GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.95
Bid: 1.90
Ask: 2.00
Change: -0.35 (-15.22%)
Spread: 0.10 (5.263%)
Open: 2.30
High: 2.40
Low: 1.70
Prev. Close: 2.30
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

West Kytlim Project Update

29 Feb 2016 07:00

RNS Number : 3864Q
Eurasia Mining PLC
29 February 2016
 

Eurasia Mining PLC

RNS Number :

Eurasia Mining PLC

February 2016

 

Eurasia Mining plc (AIM: EUA)

 

("Eurasia" or the "Company")

West Kytlim Project update

Further to our project update in late January 2016, Eurasia Mining plc, the Russia focused PGM exploration and development company, is pleased to announce an update with regard to positive developments at our West Kytlim Project.

Highlights:

- The Technical Design Report for the diesel operation at Malaya Sosnovka has been submitted to the Ministry for Subsoil use.

- Contractors assessing the route for the proposed power line to West Kytlim have finished all necessary field work including land surveying, ecological sampling and shallow geotechnical drilling.

- The Company has now received the topographic survey from the contractors for the next area to be mined, the Kluchiki area.

 

As mentioned in previous press releases, Eurasia is developing a mine at its West Kytlim alluvial platinum project. The mining schedule requires a diesel powered start up phase targeting high grade reserves at surface in the Malaya Sosnovka area. The Technical Design Report mentioned above has been submitted to the relevant ministry for mine plan approval to be obtained prior to commencement of operations.

 

Separately, a mine plan is being developed to cover development of the entire licence area using mains electrical power, which is planned to be available after construction of a power line to site. We believe the main advantage for the use of grid electrical power is clear, as the price is estimated at 5 US$ cents per KWh. This compares with average industrial power costs in the UK of 13 US$ cents per KWh. A field assessment on the route of the power line has now been completed.

 

We believe the advantages of electrical power will become obvious as we move towards producing from more than one site, and with the commencement of the deployment of electrically powered dragline operations. Draglines can operate 12 months of the year and will be used for overburden removal and stockpiling of mineralized material for later processing.

 

The next area (within West Kytlim) which Eurasia will target for mining operations, the Kluchiki area, has now been surveyed in detail. We believe this will greatly assist advanced planning for the location of infrastructure including wash plants and water storage and tailings dams required for production in the second year of operations at West Kytlim. A map on the Company's website shows the location of the mining areas http://www.eurasiamining.co.uk/operations/urals-alluvial.aspx

 

Christian Schaffalitzky, Managing Director, commented: "While the diesel operation is smaller scale and more expensive per tonne than electrical power, it allows us to establish operations at West Kytlim for the long term. Eurasia is aiming to establish a minimum 10 year project producing platinum."

 

Enquiries:

 

Eurasia Mining Plc

Christian Schaffalitzky/Michael de Villiers

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/Liam Gribben

+44 (0)161 832 2174

 

Beaufort Securities

Elliot Hance

+44 (0)207 382 8300

 

Loeb Aron

John Beresford-Peirse

+44 (0)207 628 1128

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSRFFITFIR
Date   Source Headline
16th Nov 202011:49 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
12th Nov 202011:38 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
10th Nov 20209:24 amRNSForm 8.3 - Eurasia Mining
9th Nov 202011:55 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
5th Nov 202011:39 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
4th Nov 202011:45 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
28th Oct 202011:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
27th Oct 202010:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
23rd Oct 20202:54 pmRNSForm 8.5 (EPT/RI) Eurasia Mining PLC amendment
23rd Oct 202011:20 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
22nd Oct 202011:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
21st Oct 20203:00 pmRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC Amend
21st Oct 202011:56 amRNSForm 8.5 (EPT/RI) - Eurasia Mining
20th Oct 202011:53 amRNSForm 8.5 (EPT/RI) - Eurasia Mining PLC
15th Oct 202011:47 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
12th Oct 20207:00 amRNSStatement re Share Price Movement
9th Oct 20208:34 amRNSForm 8.3 - Eurasia Mining
7th Oct 20204:41 pmRNSSecond Price Monitoring Extn
7th Oct 20204:36 pmRNSPrice Monitoring Extension
5th Oct 202011:05 amRNSSecond Price Monitoring Extn
5th Oct 202011:00 amRNSPrice Monitoring Extension
2nd Oct 20204:40 pmRNSSecond Price Monitoring Extn
2nd Oct 20204:36 pmRNSPrice Monitoring Extension
2nd Oct 20202:06 pmRNSSecond Price Monitoring Extn
2nd Oct 20202:00 pmRNSPrice Monitoring Extension
1st Oct 20204:41 pmRNSSecond Price Monitoring Extn
1st Oct 20204:35 pmRNSPrice Monitoring Extension
1st Oct 20202:05 pmRNSSecond Price Monitoring Extn
1st Oct 20202:00 pmRNSPrice Monitoring Extension
1st Oct 20209:05 amRNSSecond Price Monitoring Extn
1st Oct 20209:00 amRNSPrice Monitoring Extension
30th Sep 20204:56 pmRNSInterim Report
30th Sep 202011:48 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
18th Sep 20201:45 pmRNSResult of AGM
18th Sep 20207:00 amRNSBoard Changes
16th Sep 202011:45 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
8th Sep 202011:29 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
3rd Sep 202011:57 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
2nd Sep 202011:36 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc
27th Aug 20208:43 amRNSNotice of AGM
26th Aug 202011:56 amRNSForm 8.5 (EPT/RI) Eurasia Mining plc
26th Aug 202010:15 amRNSForm 8.3 - Eurasia Mining plc
25th Aug 20207:00 amRNSMonchetundra Flanks Update
24th Aug 20204:41 pmRNSSecond Price Monitoring Extn
24th Aug 20204:35 pmRNSPrice Monitoring Extension
18th Aug 20207:00 amRNSGeneral Update and Institutional Placing at 22.5p
10th Aug 20207:00 amRNSTipil License
7th Aug 20204:40 pmRNSSecond Price Monitoring Extn
7th Aug 20204:35 pmRNSPrice Monitoring Extension
31st Jul 202011:25 amRNSForm 8.5 (EPT/RI) - Eurasia Mining plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.