Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmerald Energy Regulatory News (EEN)

  • There is currently no data for EEN

Drilling Report

15 Jan 2009 07:00

RNS Number : 6600L
Emerald Energy PLC
15 January 2009
 



Emerald Energy Plc

15 January 2009

Operations Update

Emerald Energy Plc ("Emerald" or the "Company") would like to provide the following update on operations in Block 26, Syria.

Khurbet East No.7 Well

Drilling operations have been completed at the Khurbet East No.7 well in the Khurbet East field. The well was designed to delineate the north of the field, establish the oil-water contact and to have the potential to be used later as a water disposal well.

The well was drilled to a total depth of 2,060 metres and encountered the top of the Cretaceous Massive reservoir at approximately 1,978 metres. Good hydrocarbon shows were encountered across a 7 metre interval while drilling into the reservoir and gradually diminished over the next 13 metres. 

The reservoir porosities encountered in the Khurbet East No.7 well were measured mainly in the range of 5% to 10%, significantly lower than the exceptional reservoir quality encountered in the central portion of the field where porosities are in the range of 16 to 20%. Variations in reservoir properties such as these are not unusual in carbonate reservoir systems and this new information, combined with the production history to date, will be important in developing a more refined reservoir model. 

Preliminary analysis of the wireline logs is unable to directly establish an oil-water contact due to the generally higher resistivities measured in lower porosity reservoirs. Although the oil-water contact was not directly determined by the wireline logs, preliminary analysis of these logs and the drilling data together indicates that the oil-water contact in the field may be slightly deeper than previously interpreted.

The Khurbet East No.7 well was not production tested and was suspended for further evaluation in the future, which may include production testing, or for later use as a water disposal well. 

 

3D Seismic Survey

The acquisition of a 640 square kilometre 3D seismic survey has commenced. This survey is designed to provide contiguous data coverage over a large area surrounding the recent Khurbet East and Yousefieh oil discoveries, complementing the 3D seismic surveys acquired in this area in 2007. This survey will assist in progressing the new exploration play that has been confirmed by the Yousefieh discovery. The 3D seismic programme is expected to be completed in approximately 5 months, with final processed data available during the third quarter of this year.

Emerald's Chief Executive Officer, Angus MacAskill, said:

"The information gained from the Khurbet East No.7 well will, when combined with the excellent production performance to date, assist in better understanding this field and contribute to the ongoing reserves re-evaluation due to be completed in the first quarter of 2009. Acquisition of the 3D seismic survey is an important step in building on the success of the Yousefieh discovery in the new exploration play on Block 26."

Enquiries: Lisa Hibberd 020 7925 2440

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFEFWLSUSEFF
Date   Source Headline
14th Jul 20097:00 amRNSUpdate
13th Jul 20092:32 pmRNSRule 8.3- Emerald Energy Plc
13th Jul 20097:00 amRNSStatement regarding recent share price movement
30th Jun 200910:57 amRNSTotal Voting Rights
23rd Jun 20097:00 amRNSWell update
17th Jun 20093:09 pmRNSHolding(s) in Company
16th Jun 20097:00 amRNSOperations Update - Syria, Block 26
9th Jun 200911:58 amRNSShare award
9th Jun 20097:00 amRNSOperations Update
8th Jun 20094:27 pmRNSHolding(s) in Company
8th Jun 20097:00 amRNSSyrian Presentation
4th Jun 200911:01 amRNSHolding(s) in Company
29th May 200911:10 amRNSTotal Voting Rights
27th May 20097:00 amRNSOperations Update - Syria, Block 26
7th May 20092:29 pmRNSTotal Voting Rights
6th May 20097:00 amRNSOperations Update
30th Apr 20097:00 amRNSOperations Update - Syria, Block 26
24th Apr 20093:50 pmRNSResult of EGM
24th Apr 20093:48 pmRNSResult of AGM
24th Apr 20097:00 amRNSInterim Management Statement
23rd Apr 20097:00 amRNSOperations Update
22nd Apr 200910:35 amRNSHolding(s) in Company
20th Apr 200912:35 pmRNSHolding(s) in Company
15th Apr 20094:12 pmRNSConversion of Convertible Bonds
8th Apr 200911:55 amRNSAnnual Information Update
24th Mar 20097:00 amRNSDrilling Report
18th Mar 20091:05 pmRNSRule 9 waiver
18th Mar 200912:55 pmRNSNotice of documents for Inspection
18th Mar 200912:52 pmRNSDirector/PDMR Shareholding
16th Mar 20097:00 amRNSFinal Results
6th Mar 20097:00 amRNSDrilling Update
4th Mar 200910:00 amRNSOperations update
2nd Mar 20098:53 amRNSBlock listing six monthly return
24th Feb 20097:00 amRNSOperations update
11th Feb 20097:00 amRNSColombia - Operations Update
29th Jan 20099:19 amRNSNew Licence
26th Jan 20097:00 amRNSOperations Update
21st Jan 20098:00 amRNSDrilling Update
15th Jan 20097:00 amRNSDrilling Report
22nd Dec 20087:00 amRNSDrilling Update: Gigante No.2 Well
18th Dec 20084:35 pmRNSPrice Monitoring Extension
26th Nov 20082:52 pmRNSDirectorate Change
25th Nov 20084:39 pmRNSPrice Monitoring Extension
19th Nov 20087:00 amRNSYousefieh No.1 Exploration Well Result, Block 26
11th Nov 200810:59 amRNSDrilling results correction
10th Nov 20087:00 amRNSCapella Number 2 Drilling Results
5th Nov 200810:25 amRNSDrilling Report - Correction
5th Nov 20087:50 amRNSDrilling Report
20th Oct 20087:00 amRNSInterim Management Statement
6th Oct 20087:21 amRNSDrilling Commences on Yousefieh-1 Exploration Well

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.