Operations update

4 Mar 2009 10:00

RNS Number : 2878O
Emerald Energy PLC
04 March 2009
 



Emerald Energy Plc

March 2009

Operations Update - Syria, Block 26

Emerald Energy Plc ("Emerald" or the "Company") would like to advise that Gulfsands Petroleum Plc ("Gulfsands"), the Operator in Block 26, Syria, will today host an analyst presentation which will include technical aspects of the Block 26 asset. A copy of their presentation will be available on the Gulfsands website (www.gulfsands.com). The presentation will contain the following new information which has not previously been announced.

Khurbet East No.8 Well Spud

Drilling operations have commenced on the Khurbet East No.8 delineation well in the Khurbet East Field. The well is designed to provide geologic information on the southern limits of the Khurbet East Field, establish the oil-water contact and to have the potential to be used as a water disposal well in the future. The Khurbet East No.8 well is expected to take approximately 45 days to drill and evaluate.

Yousefieh Preliminary Volumetrics

Based on a preliminary evaluation of the data acquired in the Yousefieh No.1 discovery well and the Yousefieh No.2 appraisal well, Gulfsands estimates the range of oil initially in placeon a gross basis at stock tank conditions, to be 27.2 (P90), 48.5 (P50) and 73.9 (P10) million barrels. Further work is required to determine the expected range of recovery factors and, hence, recoverable reserves.

The Operator plans to submit a commerciality application for the Yousefieh discovery and, in the third quarter of 2009, to drill a second appraisal well.

Khurbet East Field Production and Development

Gross oil production from the Khurbet East field averaged 8,470 barrels per day during the 163 day period between commencement of production and the end of 2008 (unaudited)The average sale price during this period was US$ 61 per barrel (unaudited).

During 2009, Gulfsands expects gross oil production to average between 12,500 and 13,000 barrels per day with a rate at the end of the year of approximately 16,000 barrels per day. Gross development capital expenditure is expected to be US$ 37 million, consisting of development wells (Khurbet East Nos. 8, 9, 10 and 11 at a total cost of US$ 14 million), full field development facilities for Khurbet East (US$ 20 million) and miscellaneous items (US$ 3.5 million). The total cost of the full field development facilities for Khurbet East, to be incurred in 2009 and 2010, is estimated to be in the range of US$ 45 to 50 million. The Operator estimates that the Khurbet East field may be fully developed with a total of 15 production wells, including the existing 5 wells currently on production and 3 production wells expected to be drilled in 2009. 

Exploration Activities 

Gulfsands expects gross exploration and appraisal capital expenditure in 2009 to be approximately US$ 22 million, consisting of 3 wells (Yousefieh No.2, Yousefieh No.3, and one further exploration well at a total cost of US$ 12 million) and the 3D seismic survey currently being acquired (US$ 10 million).

The area of the 3D seismic survey has been increased to approximately 850 square kilometres to tie into existing 3D seismic surveys in the area and to assist in better understanding the new exploration play demonstrated by the Yousefieh discovery.

Enquiries: Lisa Hibberd 020 7925 2440

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKZLBBKXBLBBK
Date   Source Headline
9th Oct 200912:31 pmRNSHolding(s) in Company
7th Oct 20093:49 pmRNSDirector/PDMR Shareholding
7th Oct 200911:38 amRNSCourt Sanction of the Scheme of Arrangement
7th Oct 20099:32 amRNSEPT Disclosure
7th Oct 20097:30 amRNSSuspension Emerald Energy
6th Oct 20096:11 pmRNSSuspension of trading & list of ordinary shares
6th Oct 200912:51 pmRNSRule 8.3- Emerald Energy PLC
5th Oct 20092:08 pmBUSRule 8.3 - Emerald Energy Plc
5th Oct 20091:53 pmRNSHolding(s) in Company
5th Oct 20091:45 pmRNSRule 8.3- Emerald Energy Plc
5th Oct 200912:21 pmRNSRule 8.3- Emerald Energy
5th Oct 20099:04 amRNSEPT Disclosure
2nd Oct 20094:40 pmRNSHolding(s) in Company
2nd Oct 200912:41 pmRNSRecommended all cash acqn of Emerald by Sinochem
2nd Oct 200912:05 pmRNSRule 8.3- Emerald Energy
2nd Oct 20098:38 amRNSEPT Disclosure
2nd Oct 20097:00 amRNSOperations update
1st Oct 20091:25 pmRNSHolding(s) in Company
1st Oct 20091:11 pmBUSRule 8.3 - Emerald Energy Plc
1st Oct 20099:09 amRNSEPT Disclosure
30th Sep 20093:16 pmBUSRule 8.3 - Emerald Energy Plc
30th Sep 200911:44 amRNSRule 8.3- Emerald Energy
29th Sep 20092:34 pmBUSRule 8.3 - Emerald Energy Plc
28th Sep 20093:23 pmBUSRule 8.3 - Emerald Energy Plc
28th Sep 20091:07 pmRNSRule 8.3- Emeral Energy PLC
28th Sep 200910:10 amRNSEPT Disclosure
25th Sep 20093:31 pmBUSRule 8.3 - Emerald Energy Plc
25th Sep 20091:41 pmRNSRule 8.3- Emerald Energy PLC
24th Sep 20091:14 pmRNSRule 8.3 - Emerald Energy PLC
24th Sep 200911:56 amRNSRule 8.3- Emerald Energy
23rd Sep 20092:16 pmRNSRule 8.3 - Emerald Energy PLC
23rd Sep 200911:49 amRNSRule 8.3- Emerald Energy Plc
22nd Sep 20093:21 pmRNSHolding(s) in Company
22nd Sep 20091:01 pmRNSRule 8.3- Emerald Energy PLC
22nd Sep 20097:00 amRNSOperations update
21st Sep 20091:39 pmRNSRule 8.3 - Emerald Energy PLC
21st Sep 200911:03 amRNSEPT Disclosure
21st Sep 20099:52 amRNSRule 8.3- (Emerald Energy Plc)
18th Sep 200912:46 pmRNSRule 8.3- Emerald Energy PLC
17th Sep 20092:04 pmRNSRule 8.3- Emerald Energy PLC
17th Sep 200912:44 pmRNSRule 8.3- Emerald Energy Plc
17th Sep 200910:08 amRNSEPT Disclosure
17th Sep 20097:00 amRNSOperations update
16th Sep 20092:12 pmRNSRule 8.3- Emerald Energy PLC
15th Sep 20092:37 pmRNSRule 8.3- Emerald Energy PLC
15th Sep 20092:04 pmRNSHolding(s) in Company
14th Sep 20091:41 pmRNSRule 8.3- Emerald Energy PLC
10th Sep 20092:38 pmRNSRule 8.3- Emerald Energy Plc
10th Sep 20091:20 pmRNSRule 8.3- Emerald Energy-Replacement
10th Sep 200910:45 amRNSRule 8.3- Emerald Energy Plc

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.