The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.175
Bid: 2.15
Ask: 2.20
Change: -0.125 (-5.43%)
Spread: 0.05 (2.326%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

West Kytlim Project Update

29 Feb 2016 07:00

RNS Number : 3864Q
Eurasia Mining PLC
29 February 2016
 

Eurasia Mining PLC

RNS Number :

Eurasia Mining PLC

February 2016

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

West Kytlim Project update

Further to our project update in late January 2016, Eurasia Mining plc, the Russia focused PGM exploration and development company, is pleased to announce an update with regard to positive developments at our West Kytlim Project.

Highlights:

- The Technical Design Report for the diesel operation at Malaya Sosnovka has been submitted to the Ministry for Subsoil use.

- Contractors assessing the route for the proposed power line to West Kytlim have finished all necessary field work including land surveying, ecological sampling and shallow geotechnical drilling.

- The Company has now received the topographic survey from the contractors for the next area to be mined, the Kluchiki area.

 

As mentioned in previous press releases, Eurasia is developing a mine at its West Kytlim alluvial platinum project. The mining schedule requires a diesel powered start up phase targeting high grade reserves at surface in the Malaya Sosnovka area. The Technical Design Report mentioned above has been submitted to the relevant ministry for mine plan approval to be obtained prior to commencement of operations.

 

Separately, a mine plan is being developed to cover development of the entire licence area using mains electrical power, which is planned to be available after construction of a power line to site. We believe the main advantage for the use of grid electrical power is clear, as the price is estimated at 5 US$ cents per KWh. This compares with average industrial power costs in the UK of 13 US$ cents per KWh. A field assessment on the route of the power line has now been completed.

 

We believe the advantages of electrical power will become obvious as we move towards producing from more than one site, and with the commencement of the deployment of electrically powered dragline operations. Draglines can operate 12 months of the year and will be used for overburden removal and stockpiling of mineralized material for later processing.

 

The next area (within West Kytlim) which Eurasia will target for mining operations, the Kluchiki area, has now been surveyed in detail. We believe this will greatly assist advanced planning for the location of infrastructure including wash plants and water storage and tailings dams required for production in the second year of operations at West Kytlim. A map on the Company's website shows the location of the mining areas http://www.eurasiamining.co.uk/operations/urals-alluvial.aspx

 

Christian Schaffalitzky, Managing Director, commented: "While the diesel operation is smaller scale and more expensive per tonne than electrical power, it allows us to establish operations at West Kytlim for the long term. Eurasia is aiming to establish a minimum 10 year project producing platinum."

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

Loeb Aron

John Beresford-Peirse

+44 (0)207 628 1128

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSRFFITFIR
Date   Source Headline
5th Jan 202111:51 amRNSForm 8.5 (EPT/RI) - Eurasia Mining
4th Jan 20213:20 pmRNSForm 8.3 - Eurasia Mining plc
31st Dec 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
31st Dec 202011:55 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
30th Dec 202011:08 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
29th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
29th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
24th Dec 20201:00 pmRNSForm 8.3 - Eurasia Mining plc
24th Dec 202012:44 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining
23rd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
23rd Dec 202012:20 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
22nd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
22nd Dec 202011:11 amRNSForm 8.5 (EPT/RI)Eurasia Mining PLC
22nd Dec 20208:48 amRNSForm 8.3 - Eurasia Mining
21st Dec 20203:52 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
21st Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
21st Dec 202012:06 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
18th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
18th Dec 202011:43 amRNSForm 8.5 (EPT/RI) Eurasia Mining PLC
17th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
16th Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
15th Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
15th Dec 20209:02 amRNSForm 8.3 - Eurasia Mining
14th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
14th Dec 202011:06 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
11th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
11th Dec 202011:13 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
10th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
9th Dec 202011:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
8th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
8th Dec 202011:40 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
7th Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
7th Dec 202011:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
3rd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
3rd Dec 202011:58 amRNSForm 8.5 (EPT/RI) - Eurasia Mining Plc
3rd Dec 20207:00 amRNSWest Kytlim DFS update
2nd Dec 20203:20 pmRNSForm 8.3 - Eurasia Mining plc
2nd Dec 202012:10 pmRNSRule 2.9 Announcement
2nd Dec 202011:54 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc Replacement
2nd Dec 202011:46 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
1st Dec 202011:30 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
30th Nov 20204:41 pmRNSSecond Price Monitoring Extn
30th Nov 20204:36 pmRNSPrice Monitoring Extension
30th Nov 202011:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
25th Nov 202011:15 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
18th Nov 202011:47 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
17th Nov 202011:57 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.