Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

31 Mar 2006 08:52

Empyrean Energy PLC31 March 2006 31 March 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling UpdateAIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 well has advised that atat 0600 hours Central Pacific Time today, that current operations at the EagleNorth-1 horizontal well was tripping at 4,032 metres (13,230 feet) to change thedrill bit and bottom hole assembly to drill ahead after having milled a newwindow in the casing at 4,028 metres (13,215 feet) and drilled new formation to4,032 metres (13,230 ft). An evaluation of the drilling difficulties previously experienced have resultedin a revision of the horizontal drilling plan and the adoption of a conservativemedium radius curve to achieve the horizontal well path into the target oilsands. This has required a new horizontal well to commence from a measured depth of4,028 metres (13,215 feet) in the vertical Eagle North-1 well bore. Further technical details are in the annexure to this announcement. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This is a very exciting time for ourcompany and we hope that testing can proceed smoothly from here as the delayshave been due to mechanical problems and do not diminish the technical merit ofthe project." The information contained in this announcement and annexure was completed andreviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc(Hons) who has over 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Toby Howell ChrisLambertConduit PR HB-Corporate Empyrean Energy plcTel: +44 (0) 207 429 6603 Tel: +44(0)207 510 8600 Tel : +44(0) 207 932 2442Mob: +44 (0) 7974 982 512 Annexure Using a less severe curve approach, which was successful in achieving ahorizontal well path in the previous Eagle-1 well, it is believed that theobjective of completing an oil producing horizontal well in the oil bearingsands between Eagle North-1 and Mary Bellochi-1 will be achieved. During the drilling of the horizontal well a 41/2 inch liner is planned to berun as an intermediate step to case off the Kreyenhagen shale at a measureddepth of 4,252 metres (13,950 feet). With the setting of the Kreyenhagen Shale behind the 41/2 inch liner theGatchell target oil sands will be drilled with a normal pressured water basedKCL-Clarizan mud minimising formation invasion and maximing the evaluation ofthe oil bearing potential of the oil sand. Following setting of the intermediate 41/2 inch liner which will put theKreyenhagen Shale behind pipe, a 3 3/4 inch horizontal well bore will then bedrilled over a distance of 320 metres to within 30 metres of the MaryBellocchi-1 oil well. This horizontal well bore will then be completed forproduction with a 2 7/8 inch slotted production liner. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project
26th May 200912:20 pmRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.