Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

CORRECTION: Sugarloaf Update

28 Feb 2011 08:48

RNS Number : 9550B
Empyrean Energy PLC
28 February 2011
 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

CORRECTION:Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

The Company makes the following amendments to its announcement released at 07:16 on 28 February 20119 under RNS Number : 9466B: Working Interest in the Direct Assets #1H well is 3%, not 10% as originally stated. All other details remain the same and the full wording of the corrected announcement is reproduced below:

 

 

28 February 2011

 

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker (EME))

 

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project within the Sugarkane Gas & Condensate Field, Texas.

 

Production Data

The following wells have been on production for a period of 60 days and Empyrean is pleased to provide the market with an update on the produced volumes during that period:-

 

 

Working Interest

Total Gas Production (mmscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Urrutia #1H

3%

102.3

35,084

869

Kowalik #1R

10.2%

90.2

28,825

731

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

 

Remedial operations on Direct Assets #1H well were successful and the well commenced production on 27/01/11 on a restricted choke setting. Over the most recently reported 5 day period the well averaged the following production rates.

 

Working Interest

Average Daily Gas Production (mmscf/d)

Average Daily Condensate Production (bbls/d)

Average Daily Equivalent Oil Rate (boe/d)*

Direct Assets #1H

3%

1.48

479

726

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

Due to the length of time between the fracture stimulation of this well and it being unloaded to sales, some of the pressures created during the stimulation process had bled off into the formation; this is a likely explanation of the lower early production rates observed in this well.

 

 

Operations

 

Holman #1H (3% WI)

This well has been drilled and cased with a Total Depth of 17,570 ft. The fracture stimulation of this well commenced on the 24th February 2011 and Empyrean will update the market when stabilized flow has been achieved.

 

Jordan #1H (3% WI)

This well has been drilled and cased with a Total Depth of 16,472 ft. This well will be fracture stimulated in due course and Empyrean will update the market when stabilized flow has been achieved.

 

PMT #1H (1.11% WI)

This well location lies across the Sugarloaf and neighbouring Hilcorp operated AMIs in which Empyrean does not participate. As such Empyrean holds a blended working interest of 1.11% in this well. The well spudded on 14/2/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

Buehring #1H (3.0% WI)

Drilling operations commenced on the 18/02/11 and Empyrean will provide the market with an update once the drilling of this well has been completed.

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

 

Contact:

 

Empyrean Energy Plc

Tom Kelly Tel: +618 9388 8041

 

Shore Capital & Corporate Limited

Anita Ghanekar Tel: +44 (0) 20 7408 4090

Edward Mansfield

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDMGZZRRZGMZG
Date   Source Headline
13th Dec 20177:14 amRNSDirector Retirement
12th Dec 20173:15 pmRNSInterim Results
11th Dec 20179:46 amRNSDempsey and Sacramento Basin Q&A report
8th Dec 20177:57 amRNSDempsey 1-15 well production update
4th Dec 20177:38 amRNSDempsey Gas well update
14th Nov 20177:28 amRNSDempsey Gas Well Update
1st Nov 20177:12 amRNSDempsey Gas Well Update
4th Oct 20177:00 amRNSDempsey Gas Well Update
28th Sep 201712:26 pmRNSNew Company Website
18th Sep 20177:45 amRNSDempsey Gas Well to Flow Test Multiple Zones
13th Sep 20177:23 amRNSFurther Significant Gas Shows at Dempsey
12th Sep 201710:00 amRNSHolding(s) in Company
11th Sep 20171:03 pmRNSResults of AGM
11th Sep 201710:08 amRNSCorporate Presentation
8th Sep 20177:29 amRNSSignificant Gas Shows at Dempsey 1-15 Well
7th Sep 20177:00 amRNSSeismic Data Results Exceed Expectations
4th Sep 20177:26 amRNSSignificant Gas Shows Continue at Dempsey
1st Sep 20177:11 amRNSHolding(s) in Company
31st Aug 20177:22 amRNSSignificant Gas Shows Continue at Dempsey
30th Aug 20178:21 amRNSSignificant Gas Shows in reservoir at Dempsey
29th Aug 20177:00 amRNSSignificant Gas Shows
23rd Aug 20177:25 amRNS3D survey Completed in Block 29/11 Offshore China
21st Aug 20177:51 amRNSDempsey 1-15 Natural Gas Well Drilling Update
18th Aug 201710:17 amRNSPosting of Annual Report and Notice of AGM
15th Aug 20171:30 pmRNSFinal Results
14th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
9th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
3rd Aug 20177:37 amRNS1Tcf+ Dempsey Natural Gas Well Drilling Ahead
2nd Aug 20173:30 pmRNSRaises £1,000,000 before costs at 8.5p per share
1st Aug 20178:01 amRNSDrilling to commence at Dempsey Well, California
20th Jul 20177:47 amRNSOperations Update for 1+ Tcf Dempsey Gas Well
10th Jul 20177:02 amRNSDrilling Contract Signed for 1Tcf+ Dempsey Well
6th Jul 20177:10 amRNSDrilling Permit Granted for 1Tcf+ Dempsey Well
5th Jul 20178:09 amRNSCompletion of Mako Well and Stabilised Flow Rates
28th Jun 20177:38 amRNSMako South-1 Gas Flow Test Results
26th Jun 20177:48 amRNSMako South-1 Well Drilling and Testing Update
21st Jun 20177:53 amRNSIncreased interest in Sacramento Basin Projects
20th Jun 20175:31 pmRNSEmpyrean raises £660,000
19th Jun 201711:15 amRNSHolding(s) in Company
19th Jun 20178:17 amRNSMako South-1 Well Drilling Update
16th Jun 20177:45 amRNSProjects Update
15th Jun 20179:11 amRNSOperational Presentation
15th Jun 20178:00 amRNSHolding(s) in Company
14th Jun 20179:16 amRNSAppointment of Board Director
13th Jun 201711:10 amRNSPlacing and Option Exercise to Advance Portfolio
13th Jun 201710:00 amRNSOption Amendment
8th Jun 201711:00 amRNS3D Survey Commences on Block 29/11, China
30th May 201712:30 pmRNSProjects Update
15th May 20171:43 pmRNSMulti Project Farm-In, Sacramento Basin,California
15th May 20179:30 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.