRemoval from the Official List of the ASX
22nd Feb 20199:00 amRNSApproval for commencement of trading on the AltX
31st Jan 20197:00 amRNSQuarterly Activities and Cashflow Report
25th Jan 20197:00 amRNSApplication for Removal from the ASX
7th Jan 20192:06 pmRNSSecond Price Monitoring Extn
7th Jan 20192:00 pmRNSPrice Monitoring Extension
20th Dec 20187:00 amRNSPhase II Drilling Results
17th Dec 20184:40 pmRNSSecond Price Monitoring Extn
17th Dec 20184:35 pmRNSPrice Monitoring Extension
10th Dec 20187:00 amRNSScoping Study Results & Revised Resource Estimate
28th Nov 201812:15 pmRNSForthcoming Investor Presentation Events
5th Nov 20187:00 amRNSResult of AGM
31st Oct 20187:05 amRNSQuarterly Activities and Cashflow Report
31st Oct 20187:00 amRNSDrilling Update - Toral Project, Spain
4th Oct 20188:00 amRNSToral Project Update
3rd Oct 20187:00 amRNSNotice of AGM
1st Oct 20187:05 amRNSAnnual Resource and Reserves Statement
1st Oct 20187:00 amRNSAnnual Financial Report
24th Sep 20187:00 amRNSChange of Registered Office
20th Sep 20187:00 amRNSUpdated JORC Mineral Resource Estimate for Toral
17th Sep 20182:05 pmRNSSecond Price Monitoring Extn
17th Sep 20182:00 pmRNSPrice Monitoring Extension
13th Sep 20187:00 amRNSLand Use Process Initiated - Toral Project, Spain
28th Aug 20187:00 amRNSRig Mobilisation and Toral Project Update
10th Aug 20187:00 amRNSCompletion of Fundraising
31st Jul 20187:00 amRNSQuarterly Activities and Cashflow Report
30th Jul 20187:00 amRNSExpiry of Options
27th Jul 20187:00 amRNSPlacing of £563,516 (gross)
16th Jul 20187:00 amRNSDrill Rig Contracted - Toral Project, Spain
22nd Jun 20187:00 amRNSShares Investor Evening, Manchester

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.