If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0725    -0.01 (-12.12%)
Bid:
0.07
Ask:
0.075
Spread: 0.005 (7.143%)
Market Cap: £4.15m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

18 Apr 2006 09:05

Empyrean Energy PLC18 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update Eagle North-1 well in California, USA • Oil shows encountered over a horizontal measured interval of 98 feet whilst drilling the curved part of the well. • Casing of the curved part of the well now complete. • Preparing to drill final horizontal stage before setting production liner. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 horizontal well advisesthat at 1800 hours Central Pacific Time 17 April 2006, the current operation atthe Eagle North-1 horizontal well was preparing to drill ahead after setting 41/2 inch casing at 4,281metres (14,045 feet) measured depth after havingencountered good oil shows from the interval 4,255 metres (13,960 feet )measured depth (4,152 metres TVD KB) to 4,285 metres (14,058 feet). The wellbore is currently at an angle of 87 degrees from the vertical. As per previous announcement, the forward plan is to drill a 3 3/4 inchhorizontal well bore for a distance of approximately 320 metres to within 30metres of the Mary Bellocchi-1 oil well. This horizontal stage will be drilledwith a normal pressured water based KCL-Clarizan mud minimising formationinvasion and maximising the evaluation potential of the oil bearing sand. Thiswill result in a planned measured depth of 4,600 metres (15,090 feet). This horizontal well bore will then be completed for production with a 2 7/8inch slotted production liner. Production testing will follow. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "We are pleased with the recentprogress of completion operations and look forward to the next stage ofhorizontal drilling before setting production liner to test." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PRTel: +44 (0) 207 429 6603 Mob: +44 (0) 7974 982 512 Toby HowellHB Corporate Tel: +44(0) 207 510 8600 Empyrean Energy plcTel : +44(0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Sep 202212:54 pmRNSResult of AGM
26th Sep 202212:01 pmRNSPosting of Annual Report and Notice of GM
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update
10th Mar 20227:00 amRNSEmpyrean moves to SETS trading platform
7th Mar 20228:03 amRNSBlock 29/11, China - Jade drilling update
24th Jan 20227:15 amRNSCyber Fraud Update
10th Jan 20227:00 amRNSJade drilling operational status
23rd Dec 20217:00 amRNSInterim Results
16th Dec 20214:41 pmRNSSecond Price Monitoring Extn
16th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20211:07 pmRNSEmpyrean raises £7.623 million
15th Nov 20217:25 amRNSExercise of 12p Warrants
12th Nov 20217:49 amRNSExercise of 12p Warrants
11th Nov 20217:34 amRNSDrilling Contract Executed for Jade Prospect
3rd Nov 20217:00 amRNSOperations update Jade prospect drilling
26th Oct 20217:00 amRNSExercise of 12p Warrants
21st Oct 202110:00 amRNSExtension to Exercise Period for Placing Warrants
20th Oct 20217:08 amRNSExercise of 12p Warrants
19th Oct 20217:05 amRNSExercise of 12p Warrants
14th Oct 20217:05 amRNSExercise of 12p Warrants
13th Oct 20217:00 amRNSExercise of 12p Warrants
12th Oct 20219:00 amRNSExercise of 12p Warrants
11th Oct 20212:06 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
6th Oct 202110:22 amRNSExercise of 12p Warrants
5th Oct 20217:00 amRNSJade prospect - Well site survey contract awarded

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.