Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEuropa Oil & Gas Regulatory News (EOG)

Share Price Information for Europa Oil & Gas (EOG)

Share Price is delayed by 15 minutes
Get Live Data
1.425    -0.05 (-3.39%)
Bid:
1.35
Ask:
1.50
Spread: 0.15 (11.111%)
Market Cap: £18.75m
EOG Live PriceLast checked at - London Stock Exchange

Intraday Europa Oil & Gas Share Chart

Key Projects Update

24 Aug 2010 09:21

Key Projects Update

Summary

The Directors of Europa Oil & Gas (Holdings) plc are pleased to provide a brief update on several of the Company's key projects:

* Progress has been made in quantifying the reserves potential in Voitinel (Romania); * Initial mapping of the Berenx structure (France) confirms its potential for gas reserves in excess of 1TCF; * The well workover programme is complete on the UK producing assets and subsurface work on the West Firsby Field has identified potential for a significant increase in reserves.

Romania

The Voitinel discovery in Romania is likely to benefit from an appraisal well in early 2011. Current estimates of gas-in-place range from 250 to 410bcf across the `Greater Voitinel' area, equating to up to 250 bcf recoverable (70 bcf net). The Paltinu-103 well on the edge of Solca drilled by Romgaz produced gas on extended test at rates of 5 mmscfpd. This provides confidence that both gas and reservoir sands are developed in the undrilled Solca part of the `Greater Voitinel' play.

The Barchiz exploration well, targeting a structure immediately to the north of the prolific thrust belt oil play trend, is anticipated to spud in Q4 2010. Barchiz is the Company's first thrust belt oil play well which remains poorly explored despite having yielded over 5 billion barrels along trend. The Barchiz structure has the reserves potential for up to 30 mmbo gross (6 mmbo net) and is one of several similar structures identified in the Brates block.

The 2010 seismic programme is nearing completion, having acquired new data over the thrust belt oil play as well as infill data to better define well locations for Voitinel-Solca appraisal and development.

France

The focus of attention is the Berenx structure, where gas was proven in 1969 but was not tested. An initial analysis of the recently available 3D seismic survey over Berenx supports the conclusion that the original wells drilled the western edge of a structure with potential for in excess of 1TCF of recoverable reserves. The combination of proven gas and substantial reserves potential close to existing infrastructure at the Lacq Field makes for a compelling investment proposition and drilling success would have a transformational impact on the Company. Detailed mapping is now being undertaken and the Company will subsequently seek partners to drill Berenx-3.

UK

A reservoir engineering study on the West Firsby Field is now complete. The work undertaken on West Firsby has highlighted the potential for significant unswept oil. These additional reserves will be targeted by the next well.

The workover programme on Crosby Warren and West Firsby is now complete with WF6 remaining to come back onstream in the near future. An update on production will be provided in September along with a reserves update for West Firsby.

Following the production testing of the Hykeham-1 well, it is anticipated the well will be plugged and abandoned.

For more information, contact:

Europa Oil & Gas Paul Barrett +44 1235 467 360

Astaire Securities Shane Gallwey/Toby Gibbs +44 20 7492 4750 Astaire Securities Charles Vaughan +44 20 7492 4763

The contents of this news release have been reviewed and approved by Paul Barrett, MSc., a geologist with over 30 years oil, gas and coal experience.

EUROPA OIL & GAS (HOLDINGS) PLC
Date   Source Headline
21st Jul 20147:00 amPRNCommencement of Drilling onshore UK & Operations Update
19th Jun 201411:41 amPRNFavourable Holmwood Court of Appeal Decision
29th May 20147:00 amPRNUpdate on Drilling of Wressle Prospect, Onshore UK
15th Apr 20147:00 amPRNInterim Results
24th Feb 20147:00 amPRNRenewal of Tarbes Val d’Adour Permit, France
12th Feb 20147:00 amPRNIssue of Options
10th Feb 20147:00 amPRNH1 Production & Revenue Update & Board Appointment
7th Feb 20145:05 pmPRNNewsletter
30th Jan 201410:37 amPRNDirector Share Purchase
27th Jan 20147:00 amPRNNotification of Interest in Shares
23rd Jan 20142:41 pmPRNDirector's Dealings
22nd Jan 20144:29 pmPRNNotification of Interest in Shares
20th Jan 20147:00 amPRNResult of Open Offer
15th Jan 201410:06 amRNSWithdrawal of requisition notice
13th Jan 20145:33 pmPRNNotification of Interest in Shares
13th Jan 20147:00 amPRNExtension of Licence PEDL 181, East Lincolnshire
10th Jan 20144:58 pmPRNNotification of Interest in Shares
10th Jan 20147:00 amPRNNotification of Interest in Shares
9th Jan 20148:59 amPRNCompletion of Placing
8th Jan 20143:00 pmRNSRequisition of General Meeting
23rd Dec 20131:18 pmPRNOpen Offer Shares Qualify for EIS and VCT Schemes
20th Dec 20137:00 amPRNOpen Offer
16th Dec 20132:00 pmRNSDirector dealing
16th Dec 20137:00 amPRNPlacing and Open Offer
10th Dec 20134:47 pmPRNResult of AGM
10th Dec 20137:00 amPRNAGM Statement
24th Oct 20137:00 amPRNCompletion of 3D Seismic Offshore Ireland
11th Oct 20137:00 amPRNFinal Results
3rd Oct 20133:15 pmPRNRenewal of Béarn des Gaves Permit, Onshore France
23rd Sep 20137:00 amPRNUpdate on Holmwood, Onshore UK
9th Sep 20137:00 amPRNOperations Update
25th Jul 20133:56 pmPRNFavourable Holmwood High Court Decision
24th Jul 20133:12 pmPRNDirectors Dealing
24th Jul 20137:00 amPRNDirector's Dealings
23rd Jul 20137:00 amPRNUpdate re French Exploration Permits
15th Jul 20137:00 amPRNCommencement of 3D Seismic, Offshore Ireland
24th Jun 20137:00 amPRNPlanning Application Granted to Drill Well Onshore UK
21st May 20137:00 amPRNRelinquishment of Licences in Romania & the SADR
13th May 20137:00 amPRNKosmos Farm-in to Europa’s Irish Licences Approved
26th Apr 20137:00 amPRNInterim Results
18th Apr 20137:00 amPRNKosmos Energy to Farm-in to Europa’s Irish Licences
19th Mar 20137:00 amPRNSeismic Acquisition Commences on PEDL181, UK Onshore
19th Feb 20137:00 amPRNUpdate on First Half Production and Revenues
16th Jan 20137:00 amPRNUpdate on Irish Atlantic Margin Prospects
12th Dec 201211:56 amPRNResult of AGM
11th Dec 20127:00 amPRNAGM Statement
6th Nov 20127:00 amPRNPositive Update on Irish Atlantic Margin Prospects
1st Nov 20127:00 amPRNHolmwood Prospect Appeal Decision to be Contested
25th Oct 20127:01 amPRNAward of Options
16th Oct 20127:00 amPRNFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.