Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpire Metals Regulatory News (EEE)

Share Price Information for Empire Metals (EEE)

Share Price is delayed by 15 minutes
Get Live Data
32.60    -1.60 (-4.68%)
Bid:
32.60
Ask:
33.65
Spread: 1.05 (3.221%)
Market Cap: £240.44m
EEE Live PriceLast checked at - London Stock Exchange

Intraday Empire Metals Share Chart

Drilling Recommences at Eclipse Gold Project

27 Apr 2021 07:00

RNS Number : 6324W
Empire Metals Limited
27 April 2021
Β 

To view the announcement with the illustrative images please use the following link:Β http://www.rns-pdf.londonstockexchange.com/rns/6324W_1-2021-4-26.pdf

Β 

Empire Metals Limited / AIM: EEE / Sector: Natural Resources

27 April 2021

EMPIRE METALS LIMITED

Drilling Recommences Alongside Initial Non-Compliant Resource andOther Studies at Eclipse Gold Project

Empire Metals Limited ('Empire' or the 'Company'), the AIM-quoted exploration and resource development company, is pleased to confirm that the next phase of works at the Company's Eclipse Gold Project, located 55km north-east of Kalgoorlie, Western Australia ('Eclipse' or the 'Project'), as announced on 17 March 2021, has commenced.

Drill Programme

The fully funded drill programme is focussed on two main objectives:

1. Resource drilling at Eclipse Mine target - 200m of diamond drilling in three holes to duplicate selected recent reverse circulation ("RC") drillholes for resource estimation purposes, to enable initial geotechnical core logging as input to a preliminary pit design, and to provide samples for metallurgical testing.

2. Expansion drilling at new Jack's Dream discovery - 1,700m of RC drilling in 17 holes, mainly focussed on infill drilling adjacent to wide intersections of mineralisation and high-grade intercepts around the Jack's Dream workings, north-west of the Eclipse shaft, to further expand the mineralisation and potential resources.

Β 

Maiden Resource at Eclipse

An initial non-compliant resource has been prepared for the Eclipse shaft area. The non-compliant resource, based on a cut-off grade of 1.3 g/t Au and a minimum downhole length of 2m, is below.

Tonnes

Au (g/t) (cut*)

Au ounces (cut*)

92,913

2.25

6,706

* The data was top-cut at 22 g/t Au

The current diamond drilling and other works (metallurgical testing etc) will enable an updated resource estimate to be prepared, compliant with JORC 2012.

Eclipse Mine Target

Work is also continuing at the Eclipse Mine Target on optimisations for a potential open pit which may be suitable for initial trial mining utilising toll treatment. Metallurgical test work on samples from the diamond drill programme will also feed into these studies along with geotechnical logging to confirm slope design assumptions, and an initial environmental study which is currently underway.

Mike Struthers, Director of Empire Metals, said: "This next phase of drilling around the Jack's Dream old workings will be especially interesting to see if we can extend the wide near-surface mineralised intercepts we reported previously. There is potential for this to become a satellite to the Eclipse Mine target, expanding the resources and open pit mining opportunity.

"Meanwhile our work on resources, pit optimisations and related studies at the Eclipse Mine target continues. Initial assessments indicate an open pit operation at Eclipse would fall within the small-scale mining legislation in Western Australia, which provides a fast-track route to production whilst minimising the environmental footprint, but further technical data are required to confirm certain design assumptions. The trial mining route, utilising toll treatment, would provide invaluable metallurgical and operational data.

"We look forwards to updating the market as results from drilling and other works becomes available."

Competent Person

The technical information in this report that relates to the Eclipse Gold Project has been compiled by Mr Darryl Mapleson, a full-time employee of BM Geological Services. Mr Mapleson is a Fellow of the Australian Institute of Mining and Metallurgy. Mr Mapleson has been engaged as a consultant by Empire Metals Limited. Mr Mapleson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Mapleson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Β 

**ENDS**

Β 

For further information please visit www.empiremetals.co.uk or contact:

Β 

Mike Struthers

Empire Metals Ltd

Company

Tel: 020 7907 9327

Ewan Leggat

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Adam Cowl

S. P. Angel Corporate Finance LLP

Nomad & Broker

Tel: 020 3470 0470

Damon Heath

Shard Capital Partners LLP

Joint Broker

Tel: 020 7186 9950

Susie Geliher

St Brides Partners Ltd

PR

Tel: 020 7236 1177

Cosima Akerman

St Brides Partners Ltd

PR

Tel: 020 7236 1177

About Empire Metals Limited

Empire Metals' primary focus is on the Eclipse Gold Project in Western Australia which produced 954 tonnes @ 24.6 g/t Au for 754.25 oz Au from the Eclipse shaft which operated up to 1910. Empire owns 75% of Eclipse with a right to acquire a further 25%.

Β 

The Company also has a 50% joint venture in Georgia which covers an area of over 860 sq km and has a 30-year mining licence. The joint venture covers a variety of targets and projects ranging from greenfield exploration / target definition phase through intermediate target-testing phases to more advanced projects including Kvemo Bolnisi East which is due to advance to Feasibility Study.

Β 

The Board continues to evaluate opportunities through which to realise the value of its wider portfolio and reviews further assets which meet the Company's investment criteria.

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
DRLUNVSRAAUSUAR
Date   Source Headline
22nd Jun 20227:00 amRNSCommencement of Drilling at Eclipse-Gindalbie
20th Jun 20227:00 amRNSExploration Activities Commence: Pitfield Project
13th Jun 20227:00 amRNSBoard Change
9th Jun 20227:00 amRNSOnline Investor Presentation
6th Jun 20227:00 amRNSDrilling to Target High-Grade: Eclipse-Gindalbie
16th May 20227:00 amRNSExploration Update for the Eclipse Gold Project
4th May 20227:00 amRNSInvestor Presentation
28th Apr 20228:08 amRNSPlacing to Raise £1.7M to Accelerate Exploration
27th Apr 20227:00 amRNSInvestor Presentation
25th Apr 202211:00 amRNSPrice Monitoring Extension
22nd Apr 20222:06 pmRNSSecond Price Monitoring Extn
22nd Apr 20222:00 pmRNSPrice Monitoring Extension
20th Apr 20229:00 amRNSGrant of Options and Director Shareholding
13th Apr 202210:00 amRNSCompletion of Acquisition: Pitfield Cu-Au Project
6th Apr 20227:00 amRNSAcquisition of Highly Prospective Cu-Au Projects
30th Mar 202211:05 amRNSSecond Price Monitoring Extn
30th Mar 202211:00 amRNSPrice Monitoring Extension
30th Mar 20227:00 amRNSVery High-Grade Intercepts Reported at Gindalbie
17th Mar 20227:00 amRNSExploration Update for the Eclipse Gold Project
24th Feb 20227:00 amRNSGindalbie Project Update
14th Feb 20224:41 pmRNSSecond Price Monitoring Extn
14th Feb 20224:36 pmRNSPrice Monitoring Extension
11th Feb 20224:41 pmRNSSecond Price Monitoring Extn
11th Feb 20224:36 pmRNSPrice Monitoring Extension
11th Feb 20222:06 pmRNSSecond Price Monitoring Extn
11th Feb 20222:01 pmRNSPrice Monitoring Extension
10th Feb 20224:41 pmRNSSecond Price Monitoring Extn
10th Feb 20224:36 pmRNSPrice Monitoring Extension
8th Feb 20227:08 amRNSEmpire to Focus on Eclipse and Gindalbie Projects
7th Feb 202212:26 pmRNSHolding(s) in Company
28th Jan 202212:14 pmRNSUpdate on Central Menzies Gold Project
26th Jan 20227:19 amRNSTribute Agreement for the Eclipse Gold Project
20th Dec 20217:00 amRNSExploration Update for the Eclipse Gold Project
2nd Dec 20217:00 amRNSPhase 2 Drilling Commences at Central Menzies
3rd Nov 202111:06 amRNSSecond Price Monitoring Extn
3rd Nov 202111:00 amRNSPrice Monitoring Extension
3rd Nov 20217:00 amRNSDrill Results for the Central Menzies Gold Project
12th Oct 20217:00 amRNSInvestor Presentation
1st Oct 20217:00 amRNSSoil Sampling Results - Central Menzies Project
30th Sep 20217:00 amRNSInterim Results
15th Sep 20217:00 amRNSTechnical update for the Eclipse Gold Project
9th Sep 20217:00 amRNSDrilling Commences at the Central Menzies Project
7th Sep 20217:11 amRNSAppointment of Key Personnel to Exploration Team
31st Aug 20215:12 pmRNSHolding(s) in Company
31st Aug 20217:00 amRNSDirector Dealings
25th Aug 202111:05 amRNSSecond Price Monitoring Extn
25th Aug 202111:00 amRNSPrice Monitoring Extension
25th Aug 20217:00 amRNSProgress update for the Eclipse Gold Project
19th Aug 20217:00 amRNSDrilling to Commence: Central Menzies Gold Project
28th Jul 20217:00 amRNSIdentification of new Twin Shafts Lode at Eclipse

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.