Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.055    -0.0025 (-4.35%)
Bid:
0.05
Ask:
0.06
Spread: 0.01 (20.00%)
Market Cap: £3.15m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

CORRECTION: Sugarloaf Update

28 Feb 2011 08:48

RNS Number : 9550B
Empyrean Energy PLC
28 February 2011
Β 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

Β 

CORRECTION:Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Β 

The Company makes the following amendments to its announcement released at 07:16 on 28 February 20119 under RNS Number : 9466B: Working Interest in the Direct Assets #1H well is 3%, not 10% as originally stated. All other details remain the same and the full wording of the corrected announcement is reproduced below:

Β 

Β 

28 February 2011

Β 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

Β 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Β 

Β 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

Β 

Production Data

The following wells have been on production for a period of 60 days and Empyrean is pleased to provide the market with an update on the produced volumes during that period:-

Β 

Β 

Working Interest

Total Gas Production (mmscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Urrutia #1H

3%

102.3

35,084

869

Kowalik #1R

10.2%

90.2

28,825

731

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

Β 

Remedial operations on Direct Assets #1H well were successful and the well commenced production on 27/01/11 on a restricted choke setting. Over the most recently reported 5 day period the well averaged the following production rates.

Β 

Working Interest

Average Daily Gas Production (mmscf/d)

Average Daily Condensate Production (bbls/d)

Average Daily Equivalent Oil Rate (boe/d)*

Direct Assets #1H

3%

1.48

479

726

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

Due to the length of time between the fracture stimulation of this well and it being unloaded to sales, some of the pressures created during the stimulation process had bled off into the formation; this is a likely explanation of the lower early production rates observed in this well.

Β 

Β 

Operations

Β 

Holman #1H (3% WI)

This well has been drilled and cased with a Total Depth of 17,570 ft. The fracture stimulation of this well commenced on the 24th February 2011 and Empyrean will update the market when stabilized flow has been achieved.

Β 

Jordan #1H (3% WI)

This well has been drilled and cased with a Total Depth of 16,472 ft. This well will be fracture stimulated in due course and Empyrean will update the market when stabilized flow has been achieved.

Β 

PMT #1H (1.11% WI)

This well location lies across the Sugarloaf and neighbouring Hilcorp operated AMIs in which Empyrean does not participate. As such Empyrean holds a blended working interest of 1.11% in this well. The well spudded on 14/2/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

Β 

Buehring #1H (3.0% WI)

Drilling operations commenced on the 18/02/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

Β 

Β 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

Β 

Β 

Β 

Contact:

Β 

Empyrean Energy Plc

Tom Kelly Tel: +618 9388 8041

Β 

Shore Capital & Corporate Limited

Anita Ghanekar Tel: +44 (0) 20 7408 4090

Edward Mansfield

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCDMGZZRRZGMZG
Date   Source Headline
16th Jan 20207:11 amRNSEmpyrean raises £420,000
24th Dec 20199:03 amRNSInterim Results
24th Dec 20199:00 amRNS£10m Equity Placement Facility secured
22nd Nov 20197:45 amRNSDuyung PSC, Operational Update - Tambak -1
13th Nov 20197:00 amRNSDuyung PSC, Operational Update - Tambak -1
4th Nov 20198:00 amRNSOperational Update - Tambak -1 Well Spud
25th Oct 20197:15 amRNSDuyung PSC, Operational Update
15th Oct 20197:00 amRNSDuyung PSC, Ops Update - Tambak-2 Well reaches TD
4th Oct 20198:00 amRNSDuyung PSC, Ops Update - Tambak 2 Well Spud
26th Sep 20197:00 amRNSEmpyrean raises £365,580 before costs
24th Sep 20197:00 amRNSDuyung PSC, Operational Update
18th Sep 201911:28 amRNSGrant of Options and PDMR Notification
10th Sep 201910:45 amRNSResult of AGM
10th Sep 20198:00 amRNSCompany Presentation
19th Aug 20197:00 amRNSDuyung PSC, Operational Update
16th Aug 201910:30 amRNSNotice of AGM & Posting of Annual Report
9th Aug 20199:55 amRNSFinal Results
9th Jul 20198:00 amRNSExercise of Options
15th May 20197:00 amRNSFurther Exploration Risk Mitigation on China Block
29th Apr 20197:00 amRNSMako Gas Field appraisal & drill programme
17th Apr 20197:00 amRNSFirst Completion of Reduction of Duyung Interest
11th Mar 20197:00 amRNSPlan of Development Approval for Mako Gas Field
11th Feb 20197:00 amRNSReduction of Interest in Duyung for Cash & Shares
21st Jan 20197:25 amRNSIndependent Resource Audit of Mako Gas Field
21st Dec 20188:48 amRNSInterim Results
6th Dec 201812:26 pmRNSHolding(s) in Company
16th Nov 20188:11 amRNSA £1 Million Placement
9th Nov 20187:30 amRNSIndependent Oil in-place Estimates for Block 29/11
4th Oct 20189:46 amRNSDirector/PDMR Shareholding
1st Oct 20188:40 amRNSPetroleum Contract for Block 29/11 signed
5th Sep 201812:20 pmRNSResult of Annual General Meeting
5th Sep 20189:38 amRNSCompany Presentation
5th Sep 20187:00 amRNSThird-party Independent STOIIP Audit, Block 29/11
30th Aug 20187:00 amRNSAlvares 1 Testing and Operations Update
13th Aug 20187:38 amRNSIRS Tax Refund
10th Aug 20187:00 amRNSPosting of Annual Report and Notice of AGM
6th Aug 20187:00 amRNSFinal Results
3rd Aug 20187:46 amRNSOperations Update from Mako Gas Discovery
17th Jul 20187:37 amRNSTax refunds totalling $1.3 million
18th Jun 20187:50 amRNSOil Migration Study Completed - Block 29/11
6th Jun 20187:00 amRNS31% Uplift in Prospective Resources in Block 29/11
23rd May 20187:00 amRNSCommercial gas flows at ~1,200 mcfpd from Dempsey
8th May 20187:00 amRNSCommercial Gas Flows From Dempsey
3rd May 20189:10 amRNSHoldings in Company
16th Apr 20187:25 amRNSDempsey Testing Update
12th Mar 20187:10 amRNSDempsey Testing Update
8th Mar 20187:15 amRNSDempsey Production Testing to Resume
20th Feb 20182:45 pmRNSExercise of Options
30th Jan 201810:45 amRNSGrant of Options and PDMR Notification
17th Jan 20187:00 amRNSProduction & Sales from Dempsey Well Commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.