focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.385
Bid: 0.35
Ask: 0.42
Change: 0.0125 (3.36%)
Spread: 0.07 (20.00%)
Open: 0.3725
High: 0.00
Low: 0.00
Prev. Close: 0.3725
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Duyung PSC, Operational Update

25 Oct 2019 07:15

RNS Number : 1404R
Empyrean Energy PLC
25 October 2019
 

This announcement contains inside information

Empyrean Energy PLC / Index: AIM / Epic: EME / Sector: Oil & Gas

 

25 October 2019

 

Empyrean Energy PLC ("Empyrean" or the "Company")

Duyung PSC, Operational Update

 

Empyrean Energy Plc, the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide an operational update in relation to the drilling campaign in the Duyung PSC in the West Natuna basin, offshore Indonesia, in which Empyrean holds an 8.5% interest.

 

Empyrean has been advised by the operator, Conrad Petroleum Limited ("Conrad"), that following the Tambak-2 well successfully reaching a total depth of 1,650 feet on 15 October 2019, the top of the targeted Intra-Muda reservoir depth came in as prognosed approximately 10 feet up-dip to Conrad's Mako South-1 gas discovery well over 13.5 km away.

 

A full logging suite was acquired, including formation pressure measurements, confirming a 33 feet gross gas pay zone (30 feet net) with formation permeabilities calculated to be over 1 Darcy across the best quality zone. The pressures and gas-water contact depth in Tambak-2 are the same as those encountered in Mako South-1, confirming a very large "single-tank" or areal extent of the Mako gas field.

 

While preparing for a Drill Stem Test ("DST") across the intra-Muda reservoir, an inflatable open hole bridge plug ("packer"), used to isolate the gas-bearing reservoir for testing, failed. During operations to recover the packer, the well started flowing natural gas to surface. For safety reasons, the well was immediately shut in. Subsequently, utilizing the appropriate well control practices, the well was killed using heavy mud containing barite. A significant quantity of the heavy mud was lost in the highly permeable Intra-Muda reservoir. Following this operation, the well was conditioned, and the DST equipment set-in place into the wellbore. Two separate DST attempts failed to flow gas to the surface due to the heavy formation damage from the kill mud.

 

Miltos Xynogalas, Conrad Executive Director/CEO, commented: "The Tambak-2 well is an appraisal well of the Mako gas field accumulation located a significant distance from the Mako South-1 gas discovery and has delivered a result better than our pre-drill expectation. The result is likely to have a positive impact on Mako's gas-in-place and potentially recoverable volumes. Uncertainty in these parameters has been greatly reduced. The well confirmed the lateral extent of the high-quality reservoir and the presence of a continuous hydrocarbon accumulation. Initial petrophysical analysis suggests high gas saturations, while the gas mobility encountered during pressure measurements and the flow of gas while retrieving the packer confirms the ability of the hydrocarbons to flow to the surface. While the unsuccessful DST caused by the formation damage is disappointing, the well results are extremely encouraging for the development of the Mako gas field. Petrophysical analysis suggests any DST testing would have yielded similar high flow rates to the discovery well."

Tom Kelly, Empyrean CEO commented: "A valid flow test at Tambak-2 without kill mud being required due to the packer failure would have been desirable given the excellent quality reservoir seen on logs and the 33 feet of net gas pay. The logs confirm an excellent quality reservoir at an approximate 13.5km step out from Mako-South 1. This achievement alone is expected to have a positive bearing on resources and potential reserves. We now move on to Tambak-1 which in addition to appraising the intra-Muda sands of the Mako gas discovery, will also test the deeper lower Gabus target".

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 30 years' experience as a hydrocarbon geologist and geoscientist.

 

**ENDS**

 

For further information:

 

Empyrean Energy plc

Tom Kelly

Tel: +61 8 9380 9920

Cenkos Securities plc

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

St Brides Partners Ltd

Priit Piip

Tel: +44 (0) 20 7236 1177

Frank Buhagiar

Tel: +44 (0) 20 7236 1177

 

The Mako Gas Field, Duyung PSC, Offshore Indonesia

 

The Mako gas field is an extremely large, shallow structural closure, with an area extent of over 350 square km. The reservoir is a Pliocene-age sandstone, with a gas-water contact at approximately 391m true vertical depth sub-sea. The field has excellent seismic definition with direct hydrocarbon indicators being very evident.

 

Having been drilled but not tested by prior operators of the acreage, the commercial viability of the Mako gas field was demonstrated by the Mako South-1 well drilled by Empyrean and its partner and operator, Conrad Petroleum Limited in 2017. The well was drilled to core and test the Mako reservoir, flowing up to 10.8 MMscf/d of dry gas on test. Overall four wells have penetrated the reservoir section, and while further appraisal is planned given the huge areal extent of the field, the reservoir distribution is reasonably well understood.

 

The Mako field is located in the prolific West Natuna basin, approximately 16 km from the WNTS pipeline system which delivers gas from Indonesia to Singapore. A plan of development has recently been approved by Indonesian authorities and initial gas marketing discussions have commenced, with a gas buyer in Singapore for the Mako gas. An independent report on the field's potential was recently carried out by Gaffney Cline & Associates, giving a 2C recoverable resource assessment of 276 Bcf and 392 Bcf of 3C recoverable resources.

 

Near Field Exploration Potential, To Be Tested in 2019

 

A series of prospects both beneath and above the Mako field have been mapped. Of particular note is the Tambak (formerly 'Mako Deep') prospect, a Lower Gabus structure that sits beneath the northern end of the Mako field. The target interval within Tambak exhibits seismic amplitude brightening, conformable with structural closure. The prospect has a prospective resource range of 200 to 300 Bcf with a mid-case 250 Bcf and a CoS of 45%.

 

At the southern end of the field, over the structure's crest, sits the Mako Shallow prospect. This again shows a very strong direct hydrocarbon indicators on seismic, conformable with closure in shallow Muda sandstones. The Shallow Muda prospect has potential to add a further 100 Bcf of recoverable resources and a very high CoS of 75%.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDEAKESAFANFEF
Date   Source Headline
25th Oct 20114:19 pmRNSConversion of Loan
24th Oct 20117:17 amRNSSugarloaf Project Update
19th Oct 20113:30 pmRNSConversion of Loan
15th Sep 20119:47 amRNSSugarloaf Project Update
31st Aug 201111:42 amRNSConversion of Loan - REPLACEMENT
24th Aug 20118:54 amRNSIssue of Equity
16th Aug 20119:43 amRNSDirector/PDMR Shareholding
15th Aug 20118:11 amRNSSugarloaf Update
19th Jul 20117:19 amRNSFurther re Sugarloaf Update
24th Jun 20111:30 pmRNSResult of AGM
14th Jun 20117:00 amRNSSugarloaf Project Update
3rd Jun 20117:59 amRNSTrading Statement
2nd Jun 20117:59 amRNSSugarloaf Project Update
31st May 201110:03 amRNSNotice of AGM
25th May 20117:00 amRNSFinal Results
13th May 20117:00 amRNSSugarloaf Project Update
29th Mar 201112:48 pmRNSGrant of options and Directorate change
22nd Mar 20118:22 amRNSInvestor Roadshow
10th Mar 20113:00 pmRNSDirector/PDMR Shareholding
9th Mar 20117:13 amRNSSugarloaf Project, Independent reserves report
28th Feb 20118:48 amRNSCORRECTION: Sugarloaf Update
28th Feb 20117:16 amRNSSugarloaf Update
10th Feb 201112:27 pmRNSUpdate - Riverbend Project, onshore Texas, USA
20th Jan 20117:00 amRNSSugarloaf Update
23rd Dec 20107:00 amRNSHalf Yearly Report
20th Dec 20107:25 amRNSSugarloaf Project Operations Update
10th Dec 201011:01 amRNSSugarloaf Project Operations and Production Update
29th Nov 20107:00 amRNSSugarloaf Project, ("Sugarloaf"), Block B, Texas
23rd Nov 20107:27 amRNSSugarloaf Project ("Sugarloaf") Block B, Texas USA
18th Nov 20109:01 amRNSDraw down of Convertible Loan Facility
18th Nov 20107:00 amRNSChange of Adviser
9th Nov 20107:39 amRNSHercules Prospect, onshore Texas
5th Nov 20107:30 amRNSRiverbend Project, onshore Texas
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
28th Oct 20101:09 pmRNSHolding(s) in Company
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
14th Oct 20107:41 amRNSSugarloaf Project Block B Update
23rd Sep 20107:24 amRNSSugarloaf Project Block B Update
13th Sep 20109:16 amRNSHolding(s) in Company
13th Sep 20107:29 amRNSRiverbend Project Update
8th Sep 20107:00 amRNSSugarloaf Project Block B Update
6th Sep 20107:05 amRNSHercules Prospect, BP America Well Update
20th Aug 20107:15 amRNSRiverbend Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.