If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0675    -0.005 (-6.90%)
Bid:
0.065
Ask:
0.07
Spread: 0.005 (7.692%)
Market Cap: £3.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

18 Apr 2006 09:05

Empyrean Energy PLC18 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update Eagle North-1 well in California, USA • Oil shows encountered over a horizontal measured interval of 98 feet whilst drilling the curved part of the well. • Casing of the curved part of the well now complete. • Preparing to drill final horizontal stage before setting production liner. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 horizontal well advisesthat at 1800 hours Central Pacific Time 17 April 2006, the current operation atthe Eagle North-1 horizontal well was preparing to drill ahead after setting 41/2 inch casing at 4,281metres (14,045 feet) measured depth after havingencountered good oil shows from the interval 4,255 metres (13,960 feet )measured depth (4,152 metres TVD KB) to 4,285 metres (14,058 feet). The wellbore is currently at an angle of 87 degrees from the vertical. As per previous announcement, the forward plan is to drill a 3 3/4 inchhorizontal well bore for a distance of approximately 320 metres to within 30metres of the Mary Bellocchi-1 oil well. This horizontal stage will be drilledwith a normal pressured water based KCL-Clarizan mud minimising formationinvasion and maximising the evaluation potential of the oil bearing sand. Thiswill result in a planned measured depth of 4,600 metres (15,090 feet). This horizontal well bore will then be completed for production with a 2 7/8inch slotted production liner. Production testing will follow. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "We are pleased with the recentprogress of completion operations and look forward to the next stage ofhorizontal drilling before setting production liner to test." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PRTel: +44 (0) 207 429 6603 Mob: +44 (0) 7974 982 512 Toby HowellHB Corporate Tel: +44(0) 207 510 8600 Empyrean Energy plcTel : +44(0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Sep 202111:00 amRNSResults of Annual General Meeting
23rd Sep 20219:50 amRNSAGM Company Presentation
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development
16th Dec 20204:41 pmRNSSecond Price Monitoring Extn
16th Dec 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20207:14 amRNSBorba Drilling Program
2nd Oct 20207:59 amRNSAppointment of Joint Broker
22nd Sep 202011:06 amRNSResults of Annual General Meeting
22nd Sep 20209:45 amRNSAGM Company Presentation and Question & Answers
21st Sep 20207:00 amRNSDirector/PDMR Shareholding
15th Sep 20208:34 amRNSAward of Options
15th Sep 20208:32 amRNSUpdate re: Annual General Meeting
11th Sep 20207:15 amRNSEmpyrean completes £640,500 Placement
11th Sep 20207:00 amRNSEmpyrean completes £200,000 Placement
21st Aug 202010:11 amRNSFinal Results
3rd Jun 20207:00 amRNSExtension agreed for first phase at Block 29/11
26th May 20207:00 amRNSMako Resource Audit Confirms Significant Upgrade
22nd May 20207:00 amRNSDuyung PSC Update, Indonesia
21st May 20207:00 amRNSBlock 29/11, China - Seismic Inversion Project
12th May 20207:40 amRNSResult of Open Offer
29th Apr 20207:00 amRNSCompany Update
22nd Apr 20207:26 amRNSLaunch of Open Offer
17th Apr 202010:57 amRNSUpdate on Fundraising
14th Apr 20207:30 amRNSSubscription and Proposed Placing
14th Apr 20207:00 amRNSResource Upgrade of Mako Gas Field

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.