Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.24    -0.005 (-2.04%)
Bid:
0.23
Ask:
0.25
Spread: 0.02 (8.696%)
Market Cap: £8.51m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Reserve Statement

20 Jun 2007 07:00

Mercator Gold PLC20 June 2007 Mercator Gold PLC ("Mercator Gold" or the "Company") MINING RESOURCE TO RESERVE STATEMENT Mercator Gold Plc has finalised mining and metallurgical studies on itspreviously reported resources of Bluebird, Surprise, Prohibition and Vivian -Consols, all located in the Meekatharra region of Western Australia. The Company is pleased to announce: • Probable reserves of 432,000 ounces of gold; • First production from the Surprise Open Pit scheduled late June 2007; • Yaloginda processing plant on track to treat initial ore 1 July 2007; • All key personnel to manage the Meekatharra Gold Operations have been sourced; • Mining contract awarded to Mining and Civil Australia. Managing Director, Patrick Harford, commented: "The Reserve base underpins our decision to recommence production at Meekatharrawith 432,000oz of Reserves. In addition, the ongoing Resources to Reserve workcurrently being undertaken at a number of locations will further strengthen thecompany's growth platform. We look forward to a truly profitable and sustainablefuture." Table 1 OPEN PIT PROBABLE RESERVES TONNES GRADE OUNCESBluebird 1,461,000 2.53g/t 119,000Surprise 827,000 2.35g/t 63,000Subtotal 2,288,000 2.46g/t 182,000UNDERGROUND PROBABLE RESERVESProhibition 1,372,000 4.06g/t 179,000Vivian - Consols 233,000 9.54g/t 71,000Subtotal 1,605,000 4.85g/t 250,000 TOTAL 432,000 Grade is grammes per tonne. Ounces are Troy ounces. Small numeric differencesmay occur due to number rounding. This applies throughout this release. Table 2---------------- ---------- --------- --------CURRENT RESOURCE TONNES GRADE OUNCESINDICATED & INFERRED--------------- ---------- --------- ---------Mudlode 446,000 5.46g/t 78,000(3.0 g/t cut-off)--------------- ---------- --------- ---------Fatts 180,000 3.65g/t 21,000(3.0 g/t cut-off)--------------- ---------- --------- ---------TOTALS 626,000 99,000--------------- ---------- --------- --------- Note: Mudlode and Fatts remain in the Resource category pending further accessand stope design. MINING OPEN PIT Surprise The Surprise open pit lies within 800 metres of the Yaloginda Carbon in Leach(CIL) processing plant. Pit Optimisations were conducted on the resource modelsresulting in the pit being deepened from 55 metres to 120 metres. Geomechanical studies were conducted by Coffey Mining to determine wall slopedesigns. As this open pit lies in close proximity to a major arterial highway,statutory requirements necessary to ensure wall stability integrity ismaintained have resulted in a reduction of ounces mined from previously reportedreserves. A mining contract has been awarded to Mining and Civil Australia, which hasmobilised a fleet of equipment ready to commence mining within the next fewweeks subject to DOCEP (Department of Consumer and Employment Protection)approvals. A grade control program has been completed for the first 30 metres and hasreturned positive variance to the reserve model. Bluebird The Bluebird open pit has been optimised to a total depth of 180 metres, whichextends the existing pit 100 metres below floor. The proximity of Bluebird tothe Yaloginda processing plant (less than 1,000 metres) and the proximity toideal waste dump locations have had positive impacts on mining costs. Detailedgeomechanical studies have been completed by Coffey Mining to determine wallslope design parameters, which become more critical with the open pit beingextended a further 100 metres in depth. Mining costs have been received from Mining and Civil Australia utilisinglarger, higher capacity earthmoving equipment for this larger open pit. Thelarger equipment reduces the unit mining costs, whilst ensuring the productivityrates required to meet the overall schedule. Table 3 OPEN PIT PROBABLE RESERVES TONNES GRADE OUNCESBluebird 1,461,000 2.53g/t 119,000Surprise 827,000 2.35g/t 63,000 TOTAL 182,000 Mining Schedule Open pit mining commences with Surprise. Low grade ore will be used first tobuild up gold inventory over the initial three-month period, followed by highergrade ore over the ensuing six months. Pre-stripping of the Bluebird open pitwill commence once final approvals have been received from the statutoryauthorities (expected timing of three to four months). Bluebird ore would thenbe blended with Surprise to smooth monthly gold outputs. Subject to the scheduling of the open pits, ore production from Bluebird andSurprise over an 18 month period will rise to an annualised gold output of120,000ozs at an expected process rate of 1,250,000 tonnes per annum. Mining Underground The Prohibition orebody will be accessed and serviced by a 5.0m x 5.5m decline.The mining methods will be predominantly large mechanised sub level open stopes.Geomechanical studies of the rock types, conducted by Peter O'Brien andAssociates have confirmed the methods proposed and identified the supportmechanisms for decline and stope development. Red Rock Engineering, a specialist underground mining consultant has providedall decline access and stope design, inclusive of schedules, operating andcapital costs. Prohibition lies within 250 metres of the Eastern line of lodes known asVivian-Consols and Mudlode. These lodes were historically mined as narrow veinhigh grade orebodies. Access and services to these lodes will be shared withProhibition. Ventilation and second egress will be provided from an existingthree-compartment shaft that lies within 400 metres of the Decline Portal. Initial access will target Prohibition to 300 metres below surface andVivian-Consols to 250 metres below surface. Reserve development from the identified resources at Mudlode and Fatts will benotified following the completion of the detailed stope design presently beingundertaken. The Prohibition, Vivian - Consols and Mudlode orebodies remain open along strikeand at depth. The Company believes that considerable Resources and thereafterReserves remain to be delineated once access to drilling locations has beenestablished. The table below outlines the stoping profiles expected over the initialdevelopment phases before additional underground drilling programs areundertaken. Table 4 STOPING LOM OUNCESProhibition tonnes 1,372,000 tonnes @ 4.06g/t 179,000Vivian-Consols tonnes 233,000 tonnes @ 9.54g/t 71,000 TOTAL 250,000 Metallurgy A number of metallurgical studies have been conducted on the projects specifiedabove by highly regarded metallurgical consultants AMMTEC, Bateman Minerals andMetals and Orway Mineral Consultants. Since the Yaloginda CIL plant previouslytreated some of the ore types represented above and was designed to treatvariable ore types no new circuits are required in the initial production phasesother than the addition of a gravity circuit. The following table highlights the respective ore characteristics identifiedfrom metallurgical test work. Table 5------------ ---------- --------- ----------- ---------PROJECT NAME BOND MILL GRAVITY GOLD CIL GOLD LEACH Work Index kwhrs/t % rec % rec hours ------------ ---------- --------- ----------- ---------Surprise 12 to 15 14.5 to 34 93.5 12 to 24------------ ---------- --------- ----------- ---------Bluebird 12 to 15.3 14 to 40 93.5 to 98 12 to 48------------ ---------- --------- ----------- ---------Vivian 15 to 18 19.7 97.9 24------------ ---------- --------- ----------- ---------Consols 15 to 18 53 93.6 24------------ ---------- --------- ----------- ---------Prohibition 18 to 23 25 83.5* 24------------ ---------- --------- ----------- --------- *Prohibition ore requires additional flotation and ultra-fine grinding toliberate gold. Recoveries of 90 to 95% are then achievable. Testwork wasundertaken by Bateman Minerals and Metals. Competent Persons Report - Consent for release The information in this report, which relates to the Surprise, Bluebird,Prohibition, and Vivian - Consols Ore Reserves, is based on information compiledby Alan Coles and Denis Geldard. Alan Coles and Denis Geldard are full time employees of Mercator Gold AustraliaPty Ltd and are Members of the Australasian Institute of Mining and Metallurgy. Alan Coles and Denis Geldard have sufficient experience which is relevant to thestyle of mineralisation and type of deposit under consideration and to theactivity which they are undertaking to qualify as Competent Persons as definedin the 2004 Edition of the "Australasian Code for Reporting of ExplorationResults, Mineral Resources and Ore Reserves". Alan Coles and Denis Geldard consent to the inclusion in the report of thematters based on this information in the form and context in which it appears. For further information please contact: Mercator Gold plcTerry Strapp, Chairman Tel: +61 (0) 412 228 422Patrick Harford, Managing Director Tel: +44 (0) 20 7929 1010 Email: info@mercatorgold.comWebsite: www.mercatorgold.com Bankside Consultants Ltd Tel: +44 (0) 20 7367 8888Simon RothschildKeith IronsOliver Winters AIM: MCR This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland
3rd Apr 20237:05 amBUSFinal Niobium and Tantalum Stream Results Extend Anomalous Footprint at Lolworth Range Project, Queensland
3rd Apr 20237:00 amBUSFinal Results
23rd Mar 20237:16 amBUSFurther Stream Sampling Results Identify New Gold Anomalies at Lolworth Range Project, Queensland
3rd Mar 20233:01 pmBUSDiamond Drilling Programme commences at Creswick
1st Mar 20237:04 amBUSSecond ECR Drill Rig Arrives At Melbourne
24th Feb 20237:09 amBUSFurther High-Grade Gold Intercepts at Blue Moon Prospect, Bailieston, Victoria
22nd Feb 20237:06 amBUSDanglay Gold Project shareholding increases to 90%
15th Feb 20237:02 amBUSSale of Bailieston Property Raises A$670,000
7th Feb 20237:17 amBUSInsitu Rock Chip Sampling at Creswick Licences EL006184 and EL006713
1st Feb 202310:19 amBUSFurther Gold, Lithium, Tantalum and Niobium Samples Identified at Lolworth Range Project, Queensland
23rd Jan 20237:50 amBUSDrilling Progress Report for the Blue Moon Prospect at Bailieston, Victoria
23rd Jan 20237:05 amBUSSoil Geochemistry Results from Creswick License EL006184
3rd Jan 20237:38 amBUSApproval Received For Two Further Exploration Tenements in Victoria, Australia
23rd Dec 20227:09 amBUSLithium-Tantalum-Niobium Stream Anomalies Identified at Lolworth, Queensland
22nd Dec 20227:05 amBUSNew Parallel Gold System Identified at Creswick, Victoria
13th Dec 20221:56 pmBUSNew Exploration Tenements EL006911 and EL006912 granted at Bailieston, Victoria
12th Dec 202212:45 pmBUSMultiple visible gold occurrences and pegmatites observed at Lolworth, Queensland
12th Dec 202211:08 amBUSEquity Placing to Raise GBP900,000
8th Dec 20227:04 amBUSUpdated Corporate Presentation
23rd Nov 20227:25 amBUSPayment to GoldOz PL
17th Nov 20227:06 amBUSEncouraging Results from First Drill Hole of 2022 at Blue Moon, Victoria
19th Oct 20222:31 pmBUSBlock listing Interim Review
19th Oct 20227:04 amBUSRe-assay of Creswick Diamond Drill Core Reveals High Grade Results Including 0.7m @47.75 g/t Au
14th Oct 20221:11 pmBUSTwo Mineralisation Corridors Identified in Hole BH3DD032 at Bailieston, Victoria
11th Oct 20228:19 amBUSSecond ECR Drill Rig Update
4th Oct 20228:28 amBUSUpdate on Sampling at Lolworth, Queensland
14th Sep 20227:10 amBUSDrilling Commences at Blue Moon Prospect, Bailieston, Victoria
26th Aug 20222:00 pmBUSBendigo Property Sale Proceeds of A$950,000 Now Received
11th Aug 20227:03 amBUSPlanned Follow-up Drilling in early September at Blue Moon Prospect, Bailieston, Victoria
9th Aug 20227:02 amBUSTwo Mineralisation Corridors Identified from HR3 hole BH3DD032 at Bailieston, Victoria
29th Jul 20228:30 amBUSSale of Bendigo Property Raises A$950,000
11th Jul 20227:14 amBUSDrill Results from BH3DD035 Show Signs of Grade Continuity at Bailieston, Victoria
6th Jul 20227:01 amBUSInvestor Presentation and Strategic Update
30th Jun 20227:01 amBUSHalf-year Report
24th Jun 20223:22 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.