Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Metals Regulatory News (EUZ)

Share Price Information for Europa Metals (EUZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
EUZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

31 Jan 2020 07:00

RNS Number : 4995B
Europa Metals Ltd
31 January 2020
 

31 January 2020

Europa Metals Ltd

("Europa Metals", the "Company" or the "Group") (AIM, AltX: EUZ)

Hole TOD-025 and Wedge Completed, Toral Pb, Zn, Ag Project, Spain

Europa Metals, the European focused lead-zinc and silver developer, is pleased to provide a drilling update in respect of its wholly owned Toral lead, zinc and silver project ("Toral" or the "Toral Project") situated in the region of Castilla y León, north west Spain.

Highlights:

·; Drill hole TOD-025 completed;

·; Visual review of intersected mineralisation resulted in a decision to drill beyond the original target depth of 420 metres to 497 metres;

·; Opportunity identified to drill a wedge, TOD-025D, which has been completed;

·; Company targeted the highest grade areas of Toral, based on the pre-existing JORC (2012) mineral resource estimate and block model, with this diamond drilling campaign which has now been concluded; and

·; Core samples to be sent for independent assay, with the results expected to be announced later in Q1 2020.

 

The Company is pleased to announce that the drilling of hole TOD-025 has been completed, with a wedge, TOD-025D, also being drilled off the parent hole which concludes the latest drilling campaign. Core samples obtained from both holes TOD-025 and TOD-025D, and the previously drilled hole TOD-024, will shortly be sent for independent assay.

 

Further to visual review of mineralisation intersected during the drilling of hole TOD-025, a decision was made to continue drilling beyond the original target depth of 420 metres to 497 metres. On completion of this hole, the opportunity was taken to immediately commence a wedge from the parent hole, which has now been successfully concluded at a depth of 500 metres. As previously announced, the independent assay results from this latest drill programme are expected to be received and announced later in Q1 2020.

 

Holes TOD-024, TOD-025 and TOD-025D are located in the highest grade areas of the Toral Project, to the west of the current Indicated JORC (2012) mineral resource estimate and within the global (Inferred) resource zone. These holes have targeted areas to infill between historic drill holes and within areas of specific interest to the Company located inside the higher grade zones of the deposit.

 

Table 1: Drilling data for Holes TOD-025 and TOD-025D

HOLE ID

EASTING

NORTHING

COOR_SYS

ELEVATION

DEPTH (M)

TOD-025

681194.784

4710030.946

ETRS89utm29

531.945

497.2

TOD-025D

681194.784

4710030.946

ETRS89utm29

531.945

500

 

The appendix to this announcement contains further summary information on the Toral Project.

For further information on the Company, please visit www.europametals.com or contact:

 

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Laurence Read, Executive Director (UK)

T: +44 (0)20 3289 9923

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler

T: +44 (0)20 7409 3494

 

Turner Pope Investments (TPI) Limited (Broker)

Andy Thacker/Zoe Alexander

T: +44 (0)20 3657 0050

 

Sasfin Capital Proprietary Limited (a member of the Sasfin group)

Sharon OwensT (direct): +27 11 809 7762

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

Notes to Editors

Appendix: Further information on the Toral Project

 

JORC (2012) Mineral Resource Estimate

 

The Toral Project is a traditional polymetallic (lead-zinc-silver) deposit, which is hosted over 6km of strike length of the prospective Lower Cambrian Vegadeo Limestone formation, that is regionally mineralised along more than 40km of its extent. The deposit represents a carbonate hosted, structurally controlled deposit type, demonstrating fault-controlled contact, vein, carbonate replacement and breccia styles of mineralisation situated close to and along the boundary between footwall slates and hanging wall limestones and dolomites. Sub-ordinate lead-zinc-silver mineralisation also occurs wholly within the hanging wall limestones and dolomites, approaching the contact with the slates.

 

Historic drill hole re-logging undertaken by the Company in 2018 provided improved geological, structure, alteration and weathering/oxidation information, which was incorporated into the interpreted geological and mineralised models for the current JORC (2012) mineral resource estimate. Surface mapping and remote data interpretation by Europa Metals has enabled the development of an interpreted fault model, also incorporated into the aforementioned updated geological and mineralised models used in the mineral resource estimate.

 

The latest mineral resource estimate (as of 25 October 2019) for the Toral deposit comprised, at a 4% cut-off:

·; An Indicated resource of approximately 2.7Mt @ 8.9% Zn Equivalent (including Pb credits), 5% Zn, 4.2% Pb and 32g/t Ag

o Including 130,000 tonnes of zinc, 110,000 tonnes of lead and 2.8 million ounces of silver

·; An Inferred resource of approximately 16Mt @ 7.2% Zn Equivalent (including Pb credits), 4.5% Zn, 2.9% Pb and 22g/t Ag

o Including 690,000 tonnes of zinc, 450,000 tonnes of lead and 11 million ounces of silver

·; Total Resources of approximately 18Mt @ 7.4% Zn Equivalent (including Pb credits), 4.5% Zn, 3.1% Pb and 24g/t Ag

o Including 830,000 tonnes of zinc, 570,000 tonnes of lead and 14 million ounces of silver

--The latest resource update identified potentially economic mineralisation ranging from surface to approximately 1,100m below surface. The block model currently extends for a strike length of 3,600m and is still open to the east and west along strike and also at depth where it has not yet been closed off.

 

Cut-Off Zn Eq (PbAg)%

Tonnes (Millions)

Density

Zn Eq (Pb)%

Zn Eq (PbAg)%

Zn %

Pb %

Ag g/t

Contained Zn Tonnes (000s)

Contained Pb Tonnes (000s)

Ag Troy Oz (Millions)

Indicated

6

2.1

3

10

11

6

4.7

35

120

100

2.4

5

2.3

2.9

9.6

10

5

4.5

34

130

100

2.6

4

2.7

2.9

8.9

9.5

5

4.2

32

130

110

2.8

3

3.0

2.9

8.3

8.9

5

3.9

31

140

120

2.9

Inferred

6

11

2.9

8.4

8.9

5

3.5

26

550

360

8.8

5

12

2.9

7.9

8.4

5

3.2

24

610

400

9.7

4

16

2.9

7.2

7.6

5

2.9

22

690

450

11

3

18

2.9

6.7

7.1

4

2.7

21

740

480

12

Total

6

13

2.9

8.7

9.2

5

3.7

28

670

460

11

5

15

2.9

8.2

8.6

5

3.4

26

740

510

12

4

18

2.9

7.4

7.9

5

3.1

24

830

570

14

3

21

2.9

6.9

7.3

4

2.9

22

880

600

15

Transitional Oxide Material Total

4

3

2.9

5.8

6.3

3

3.2

27

87

97

2.6

Unweathered Fresh Rock Total

4

15

2.9

7.8

8.2

5

3.1

23

740

470

11

 

Table 2: Summary of mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimate and as such totals may not cast.

Notes:

1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2. Numbers are rounded to reflect the fact that an Estimate of Resources was reported as stipulated by JORC 2012. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.

3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,780/t, Pb price of US$2,200/t and Ag price of US$16.4/oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (Zinc, Lead and Silver) have a reasonable potential to be recovered and sold.

4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.935 + Ag*0.018).

5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.935).

6. The mineral resource estimate set out above for the zinc, lead and silver mineralisation in the Toral project area is based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the Toral project up to 30 September 2019. The block model used uniform cell size of 50x4x50m to best suit the orientation of the mineralisation and sample spacing. The block model was rotated by 20° in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using an ordinary kriging.

7. Top cuts were applied to the composite assay grades for 20% Zn, 17% Pb and 125 g/t Ag, any value above the top cut value was reduced to that grade.

8. The Indicated and Inferred mineral resource category for the Toral lead-zinc-silver project set out in Table 2 (at cut-off grades ≥4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).

9. The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4% and as such should not be considered mineral resources, they are shown here for comparison purposes only.

Bulk density

 

The resource database contains 2,373 bulk density measurements, with a total of 177 within the mineralised wireframe.

 

The mean for the mineralised domain transitional zone is 2.75 g/cm3 and the mean for the mineralised domain fresh material is 2.85 g/cm3. A broad linear relationship between Pb+Zn grade and bulk density was identified from scattergrams and the formula 2.75 + 0.02(Pb+Zn%) used to estimate block density within the block model.

 

Preliminary independent metallurgical test results from Wardell Armstrong International ("WAI") (December 2019).

Overview of sample and metallurgical testwork carried out by WAI:

·; Grind calibration tests to assess the Bond Abrasion, Rod and Ball work indices and uniaxial compressive strength;

·; First open flotation tests, optimisation of grind size, float cleaning tests and rougher regrind testing;

·; Petrographic/mineralogical and scanning electron microscope (SEM) work;

·; First/single locked cycle testing; and

·; A series of comminution tests were undertaken to investigate the crushing and grinding characteristics of the sample. The testing conducted investigated conventional crushing technologies, the results of which are summarised in the following table:

Comminution Testwork Results

Comminution Test

Units

Value

Unconfined Compressive Strength (UCS)

MPa

51.8

Bond Abrasion Index

-

0.5227

Bond Rod Mill Work Index

kWh/t

12.69

Bond Ball Mill Work Index

kWh/t

9.83

Flotation Testwork

A series of tests were undertaken to investigate the recovery of lead and zinc to separate concentrates by means of froth flotation. The testing conducted consisted of: eight rougher flotation tests, four first-stage cleaner flotation tests, six three-stage cleaner flotation tests and a single locked cycle flotation test.

 

The results of the locked cycle test are summarised below.

Table 3: Locked cycle flotation test results

Assay

Recovery (%)

Product

Mass (%)

Pb (%)

Zn (%)

Ag (ppm)

Pb

Zn

Ag

Pb Cl 3 Conc 

2.5 

57.47

10.06 

1,457

84.30

9.65

90.35

Zn Cl 3 Conc 

3.4 

1.16

55.78 

38.6

2.25

70.71

3.17

Zn Cl 1 Scav Tailings 

5.3 

1.74

2.89 

28.8

5.36

5.82

3.76

Zn Ro Tailings 

88.8 

0.16

0.41

1.3

8.09

13.82

2.73

Feed 

100.0 

1.73

2.65

40.9

100.00

100.00

100.00

The locked cycle test achieved a lead recovery of 84.3% to a concentrate grading 57.5% Pb and a zinc recovery of 70.7% to a concentrate grading 55.8% Zn. 90.3% of the silver was also recovered to the lead concentrate at a grade of 1,457ppm Ag.

 

Economic highlights from the Company's selected development scenario 

Estimated economic forecasts for the Toral Project based on the current level of work (+/-30%) from the Scoping Study (December 2018) comprise:

·; US$110 million net present value (NPV) using a discount rate of 8%;

·; 24.4% internal rate of return (IRR);

·; Estimated US$33 million CAPEX for a proposed 450ktpa design capacity plant, including associated auxiliary costs, with infrastructure being situated near portal entrance on the north side of the deposit;

·; Estimated total CAPEX of US$110 million; 

·; US$25 per tonne indicative OPEX processing cost at steady state conditions; 

·; US$36 per tonne indicative OPEX mining cost utilising mechanised cut and fill; and

·; 15-year production plan, with significant potential for extension.

 

Basis for announcing economics

The factors that lead the Company to believe that it has a reasonable basis for announcing a production target and forecast financial information are detailed in the Scoping Study and can be summarised as follows:

Three conceptual underground mining development and production scenarios were considered and developed throughout the Scoping Study, resulting in the identification of a preferred scenario, highlights from which are set out below:

·; decline ramp access to the north of the deposit, targeting mine production within the higher-grade core towards the centre of the planned mining blocks;

·; entry to mine via a principal decline reaching various levels;

·; series of internal mining inclined ramps constructed to access levels;

·; mechanised cut and fill (MCAF) mining method proposed;

·; 4x4 metre mine standard development size;

·; a ventilation raise would be drilled (raise-bored) to provide both adequate ambient conditions underground and a second, emergency means of access/egress into the mine;

·; ore transported to a flotation process plant by conveyor or haul truck from the mine and crushed to a suitable product for milling;

·; milled ore floated by standard flotation technology to provide lead and zinc concentrate, with silver probably reporting to the lead concentrate for sale as a combined product; and

·; 4% Zn Eq cut-off used with potential for mine life extension.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLKKKBNFBKDCDN
Date   Source Headline
12th May 20162:15 pmRNSStmnt re Share Price Movement
4th May 20167:00 amRNSHolding(s) in Company
29th Apr 20167:00 amRNSQuarterly Activities and Cashflow Report
27th Apr 201612:42 pmRNSEquity fundraising of £650,000 gross
6th Apr 20167:00 amRNSResults of General Meeting
31st Mar 20169:00 amRNSStrategic Update and Directorate Changes
15th Mar 20169:07 amRNSHalf Yearly Report
15th Mar 20167:00 amRNSHalf Yearly Report
4th Mar 20167:00 amRNSPosting of Notice of General Meeting
25th Feb 201610:00 amRNSFundraising and Notice of General Meeting
16th Feb 20167:00 amRNSOption Over Lead-Zinc Exploration Projects, Spain
29th Jan 20167:00 amRNSQuarterly Activities and Cashflow Report
14th Jan 20167:00 amRNSExtension of Timetable
16th Dec 20157:00 amRNSDirectorate Change
30th Nov 20158:32 amRNSResult of AGM
6th Nov 20158:54 amRNSResponse to ASX Letter re Appendix 5B
30th Oct 20153:30 pmRNSHolding(s) in Company
30th Oct 20157:00 amRNSQuarterly Activities and Cashflow Report
29th Oct 20157:00 amRNSMail-out of Notice of Annual General Meeting
14th Oct 20157:00 amRNSBFS Farm-In Agreement Concluded with BVI/Ovation
30th Sep 20157:00 amRNSFinal Results
30th Jul 20157:00 amRNSQuarterly Activities and Cashflow Report
22nd Jul 201510:30 amRNSUpdate re PMI Funding Arrangements
16th Jul 201512:00 pmRNSUpdate re First Funding Payment from PMI
12th Jun 20159:00 amRNSChange of Address of Share Registry
3rd Jun 20157:00 amRNSUpdate re: BFS Financing Agreement
1st Jun 201512:00 pmRNSUpdate re: Admission of Placement Shares
29th May 20157:00 amRNSChange of Adviser
15th May 201511:34 amRNSReplacement- Changes to Directors' Interests
15th May 20158:00 amRNSDirector/PDMR Shareholding
14th May 20158:01 amRNSPrivate Placing
5th May 20157:01 amRNSUS$12m BFS Financing Agreement
29th Apr 20157:00 amRNSQuarterly Activities and Cashflow Report
28th Apr 20157:00 amRNSBFS Infrastructure Process Update, South Africa
24th Apr 20154:40 pmRNSSecond Price Monitoring Extn
24th Apr 20154:35 pmRNSPrice Monitoring Extension
1st Apr 20158:00 amRNSFirst Mine Location Identified Following Drilling
25th Mar 20157:00 amRNSChange of Registered Office
23rd Mar 201510:00 amRNSChange of Adviser
16th Mar 20157:00 amRNSHalf Yearly Report
2nd Mar 20157:00 amRNSAppointment of Financial Adviser
11th Feb 20159:00 amRNSGrant of Options to Adviser
2nd Feb 20157:00 amRNSFirst BFS Drill Programme Complete
29th Jan 20157:00 amRNSQuarterly Activities and Cashflow Report
21st Jan 20154:40 pmRNSSecond Price Monitoring Extn
21st Jan 20154:35 pmRNSPrice Monitoring Extension
19th Jan 20157:00 amRNSChange of Adviser
15th Dec 201410:35 amRNSHolding(s) in Company
12th Dec 20147:00 amRNSDirectorate Change
10th Dec 20147:00 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.