Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmerald Energy Regulatory News (EEN)

  • There is currently no data for EEN

Operations Update

6 May 2009 07:00

RNS Number : 7309R
Emerald Energy PLC
06 May 2009
 



Emerald Energy Plc

6 May 2009

Operations Update - Syria, Block 26

Emerald Energy Plc ("Emerald" or the "Company") is pleased to provide the following update on operations in Block 26, Syria. 

Khurbet East No.9 Development Well

The Khurbet East No.9 well, located approximately one kilometre south of the Khurbet East No.1 well and planned as the first of three development wells to support the expansion of the Khurbet East early production facility, has been drilled vertically to a total depth of 1,986 metres. The well encountered the top of the Cretaceous Massive reservoir at 1,937 metres and preliminary analysis of the wire-line logs indicates a 26 metre gross (23 metre net) oil-bearing interval within this reservoir with an average porosity over the net oil-bearing section of approximately 22%. A definitive oil-water contact was not identified in the well as the primary reservoir section lies directly above a relatively impermeable and low porosity section.

During the final 12 hours of a 24 hour open-hole flow test of the gross reservoir interval, the well flowed, under natural flow, at an average stabilised oil rate of approximately 3,040 barrels per day through a 48/64 inch choke and with a water cut of between 3% and 4%. Preliminary analysis of the flow test indicates very good reservoir permeability, consistent with the production wells in the central portion of the Khurbet East Field.

The Khurbet East No.9 well will be completed as a production well and tied-in to the early production facility. After completion of operations on Khurbet East No.9, the rig will commence drilling of the Khurbet East No.10 wellthe second of the three development wells planned to support the expansion of the early production facility.

Expansion of Khurbet East Early Production Facility

The expansion of the capacity of the early production facility to 18,000 barrels per day is proceeding on schedule with commissioning of the new equipment expected to commence in June and production start-up expected early in the third quarter of 2009

Exploration 3D Seismic Survey

Acquisition of the 850 square kilometre 3D seismic survey in the area around the Khurbet East and Yousefieh fields continues on schedule, with approximately 90% of the area completed. The Company expects the programme will be completed this month, with delivery of final processed data expected late in the third quarter of 2009 and interpretation of these data commencing immediately thereafter.

Emerald's Chief Executive Officer, Angus MacAskill, said:

"We are very pleased with progress towards delivery of the early production facility expansion, with the results of Khurbet East No.9, the first of three development wells planned to fill the additional capacity, demonstrating the southern extension of the excellent reservoir quality seen in the central portion of the field. We are also pleased with the progress in acquiring this large exploration 3D seismic survey and look forward to the results of the interpretation of these data later in the year."

Enquiries: Lisa Hibberd 020 7925 2440

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQELFBKEBEBBD
Date   Source Headline
9th Oct 200912:31 pmRNSHolding(s) in Company
7th Oct 20093:49 pmRNSDirector/PDMR Shareholding
7th Oct 200911:38 amRNSCourt Sanction of the Scheme of Arrangement
7th Oct 20099:32 amRNSEPT Disclosure
7th Oct 20097:30 amRNSSuspension Emerald Energy
6th Oct 20096:11 pmRNSSuspension of trading & list of ordinary shares
6th Oct 200912:51 pmRNSRule 8.3- Emerald Energy PLC
5th Oct 20092:08 pmBUSRule 8.3 - Emerald Energy Plc
5th Oct 20091:53 pmRNSHolding(s) in Company
5th Oct 20091:45 pmRNSRule 8.3- Emerald Energy Plc
5th Oct 200912:21 pmRNSRule 8.3- Emerald Energy
5th Oct 20099:04 amRNSEPT Disclosure
2nd Oct 20094:40 pmRNSHolding(s) in Company
2nd Oct 200912:41 pmRNSRecommended all cash acqn of Emerald by Sinochem
2nd Oct 200912:05 pmRNSRule 8.3- Emerald Energy
2nd Oct 20098:38 amRNSEPT Disclosure
2nd Oct 20097:00 amRNSOperations update
1st Oct 20091:25 pmRNSHolding(s) in Company
1st Oct 20091:11 pmBUSRule 8.3 - Emerald Energy Plc
1st Oct 20099:09 amRNSEPT Disclosure
30th Sep 20093:16 pmBUSRule 8.3 - Emerald Energy Plc
30th Sep 200911:44 amRNSRule 8.3- Emerald Energy
29th Sep 20092:34 pmBUSRule 8.3 - Emerald Energy Plc
28th Sep 20093:23 pmBUSRule 8.3 - Emerald Energy Plc
28th Sep 20091:07 pmRNSRule 8.3- Emeral Energy PLC
28th Sep 200910:10 amRNSEPT Disclosure
25th Sep 20093:31 pmBUSRule 8.3 - Emerald Energy Plc
25th Sep 20091:41 pmRNSRule 8.3- Emerald Energy PLC
24th Sep 20091:14 pmRNSRule 8.3 - Emerald Energy PLC
24th Sep 200911:56 amRNSRule 8.3- Emerald Energy
23rd Sep 20092:16 pmRNSRule 8.3 - Emerald Energy PLC
23rd Sep 200911:49 amRNSRule 8.3- Emerald Energy Plc
22nd Sep 20093:21 pmRNSHolding(s) in Company
22nd Sep 20091:01 pmRNSRule 8.3- Emerald Energy PLC
22nd Sep 20097:00 amRNSOperations update
21st Sep 20091:39 pmRNSRule 8.3 - Emerald Energy PLC
21st Sep 200911:03 amRNSEPT Disclosure
21st Sep 20099:52 amRNSRule 8.3- (Emerald Energy Plc)
18th Sep 200912:46 pmRNSRule 8.3- Emerald Energy PLC
17th Sep 20092:04 pmRNSRule 8.3- Emerald Energy PLC
17th Sep 200912:44 pmRNSRule 8.3- Emerald Energy Plc
17th Sep 200910:08 amRNSEPT Disclosure
17th Sep 20097:00 amRNSOperations update
16th Sep 20092:12 pmRNSRule 8.3- Emerald Energy PLC
15th Sep 20092:37 pmRNSRule 8.3- Emerald Energy PLC
15th Sep 20092:04 pmRNSHolding(s) in Company
14th Sep 20091:41 pmRNSRule 8.3- Emerald Energy PLC
10th Sep 20092:38 pmRNSRule 8.3- Emerald Energy Plc
10th Sep 20091:20 pmRNSRule 8.3- Emerald Energy-Replacement
10th Sep 200910:45 amRNSRule 8.3- Emerald Energy Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.