Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Contract Executed for Jade Prospect

11 Nov 2021 07:34

RNS Number : 0786S
Empyrean Energy PLC
11 November 2021
 

This announcement contains inside information

 

Empyrean Energy Plc / Index: AIM / Epic: EME / Sector: Oil & Gas

 

Empyrean Energy plc

 

Block 29/11, China -Empyrean and COSL Execute Final Drilling Contract for Jade Prospect

 

11 November 2021

 

Empyrean Energy plc ("Empyrean" or the "Company"), the oil and gas development company with interests in China, Indonesia and the United States, is pleased to advise that the Integrated Drilling Contract ("IDC") for the drilling of the Jade prospect exploration well on Block 29/11, offshore China, (the "Jade Prospect") has been executed by Empyrean and China Oilfield Services Limited ("COSL").

 

 

HIGHLIGHTS

 

· IDC Signed by Empyrean and COSL with targeted well spud date late December 2021

· Drilling rig availability confirmed and all technical, commercial and contractual terms agreed

· IDC confirms the significantly reduced drilling cost estimate of US$12.3m (previous estimate US$18.5m), plus a success-based testing cost estimate of US$7.4m

· Empyrean will now pay the 10% deposit ($US1.23m) under the terms of the IDC

· Drilling rig availability has been confirmed, the Geological Programs agreed and the Well Site Survey contract awarded

· Progression of the various permits required to drill are progressing on schedule with CNOOC EnerTech-Drilling & Production Co ("CNOOC EnerTech") engaged to manage a number of critical pre-drilling permitting and logistical requirements

Empyrean is the operator of Block 29/11 in China and has 100% working interest during the exploration phase. In the event of a commercial discovery, its partner, China National Offshore Oil Company ("CNOOC"), may assume a 51% participating interest in the development and production phase.

As previously announced in September 2021, the Company and COSL agreed all technical, commercial and contractual terms and COSL confirmed rig availability and a target spud date of 15 December to 30 December 2021 for the Jade Prospect. The Geological Program has now been incorporated into the IDC and both parties have executed the final contract. CNOOC approval was sought and provided ahead of the award of the IDC and again prior to signing of the IDC and all parties are aligned in the targeted timing to drill the Jade Prospect in December.

The signed IDC confirms the substantially reduced turnkey quote for the drilling of the Jade Prospect of US$12.3 million on a dry hole basis, an approximate 34% saving on the initial quote. On a success basis, testing of any oil column has been quoted at US$7.4 million.

The Company awarded the Well Site Survey contract in October 2021 and is making good progress on other drill preparation activities. The Well Site Survey will commence as soon as there is a good weather window with low enough swell to safely and effectively complete the survey, as recent sea conditions at the well site have been poor. The Drilling and Geological Programs have been finalised and are incorporated in the IDC. The Company will now pay the 10% deposit (US$1.23 million) within 15 days under the terms of the IDC.

As announced last week, CNOOC EnerTech have been engaged to manage a number of these critical pre drilling permitting and logistical requirements as well as performing a major managerial role over all aspects of the drilling operations

The drilling of the Jade Prospect remains subject to further funding being secured by the Company. The Company is currently in negotiations with potential counterparties and is aiming to finalise the necessary arrangements in the coming weeks. Further updates in this regard and in relation to the Jade well drilling preparation and permitting activities will be made in due course.

The Jade Prospect

The 2021 drilling campaign is targeting a world class conventional oil target in the Jade Prospect, to which Gaffney Cline & Associates ("GCA") assigned a Geological Chance of Success ("GCoS") of 32%. Subsequent to this independent assessment, the Company completed a gas cloud study and post stack seismic inversion study that it believes further mitigates risk and increases the GCoS to 41%.

The Jade Prospect has a GCA audited mean in place potential of 225 MMbbl and a P10 in place upside of 395 MMbbl. Four recent nearby discoveries by CNOOC immediately to the West of the Jade Prospect are filled to their P10 potential or better. All four CNOOC discoveries have gas clouds showing in the overburden on seismic.

Empyrean's excellent quality 3D seismic indicates that there is a classic "fill to spill" geological setup in the basin, and a robust regional seal, that provides the Jade and Topaz Prospects with a very real possibility of being filled in a similar fashion to nearby discoveries. The Jade and Topaz prospects have gas clouds, similar to nearby discoveries, in the overburden on 3D seismic. Dry wells nearby do not have gas clouds. The Jade Prospect is the first of the three identified prospects within Block 29/11, which also contains the Topaz and Pearl prospects. The combined audited mean in place potential of all three prospects is 884 MMbbl and a P10 in place upside of 1,588 MMbbl. The post stack seismic inversion study showed Jade and Topaz both have the potential for excellent carbonate buildup reservoir quality with excellent porosity and permeability. Any oil discovered is expected to be light oil in the 38-41 API range, similar to nearby discoveries. These attributes combined with the potential for exceptional natural reservoir drive supports the potential for excellent recovery rates.

China is the largest importer of oil in the world.

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 31 years' experience as a hydrocarbon geologist and geoscientist.

Empyrean CEO, Tom Kelly, stated:

"The signing of the integrated drilling contract with COSL, marks another important milestone for Empyrean as we gather momentum on the downhill run to drilling the Jade prospect next month. We thank COSL for their diligent and collaborative approach to date. We have already locked in the drill rig and awarded the well site survey and are making very good progress with other drilling preparation activities, acquiring long lead items and securing the necessary drill permits. As announced last week we have engaged CNOOC EnerTech to manage a number of these critical workstreams. Finally, we would like to again thank CNOOC for their continued support and cooperation throughout this process."

 

For further information please contact the following:

 

Empyrean Energy plc

Tom Kelly

Tel: +61 6146 5325

Cenkos Securities plc (Nominated Advisor and Broker)

Neil McDonald

Tel: +44 (0) 131 220 9771

Pete Lynch

Tel: +44 (0) 131 220 9772

 

First Equity Limited (Joint Broker)

Jason Robertson

Tel: +44 (0) 20 7330 1883

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFFDSWFEFSEDF
Date   Source Headline
13th Dec 20177:14 amRNSDirector Retirement
12th Dec 20173:15 pmRNSInterim Results
11th Dec 20179:46 amRNSDempsey and Sacramento Basin Q&A report
8th Dec 20177:57 amRNSDempsey 1-15 well production update
4th Dec 20177:38 amRNSDempsey Gas well update
14th Nov 20177:28 amRNSDempsey Gas Well Update
1st Nov 20177:12 amRNSDempsey Gas Well Update
4th Oct 20177:00 amRNSDempsey Gas Well Update
28th Sep 201712:26 pmRNSNew Company Website
18th Sep 20177:45 amRNSDempsey Gas Well to Flow Test Multiple Zones
13th Sep 20177:23 amRNSFurther Significant Gas Shows at Dempsey
12th Sep 201710:00 amRNSHolding(s) in Company
11th Sep 20171:03 pmRNSResults of AGM
11th Sep 201710:08 amRNSCorporate Presentation
8th Sep 20177:29 amRNSSignificant Gas Shows at Dempsey 1-15 Well
7th Sep 20177:00 amRNSSeismic Data Results Exceed Expectations
4th Sep 20177:26 amRNSSignificant Gas Shows Continue at Dempsey
1st Sep 20177:11 amRNSHolding(s) in Company
31st Aug 20177:22 amRNSSignificant Gas Shows Continue at Dempsey
30th Aug 20178:21 amRNSSignificant Gas Shows in reservoir at Dempsey
29th Aug 20177:00 amRNSSignificant Gas Shows
23rd Aug 20177:25 amRNS3D survey Completed in Block 29/11 Offshore China
21st Aug 20177:51 amRNSDempsey 1-15 Natural Gas Well Drilling Update
18th Aug 201710:17 amRNSPosting of Annual Report and Notice of AGM
15th Aug 20171:30 pmRNSFinal Results
14th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
9th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
3rd Aug 20177:37 amRNS1Tcf+ Dempsey Natural Gas Well Drilling Ahead
2nd Aug 20173:30 pmRNSRaises £1,000,000 before costs at 8.5p per share
1st Aug 20178:01 amRNSDrilling to commence at Dempsey Well, California
20th Jul 20177:47 amRNSOperations Update for 1+ Tcf Dempsey Gas Well
10th Jul 20177:02 amRNSDrilling Contract Signed for 1Tcf+ Dempsey Well
6th Jul 20177:10 amRNSDrilling Permit Granted for 1Tcf+ Dempsey Well
5th Jul 20178:09 amRNSCompletion of Mako Well and Stabilised Flow Rates
28th Jun 20177:38 amRNSMako South-1 Gas Flow Test Results
26th Jun 20177:48 amRNSMako South-1 Well Drilling and Testing Update
21st Jun 20177:53 amRNSIncreased interest in Sacramento Basin Projects
20th Jun 20175:31 pmRNSEmpyrean raises £660,000
19th Jun 201711:15 amRNSHolding(s) in Company
19th Jun 20178:17 amRNSMako South-1 Well Drilling Update
16th Jun 20177:45 amRNSProjects Update
15th Jun 20179:11 amRNSOperational Presentation
15th Jun 20178:00 amRNSHolding(s) in Company
14th Jun 20179:16 amRNSAppointment of Board Director
13th Jun 201711:10 amRNSPlacing and Option Exercise to Advance Portfolio
13th Jun 201710:00 amRNSOption Amendment
8th Jun 201711:00 amRNS3D Survey Commences on Block 29/11, China
30th May 201712:30 pmRNSProjects Update
15th May 20171:43 pmRNSMulti Project Farm-In, Sacramento Basin,California
15th May 20179:30 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.