Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.205    0.00 (0.00%)
Bid:
0.19
Ask:
0.22
Spread: 0.03 (15.789%)
Market Cap: £7.26m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Tambo Gold Project Diamond Drilling Update

11 Dec 2024 07:00

RNS Number : 5866P
ECR Minerals PLC
11 December 2024
 

ECR MINERALS PLC

 

("ECR Minerals", "ECR" or the "Company")

 

Tambo Gold Project Diamond Drilling Update

ECR Minerals plc (LON: ECR), the exploration and development company focused on gold in Australia, is pleased to announce an update on drilling at the Duke of Cornwall prospect within the Company's Tambo Gold Project in Victoria, Australia (the "Tambo Gold Project") where results have been received for an additional 90 core samples submitted from diamond drill holes DOCD003 and DOCD004.

HIGHLIGHTS

Best results from hole DOCD004 include 0.15 metres @ 10.6 g/t Au, 0.35 metres @ 1.47 g/t Au and 0.15 metres @ 1.42 g/t Au

DOCD004 successfully intercepts Main Lode at a depth of 62.3 metres

Hole DOCD003 delineates shear zone's location

 

Tambo Gold Project

As announced on 20 November 2024, a maiden diamond drilling campaign was completed at the Tambo Gold Project. The diamond drilling campaign targeted beneath the historic workings of the Duke of Cornwall Mine, Swifts Creek. The campaign consisted of five diamond core drill holes, totalling approximately 439 metres in aggregate.

 

Drilling Programme Overview

Drilling at the Project's Duke of Cornwall prospect aimed to demonstrate grade continuity and refine initial geological interpretations. Results to date confirm that these objectives have been achieved, with diamond drilling providing high-accuracy structural and mineralisation data.

 

· Main Lode Gold Continuity: Results from DOCD002 (0.4 metres @ 8.51 g/t Au) and DOCD004 confirm vertical gold continuity extending at least 70 metres below the Adit workings.

· Historical Continuity: Historical records report average grades of approximately 10 g/t Au from lodes up to 4 metres wide. Several of the best drilling results to date closely align with this average (see Table 1 and Table 2 of highlighted recent results below).

 

Geological mapping and structural data suggest potential for high-grade zones where cleavage veins intersect the Main Lode. These intersections may represent historical wider lode sections.

 

 

Drill hole DOCD004 (see Table 1)

Hole DOCD004 was drilled to test for grade continuity vertically below previous high-grade results obtained from the Adit workings and DOCD002. The target Main Lode was successfully intercepted at a depth of 62.3 metres with gold values of 0.15 metres @ 10.6 g/t Au. This hole was drilled to a final depth of 86.4 metres. Two additional intercepts of 0.15 metres @ 1.42 g/t and 0.35 metres @ 1.47 g/t Au were from two distinct quartz veins located in the footwall and hanging wall of the Main Lode. The Board believes that these two veins show the potential for the development of undiscovered veins within the system. The overall average grade across all reported intervals was 4.50 g/t Au (see Table 1).

 

Drill hole DOCD003

No significant gold intercepts have been reported from the intervals tested from drill hole DOCD003, although the Board considers that this result provides valuable geological insights into delineating the location of the shear zone and controls on mineralisation. Hole DOCD003 was drilled to a total depth of 69.7 metres.

 

Next Steps

The Company is awaiting the assay results from drill hole DOCD005 which was designed to test for mineralisation under the extreme northern strike of the system and also for drill hole DOCD001. Results for both remaining holes are expected before the end of the year. Geological logging of DOCD005 thus far has identified two distinct quartz veins, aligning with historical reports of similar lodes. 

 

Adam Jones, ECR's Chief Geologist, said: "The results from drill hole DOCD004 mark another positive step forward in our exploration of the Duke of Cornwall prospect. While DOCD003 provides valuable geological insights into the location of the shear zone, DOCD004 has confirmed gold continuity within the Main Lode and highlights the potential for additional undiscovered veins within the system. I'm highly encouraged by how the best findings from DOCD002 and DOCD004 match up with historical records and the Board is optimistic about the potential for high-grade gold mineralisation as we continue to explore the strike and depth of the system. We eagerly await the assay results from DOCD005, which will provide further insight into the mineralisation potential at the northern end of the Duke of Cornwall system.''

Technical Disclosure

All sampling and drilling were conducted in accordance with industry best practice, and all assays were performed by an independent, accredited laboratory.

 

Review of Announcement by Qualified Person

This announcement has been reviewed by Adam Jones, Chief Geologist at ECR Minerals Plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

 

Table 1: Reportable Drill Intercepts For Hole DOCD004 (=> 0.1 g/t Au)

DRILLHOLE

DOMAIN

SAMPLE

FROM

TO

INTERVAL (metres)

Au (g/t)

DOCD004

Footwall Vein

BTD097

22.15

22.3

0.15

1.42

DOCD004

Main Lode

BTD120

62.3

62.45

0.15

10.6

DOCD004

Hanging Wall Vein

BTD136

78.8

79.15

0.35

1.47

 

 

Table 2: Highlighted Gold Sampling to Date from Duke of Cornwall (DOCD002 Drill Results And Rock Chip Channel Samples, as announced on 20 November 2024)

SAMPLE TYPE

DOMAIN

SAMPLE

FROM

TO

INTERVAL (metres)

Au (g/t)

Drilling

Cleavage vein

BTD037

44.6

45

0.4

8.51

Drilling

Cleavage vein

BTD041

45.6

46.2

0.6

0.68

Drilling

Cleavage vein

BTD042

46.2

46.4

0.2

0.19

Drilling

Main Lode

BTD045

48.15

48.6

0.45

0.88

Drilling

Main Lode

BTD048

50

50.3

0.3

3.00

Drilling

Main Lode

BTD049

50.3

50.65

0.35

0.37

Drilling

Main Lode

BTD050

50.65

51.05

0.4

0.01

Drilling

Main Lode

BTD051

51.05

51.2

0.15

24.1

Drilling

Main Lode

BTD052

51.2

52.05

0.85

0.58

Rockchip (Channel)

Main Lode

BTR064

0

0.25

0.25

27.80

Rockchip (Channel)

Main Lode

BTR065

0

0.2

0.2

180.00

 

Figure 1: Plan View Of Duke Of Cornwall - DOCD004 And Best Sampling Results To Date

 

 

 

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals Plc

Tel: +44 (0) 1738 317 693

Nick Tulloch, Chairman

Andrew Scott, Director

Email:

info@ecrminerals.com

Website: www.ecrminerals.com

Allenby Capital Limited

 

Tel: +44 (0) 3328 5656

Nominated Adviser 

Nick Naylor / Alex Brearley / Vivek Bhardwaj

info@allenbycapital.com

 

Axis Capital Markets Limited

Tel: +44 (0) 203 026 0320

Broker

Ben Tadd / Lewis Jones

 

SI Capital Ltd

Tel: +44 (0) 1483 413500

Broker

Nick Emerson

 

Brand Communications

Tel: +44 (0) 7976 431608

Public & Investor Relations

Alan Green

 

 

Glossary 

 

Au:

Gold

g/t:

Grammes per Tonne (Metric)

km:

Kilometres (Metric)

km²:

Kilometre squared (Metric)

Lode:

A deposit of metalliferous ore that fills a fissure

 

 

ABOUT ECR MINERALS PLC

 

ECR Minerals is a mineral exploration and development company. ECR's wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd ("MGA") has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has six licence applications outstanding which includes one licence application lodged in eastern Victoria (Tambo gold project).

 

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd ("LUX") which has three approved exploration permits covering 946 km2 over a relatively unexplored area in Lolworth Range, Queensland, Australia. The Company has also submitted a license application at Kondaparinga which is approximately 120km2 in area and located within the Hodgkinson Gold Province, 80km NW of Mareeba, North Queensland.

 

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), MGA has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited. 

 

MGA also has approximately A$75 million of unutilised tax losses incurred during previous operations.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGPGGGPUPCGBU
Date   Source Headline
30th Jun 20267:00 amRNSUnaudited Half-Yearly Results
10th Jun 20267:00 amRNSRaglan Operations Update
29th May 20265:00 pmRNSTotal Voting Rights
18th May 20267:00 amRNSCompletion of Acquisition of Paleogold Limited
6th May 20267:00 amRNSIssue of Equity, Option Grant and TVR
27th Apr 20267:00 amRNSOperations Update
20th Apr 20267:00 amRNSProposed acquisition of Paleogold Limited
27th Mar 202612:46 pmRNSResult of Annual General Meeting
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
5th Mar 20267:00 amRNSFinancial Results for Year Ended 30 September 2025
2nd Mar 20267:00 amRNSAward of Tambo South tenement
10th Feb 20267:15 amRNSRaglan initial mining plan
3rd Feb 20267:00 amRNSRaglan offtake partner identified
30th Jan 20265:00 pmRNSTotal Voting Rights
26th Jan 20267:00 amRNSRaglan Production Plan Underway
15th Jan 20264:55 pmRNSHolding in Company
8th Jan 20267:00 amRNS£1.5 million placing & appointment of Joint Broker
7th Jan 20267:00 amRNSECR's Raglan Project to enter production phase
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 20257:00 amRNSUpdated website and change of registered office
23rd Dec 20257:00 amRNSUpdated website and change of registered office
18th Dec 20257:00 amRNSSale and Purchase agreement for Raglan Project
12th Dec 20257:00 amRNSBlue Mountain drilling results & operations update
1st Dec 20257:00 amRNSStrong Maiden Drill Results & Operations Update
27th Nov 20257:00 amRNSDirectorate Change
25th Nov 20257:00 amRNS-RInitiation of research by Allenby Capital
11th Nov 20257:00 amRNSOperations update
31st Oct 20255:00 pmRNSTotal Voting Rights
17th Oct 20259:00 amRNSIssue of Equity and Total Voting Rights
17th Oct 20257:00 amRNSCorporate and Operational Update
6th Oct 20257:00 amRNSSignificantly oversubscribed WRAP Retail Offer
3rd Oct 20257:00 amRNSUpdate on Raglan Project site visit
1st Oct 20251:00 pmRNSWRAP Retail Offer for up to £100,000
1st Oct 202511:30 amRNSProposed Acquisition, Subscription & Other Matters
18th Sep 20259:00 amRNSJV heads of terms to advance the Creswick Project
15th Sep 20257:00 amRNSGold mineralisation confirmed at Blue Mountain
8th Sep 20257:00 amRNSAppointment of Chris Gibbs as a Proposed Director
27th Aug 20257:00 amRNSBlue Mountain drilling completed
22nd Aug 202511:00 amRNSAppointment of Bitcoin & Digital Asset Consultant
18th Aug 20257:00 amRNSBlue Mountain Gold Project – Exploration Update
8th Aug 20257:00 amRNSDirectorate Change
7th Aug 20257:00 amRNSBitcoin & Digital Asset Treasury Management Policy
4th Aug 20257:00 amRNSOperations update and TVR
1st Aug 20257:00 amRNSDirectorate change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.