Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.23
Ask:
0.26
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Update Re SLM Gold Project

14 May 2015 07:00

The directors of ECR Minerals plc (the “Directors”) are pleased to provide the following update with regard to the SLM gold project in La Rioja Province, Argentina. The SLM project is 100% held by ECR’s wholly owned Argentine subsidiary Ochre Mining SA (“Ochre”).

A privately owned Argentine company named Esperanza Resources SA (“Esperanza”) has constructed and is in the process of commissioning a mineral processing plant (the “Plant”) in the Sierra de las Minas region of La Rioja. The Plant is configured to recover gold via gravity and flotation processes and is located approximately 4km, 9km and 44km (straight line distances) from Ochre’s JV, Maestro Agüero and El Abra gold prospects, respectively. Estimated distances by road are 8km, 12km and 79km, respectively.

The Plant was visited last week by Stephen Clayson, CEO of ECR, and a meeting was held with the owners and managers of Esperanza. A non-binding memorandum of understanding (the “MoU”) was signed between Esperanza and Ochre which provides for the parties to hold discussions aimed at forming a joint venture or other commercial arrangement for the processing of ore from Ochre’s licence areas by Esperanza.

There can be no assurance that such discussions will reach a satisfactory conclusion or that any arrangement will be entered into. Ochre will therefore continue to investigate the viability and economics of other potential processing options, such as heap leaching. Extraction of ore from any of Ochre’s licence areas and the development of any processing facility by Ochre would be subject to the necessary permits, including environmental permits, being obtained. No such permits have yet been applied for.

However, the Directors consider that the existence of the Plant and the willingness of the owners and managers thereof to enter into discussions with Ochre may constitute a significant opportunity in the context of the Company’s stated exploration strategy for the SLM project, which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis. A further announcement will be made in due course, following the conclusion of discussions with Esperanza.

Ochre has been advised that the Plant is targeting total processing capacity of 50 tonnes of ore per day by the end of year, although there is no guarantee this target will be achieved or that capacity will be available to process ore from Ochre’s licence areas. The Plant is presently processing ore extracted from a licence area located to the east of Ochre’s JV prospect.

Further to the Company’s announcement of 1 May 2015, geological mapping at the JV prospect will commence in the second half of May 2015 as planned. The results of bulk sampling carried out at the Maestro Agüero prospect in March 2015 are now expected in the first half of June 2015. Both the mapping and bulk sampling results will inform discussions with Esperanza and decisions by ECR as to the next steps for the SLM project.

Stephen Clayson, Chief Executive Officer of ECR, commented:

“It is encouraging to see the development of a modern processing plant close to Ochre’s gold prospects. The Plant is not located immediately adjacent to any deposit and has good road access for the trucking of feed material from various sources. Whilst there is no certainty at this stage that Ochre will enter into an agreement with Esperanza, we believe the potential synergy between Esperanza’s operations and our strategy for the SLM project area is readily apparent, as is the potential for cooperation between Ochre and Esperanza to enable that strategy to develop more quickly.”

This announcement has been reviewed by Richard Watts B.Eng. Mining, Fellow of the South African Institute of Mining & Metallurgy, a director of the Company with more than 40 years of experience in the mining industry.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
Paul Johnson, Non-Executive Chairman
Stephen Clayson, Director & CEO
Richard (Dick) Watts, Technical Director

Email: info@ecrminerals.com

Website: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900
Nominated Adviser
Emma Earl/Jo Turner
Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550
Broker
Martin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

Copyright Business Wire 2015

Date   Source Headline
25th Jun 20257:00 amRNSUnaudited Half-Yearly Results
19th Jun 20257:00 amRNSQueensland operations update
27th May 20257:00 amRNSBailieston project - initial drilling results
20th May 202511:06 amRNSAIM Rule 17 Notification
13th May 20257:00 amRNSTermination of discussions with Maximum Minerals
30th Apr 20255:00 pmRNSTotal Voting Rights
23rd Apr 202512:12 pmRNSResult of AGM
23rd Apr 20257:00 amRNSAGM Statement
14th Apr 20259:00 amRNSOperational Update
1st Apr 20257:00 amRNSIssue of Equity, TVR & PDMR Dealings
31st Mar 20257:00 amRNSAudited Financial Results
24th Mar 20257:00 amRNSExploration and Corporate Update
5th Mar 202511:30 amRNSReceipt of A$225,000 Cash Consideration
3rd Mar 20257:00 amRNSProposed acquisition of Maximus Minerals Ltd
28th Feb 20252:00 pmRNSUpdate on potential sale of MGA & Strategic Update
21st Feb 20257:00 amRNSSale of surplus land now unconditional
13th Feb 20257:00 amRNSUpdate on Potential Sale of Tax Losses
11th Feb 20257:00 amRNSLolworth Exploration Update & Drilling Plans
3rd Feb 20257:00 amRNSOperations update
31st Jan 20255:00 pmRNSTotal Voting Rights
9th Jan 20257:00 amRNSIssue of Equity, TVR & PDMR Dealings
31st Dec 20241:30 pmRNSTotal Voting Rights
23rd Dec 20247:00 amRNSHeads of Terms for Proposed Disposal of MGA
20th Dec 20247:00 amRNSOperational Update - Tambo Gold Project, Victoria
16th Dec 20247:00 amRNSRetirement of Non-Executive Director
11th Dec 20247:00 amRNSTambo Gold Project Diamond Drilling Update
6th Dec 20242:30 pmRNSGrant of share options to Directors & staff
5th Dec 20244:17 pmRNSUpdate in relation to subscription to raise £950k
29th Nov 20247:00 amRNSCollaboration with JCU on REEs at Lolworth
26th Nov 20247:00 amRNSUpdate on the potential sale of non-core assets
25th Nov 20247:00 amRNSSubscription to raise £950,000
21st Nov 20247:00 amRNSConditional offer for proposed sale of land
20th Nov 20247:00 amRNSInitial Drilling Results From Tambo Gold Project
1st Nov 20247:00 amRNSExclusivity agreement relating to non-core assets
24th Oct 20247:00 amRNSLolworth Rock Chip Results & Exploration Update
17th Oct 20247:00 amRNSDiamond Drilling Commences at Tambo Gold Project
9th Oct 20247:00 amRNSAustralia Projects Update
8th Oct 20247:00 amRNSHighly Encouraging Test Result From Blue Mountain
7th Oct 20247:00 amRNSAppointment of Mike Parker as Consultant Geologist
3rd Oct 20247:00 amRNSGeological Survey of Queensland Collaboration
2nd Oct 20247:00 amRNSSalary Sacrifice, Issue of Equity and TVR
30th Sep 20245:00 pmRNSTotal Voting Rights
25th Sep 20247:00 amRNSContractor engaged for drilling at Tambo project
23rd Sep 20247:00 amRNSChange of registered office
17th Sep 20247:00 amRNSIssue of Equity
10th Sep 20247:00 amRNSAustralia Projects Update
30th Aug 20245:00 pmRNSTotal Voting Rights
30th Aug 20247:00 amRNSExpanded strategic focus
19th Aug 20247:00 amRNSChange of Nominated Adviser and Board Appointment
14th Aug 20247:05 amRNSPositive Gold Soil Sampling Results at Lolworth

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.