Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

Share Price is delayed by 15 minutes
Get Live Data
33.60    -0.60 (-1.75%)
Bid:
33.20
Ask:
34.00
Spread: 0.80 (2.41%)
Market Cap: £247.82m
EEE Live PriceLast checked at - London Stock Exchange

Intraday Empire Metals Share Chart

Drilling Recommences at Eclipse Gold Project

27 Apr 2021 07:00

RNS Number : 6324W
Empire Metals Limited
27 April 2021
 

To view the announcement with the illustrative images please use the following link: http://www.rns-pdf.londonstockexchange.com/rns/6324W_1-2021-4-26.pdf

 

Empire Metals Limited / AIM: EEE / Sector: Natural Resources

27 April 2021

EMPIRE METALS LIMITED

Drilling Recommences Alongside Initial Non-Compliant Resource andOther Studies at Eclipse Gold Project

Empire Metals Limited ('Empire' or the 'Company'), the AIM-quoted exploration and resource development company, is pleased to confirm that the next phase of works at the Company's Eclipse Gold Project, located 55km north-east of Kalgoorlie, Western Australia ('Eclipse' or the 'Project'), as announced on 17 March 2021, has commenced.

Drill Programme

The fully funded drill programme is focussed on two main objectives:

1. Resource drilling at Eclipse Mine target - 200m of diamond drilling in three holes to duplicate selected recent reverse circulation ("RC") drillholes for resource estimation purposes, to enable initial geotechnical core logging as input to a preliminary pit design, and to provide samples for metallurgical testing.

2. Expansion drilling at new Jack's Dream discovery - 1,700m of RC drilling in 17 holes, mainly focussed on infill drilling adjacent to wide intersections of mineralisation and high-grade intercepts around the Jack's Dream workings, north-west of the Eclipse shaft, to further expand the mineralisation and potential resources.

 

Maiden Resource at Eclipse

An initial non-compliant resource has been prepared for the Eclipse shaft area. The non-compliant resource, based on a cut-off grade of 1.3 g/t Au and a minimum downhole length of 2m, is below.

Tonnes

Au (g/t) (cut*)

Au ounces (cut*)

92,913

2.25

6,706

* The data was top-cut at 22 g/t Au

The current diamond drilling and other works (metallurgical testing etc) will enable an updated resource estimate to be prepared, compliant with JORC 2012.

Eclipse Mine Target

Work is also continuing at the Eclipse Mine Target on optimisations for a potential open pit which may be suitable for initial trial mining utilising toll treatment. Metallurgical test work on samples from the diamond drill programme will also feed into these studies along with geotechnical logging to confirm slope design assumptions, and an initial environmental study which is currently underway.

Mike Struthers, Director of Empire Metals, said: "This next phase of drilling around the Jack's Dream old workings will be especially interesting to see if we can extend the wide near-surface mineralised intercepts we reported previously. There is potential for this to become a satellite to the Eclipse Mine target, expanding the resources and open pit mining opportunity.

"Meanwhile our work on resources, pit optimisations and related studies at the Eclipse Mine target continues. Initial assessments indicate an open pit operation at Eclipse would fall within the small-scale mining legislation in Western Australia, which provides a fast-track route to production whilst minimising the environmental footprint, but further technical data are required to confirm certain design assumptions. The trial mining route, utilising toll treatment, would provide invaluable metallurgical and operational data.

"We look forwards to updating the market as results from drilling and other works becomes available."

Competent Person

The technical information in this report that relates to the Eclipse Gold Project has been compiled by Mr Darryl Mapleson, a full-time employee of BM Geological Services. Mr Mapleson is a Fellow of the Australian Institute of Mining and Metallurgy. Mr Mapleson has been engaged as a consultant by Empire Metals Limited. Mr Mapleson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Mapleson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

**ENDS**

 

For further information please visit www.empiremetals.co.uk or contact:

 

Mike Struthers

Empire Metals Ltd

Company

Tel: 020 7907 9327

Ewan Leggat

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Adam Cowl

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Damon Heath

Shard Capital Partners LLP

Joint Broker

Tel: 020 7186 9950

Susie Geliher

St Brides Partners Ltd

PR

Tel: 020 7236 1177

Cosima Akerman

St Brides Partners Ltd

PR

Tel: 020 7236 1177

About Empire Metals Limited

Empire Metals' primary focus is on the Eclipse Gold Project in Western Australia which produced 954 tonnes @ 24.6 g/t Au for 754.25 oz Au from the Eclipse shaft which operated up to 1910. Empire owns 75% of Eclipse with a right to acquire a further 25%.

 

The Company also has a 50% joint venture in Georgia which covers an area of over 860 sq km and has a 30-year mining licence. The joint venture covers a variety of targets and projects ranging from greenfield exploration / target definition phase through intermediate target-testing phases to more advanced projects including Kvemo Bolnisi East which is due to advance to Feasibility Study.

 

The Board continues to evaluate opportunities through which to realise the value of its wider portfolio and reviews further assets which meet the Company's investment criteria.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLUNVSRAAUSUAR
Date   Source Headline
16th Feb 20172:35 pmRNSDirector Dealings
13th Feb 20177:00 amRNSSignificant drill intercepts at Kvemo Bolnisi
30th Jan 20177:00 amRNSSignificant Mineral Resources at KB, Georgia
6th Jan 20179:37 amRNSHolding in Company
12th Dec 20163:35 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
25th Nov 20168:30 amRNSCommences Drilling at Kvemo Bolnisi Project
16th Nov 20167:00 amRNSPlacing to Raise £2.6m
20th Oct 20167:00 amRNSDrill Results at the Kvemo Bolnisi Project
10th Oct 201610:42 amRNSUpdate re Change of Name
10th Oct 20167:00 amRNSChange of Name and New Corporate Website
6th Oct 20167:00 amRNSCompletion of Consolidation
29th Sep 20167:00 amRNSChange of Name & Consolidation
27th Sep 20167:00 amRNSInterim Results
6th Sep 20167:00 amRNSBoard Changes
11th Aug 20167:00 amRNSSignificantly Increases Size of Au & Cu Target
20th Jul 20162:30 pmRNSGrant of Options and Director Shareholding
1st Jul 20167:00 amRNSAgreement to Acquire Interest in Georgian Prospect
23rd Jun 20167:00 amRNSCommencement of Drilling on Copper Target, Bolnisi
23rd May 20163:45 pmRNSResult of AGM
12th May 201610:00 amRNSCommencement of Infill Drilling at Kvemo Bolnisi
5th May 20167:00 amRNSCommencement of Drilling at Tsitel Sopeli
21st Apr 20167:00 amRNSNotice of AGM and Posting of Report and Accounts
20th Apr 20167:00 amRNSFinal Results
6th Apr 20167:00 amRNSCompletion of Drilling at Kvemo Bolnisi
9th Mar 201610:15 amRNSAppointment of Joint Broker
9th Mar 20167:00 amRNSOperations Update - Bolnisi Project in Georgia
10th Feb 20161:41 pmRNSHolding in Company
4th Feb 20167:00 amRNSInitial Drill Results at Kvemo Bolnisi, Georgia
28th Jan 20167:00 amRNSRaises £1m to Advance Production Targets, Bolnisi
17th Dec 20157:00 amRNSDrilling Commences at Kvemo Bolnisi, Georgia
25th Nov 201510:25 amRNSHolding(s) in Company
19th Nov 20157:00 amRNSNew Copper Discovery at Kvemo Bolnisi, Georgia
17th Nov 20157:00 amRNSPositive Results from Bolnisi Copper Gold Project
28th Oct 20157:00 amRNSDirector Dealing
27th Oct 201511:50 amRNSNew Corporate Presentation
27th Oct 20157:00 amRNSHigh Grade Gold Confirmed at Bolnisi Project
7th Oct 20157:00 amRNSPositive Mapping and Sampling Results at Walchen
29th Sep 20157:00 amRNSExploration Update - Bolnisi Project, Georgia
14th Sep 20157:00 amRNSInterim Results
7th Sep 20157:00 amRNSAppointment of Senior Advisor
24th Jul 20152:15 pmRNSHolding(s) in Company
22nd Jul 20157:00 amRNSPositive Mapping and Sampling Results, Walchen
17th Jul 20159:20 amRNSDirector Dealing
15th Jul 20157:00 amRNSTransformational Acquisition
22nd Jun 201511:15 amRNSResult of AGM
9th Jun 20157:00 amRNSFinal Results
26th May 20157:01 amRNSWalchen Update
20th Apr 20157:00 amRNSCommences First Phase of Exploration at Walchen
24th Mar 20157:00 amRNSPlacing to Directors
23rd Mar 20152:23 pmRNSAcquisition, Placing and Schonberg Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.