Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.775
Bid: 1.75
Ask: 1.80
Change: -0.525 (-22.83%)
Spread: 0.05 (2.857%)
Open: 2.30
High: 2.35
Low: 1.775
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

West Kytlim Project Update

29 Feb 2016 07:00

RNS Number : 3864Q
Eurasia Mining PLC
29 February 2016
 

Eurasia Mining PLC

RNS Number :

Eurasia Mining PLC

February 2016

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

West Kytlim Project update

Further to our project update in late January 2016, Eurasia Mining plc, the Russia focused PGM exploration and development company, is pleased to announce an update with regard to positive developments at our West Kytlim Project.

Highlights:

- The Technical Design Report for the diesel operation at Malaya Sosnovka has been submitted to the Ministry for Subsoil use.

- Contractors assessing the route for the proposed power line to West Kytlim have finished all necessary field work including land surveying, ecological sampling and shallow geotechnical drilling.

- The Company has now received the topographic survey from the contractors for the next area to be mined, the Kluchiki area.

 

As mentioned in previous press releases, Eurasia is developing a mine at its West Kytlim alluvial platinum project. The mining schedule requires a diesel powered start up phase targeting high grade reserves at surface in the Malaya Sosnovka area. The Technical Design Report mentioned above has been submitted to the relevant ministry for mine plan approval to be obtained prior to commencement of operations.

 

Separately, a mine plan is being developed to cover development of the entire licence area using mains electrical power, which is planned to be available after construction of a power line to site. We believe the main advantage for the use of grid electrical power is clear, as the price is estimated at 5 US$ cents per KWh. This compares with average industrial power costs in the UK of 13 US$ cents per KWh. A field assessment on the route of the power line has now been completed.

 

We believe the advantages of electrical power will become obvious as we move towards producing from more than one site, and with the commencement of the deployment of electrically powered dragline operations. Draglines can operate 12 months of the year and will be used for overburden removal and stockpiling of mineralized material for later processing.

 

The next area (within West Kytlim) which Eurasia will target for mining operations, the Kluchiki area, has now been surveyed in detail. We believe this will greatly assist advanced planning for the location of infrastructure including wash plants and water storage and tailings dams required for production in the second year of operations at West Kytlim. A map on the Company's website shows the location of the mining areas http://www.eurasiamining.co.uk/operations/urals-alluvial.aspx

 

Christian Schaffalitzky, Managing Director, commented: "While the diesel operation is smaller scale and more expensive per tonne than electrical power, it allows us to establish operations at West Kytlim for the long term. Eurasia is aiming to establish a minimum 10 year project producing platinum."

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

Loeb Aron

John Beresford-Peirse

+44 (0)207 628 1128

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSRFFITFIR
Date   Source Headline
2nd Feb 20214:41 pmRNSSecond Price Monitoring Extn
2nd Feb 20214:35 pmRNSPrice Monitoring Extension
2nd Feb 202111:56 amRNSForm 8.5 (EPT/RI)
1st Feb 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
1st Feb 202110:45 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
29th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Jan 202111:57 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
28th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
28th Jan 202111:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
28th Jan 20219:05 amRNSSecond Price Monitoring Extn
28th Jan 20219:00 amRNSPrice Monitoring Extension
28th Jan 20217:00 amRNSShare Price Movement & Update
27th Jan 20214:41 pmRNSSecond Price Monitoring Extn
27th Jan 20214:36 pmRNSPrice Monitoring Extension
27th Jan 20214:02 pmRNSForm 8 (DD) - Eurasia Mining PLC
27th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
26th Jan 202111:42 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
25th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
25th Jan 202111:22 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
22nd Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
21st Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
21st Jan 202110:28 amRNSWest Kytlim DFS Approved
20th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
19th Jan 202111:51 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
19th Jan 20219:58 amRNSForm 8.3 - Eurasia Mining plc
18th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
18th Jan 202111:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
15th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
15th Jan 202111:49 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
14th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
14th Jan 202112:01 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
14th Jan 20217:00 amRNSUpdate on Formal Sale Process
13th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
13th Jan 202111:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining
12th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
12th Jan 202111:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
11th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
11th Jan 202111:57 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
8th Jan 20213:20 pmRNSForm 8.3 -Eurasia Mining plc
8th Jan 202111:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
7th Jan 20214:41 pmRNSSecond Price Monitoring Extn
7th Jan 20214:36 pmRNSPrice Monitoring Extension
7th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
7th Jan 20212:05 pmRNSSecond Price Monitoring Extn
7th Jan 20212:00 pmRNSPrice Monitoring Extension
7th Jan 202111:54 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
6th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
6th Jan 202110:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
5th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.