Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.21    -0.03 (-12.50%)
Bid:
0.20
Ask:
0.22
Spread: 0.02 (10.00%)
Market Cap: £7.44m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Reserve Statement

20 Jun 2007 07:00

Mercator Gold PLC20 June 2007 Mercator Gold PLC ("Mercator Gold" or the "Company") MINING RESOURCE TO RESERVE STATEMENT Mercator Gold Plc has finalised mining and metallurgical studies on itspreviously reported resources of Bluebird, Surprise, Prohibition and Vivian -Consols, all located in the Meekatharra region of Western Australia. The Company is pleased to announce: • Probable reserves of 432,000 ounces of gold; • First production from the Surprise Open Pit scheduled late June 2007; • Yaloginda processing plant on track to treat initial ore 1 July 2007; • All key personnel to manage the Meekatharra Gold Operations have been sourced; • Mining contract awarded to Mining and Civil Australia. Managing Director, Patrick Harford, commented: "The Reserve base underpins our decision to recommence production at Meekatharrawith 432,000oz of Reserves. In addition, the ongoing Resources to Reserve workcurrently being undertaken at a number of locations will further strengthen thecompany's growth platform. We look forward to a truly profitable and sustainablefuture." Table 1 OPEN PIT PROBABLE RESERVES TONNES GRADE OUNCESBluebird 1,461,000 2.53g/t 119,000Surprise 827,000 2.35g/t 63,000Subtotal 2,288,000 2.46g/t 182,000UNDERGROUND PROBABLE RESERVESProhibition 1,372,000 4.06g/t 179,000Vivian - Consols 233,000 9.54g/t 71,000Subtotal 1,605,000 4.85g/t 250,000 TOTAL 432,000 Grade is grammes per tonne. Ounces are Troy ounces. Small numeric differencesmay occur due to number rounding. This applies throughout this release. Table 2---------------- ---------- --------- --------CURRENT RESOURCE TONNES GRADE OUNCESINDICATED & INFERRED--------------- ---------- --------- ---------Mudlode 446,000 5.46g/t 78,000(3.0 g/t cut-off)--------------- ---------- --------- ---------Fatts 180,000 3.65g/t 21,000(3.0 g/t cut-off)--------------- ---------- --------- ---------TOTALS 626,000 99,000--------------- ---------- --------- --------- Note: Mudlode and Fatts remain in the Resource category pending further accessand stope design. MINING OPEN PIT Surprise The Surprise open pit lies within 800 metres of the Yaloginda Carbon in Leach(CIL) processing plant. Pit Optimisations were conducted on the resource modelsresulting in the pit being deepened from 55 metres to 120 metres. Geomechanical studies were conducted by Coffey Mining to determine wall slopedesigns. As this open pit lies in close proximity to a major arterial highway,statutory requirements necessary to ensure wall stability integrity ismaintained have resulted in a reduction of ounces mined from previously reportedreserves. A mining contract has been awarded to Mining and Civil Australia, which hasmobilised a fleet of equipment ready to commence mining within the next fewweeks subject to DOCEP (Department of Consumer and Employment Protection)approvals. A grade control program has been completed for the first 30 metres and hasreturned positive variance to the reserve model. Bluebird The Bluebird open pit has been optimised to a total depth of 180 metres, whichextends the existing pit 100 metres below floor. The proximity of Bluebird tothe Yaloginda processing plant (less than 1,000 metres) and the proximity toideal waste dump locations have had positive impacts on mining costs. Detailedgeomechanical studies have been completed by Coffey Mining to determine wallslope design parameters, which become more critical with the open pit beingextended a further 100 metres in depth. Mining costs have been received from Mining and Civil Australia utilisinglarger, higher capacity earthmoving equipment for this larger open pit. Thelarger equipment reduces the unit mining costs, whilst ensuring the productivityrates required to meet the overall schedule. Table 3 OPEN PIT PROBABLE RESERVES TONNES GRADE OUNCESBluebird 1,461,000 2.53g/t 119,000Surprise 827,000 2.35g/t 63,000 TOTAL 182,000 Mining Schedule Open pit mining commences with Surprise. Low grade ore will be used first tobuild up gold inventory over the initial three-month period, followed by highergrade ore over the ensuing six months. Pre-stripping of the Bluebird open pitwill commence once final approvals have been received from the statutoryauthorities (expected timing of three to four months). Bluebird ore would thenbe blended with Surprise to smooth monthly gold outputs. Subject to the scheduling of the open pits, ore production from Bluebird andSurprise over an 18 month period will rise to an annualised gold output of120,000ozs at an expected process rate of 1,250,000 tonnes per annum. Mining Underground The Prohibition orebody will be accessed and serviced by a 5.0m x 5.5m decline.The mining methods will be predominantly large mechanised sub level open stopes.Geomechanical studies of the rock types, conducted by Peter O'Brien andAssociates have confirmed the methods proposed and identified the supportmechanisms for decline and stope development. Red Rock Engineering, a specialist underground mining consultant has providedall decline access and stope design, inclusive of schedules, operating andcapital costs. Prohibition lies within 250 metres of the Eastern line of lodes known asVivian-Consols and Mudlode. These lodes were historically mined as narrow veinhigh grade orebodies. Access and services to these lodes will be shared withProhibition. Ventilation and second egress will be provided from an existingthree-compartment shaft that lies within 400 metres of the Decline Portal. Initial access will target Prohibition to 300 metres below surface andVivian-Consols to 250 metres below surface. Reserve development from the identified resources at Mudlode and Fatts will benotified following the completion of the detailed stope design presently beingundertaken. The Prohibition, Vivian - Consols and Mudlode orebodies remain open along strikeand at depth. The Company believes that considerable Resources and thereafterReserves remain to be delineated once access to drilling locations has beenestablished. The table below outlines the stoping profiles expected over the initialdevelopment phases before additional underground drilling programs areundertaken. Table 4 STOPING LOM OUNCESProhibition tonnes 1,372,000 tonnes @ 4.06g/t 179,000Vivian-Consols tonnes 233,000 tonnes @ 9.54g/t 71,000 TOTAL 250,000 Metallurgy A number of metallurgical studies have been conducted on the projects specifiedabove by highly regarded metallurgical consultants AMMTEC, Bateman Minerals andMetals and Orway Mineral Consultants. Since the Yaloginda CIL plant previouslytreated some of the ore types represented above and was designed to treatvariable ore types no new circuits are required in the initial production phasesother than the addition of a gravity circuit. The following table highlights the respective ore characteristics identifiedfrom metallurgical test work. Table 5------------ ---------- --------- ----------- ---------PROJECT NAME BOND MILL GRAVITY GOLD CIL GOLD LEACH Work Index kwhrs/t % rec % rec hours ------------ ---------- --------- ----------- ---------Surprise 12 to 15 14.5 to 34 93.5 12 to 24------------ ---------- --------- ----------- ---------Bluebird 12 to 15.3 14 to 40 93.5 to 98 12 to 48------------ ---------- --------- ----------- ---------Vivian 15 to 18 19.7 97.9 24------------ ---------- --------- ----------- ---------Consols 15 to 18 53 93.6 24------------ ---------- --------- ----------- ---------Prohibition 18 to 23 25 83.5* 24------------ ---------- --------- ----------- --------- *Prohibition ore requires additional flotation and ultra-fine grinding toliberate gold. Recoveries of 90 to 95% are then achievable. Testwork wasundertaken by Bateman Minerals and Metals. Competent Persons Report - Consent for release The information in this report, which relates to the Surprise, Bluebird,Prohibition, and Vivian - Consols Ore Reserves, is based on information compiledby Alan Coles and Denis Geldard. Alan Coles and Denis Geldard are full time employees of Mercator Gold AustraliaPty Ltd and are Members of the Australasian Institute of Mining and Metallurgy. Alan Coles and Denis Geldard have sufficient experience which is relevant to thestyle of mineralisation and type of deposit under consideration and to theactivity which they are undertaking to qualify as Competent Persons as definedin the 2004 Edition of the "Australasian Code for Reporting of ExplorationResults, Mineral Resources and Ore Reserves". Alan Coles and Denis Geldard consent to the inclusion in the report of thematters based on this information in the form and context in which it appears. For further information please contact: Mercator Gold plcTerry Strapp, Chairman Tel: +61 (0) 412 228 422Patrick Harford, Managing Director Tel: +44 (0) 20 7929 1010 Email: info@mercatorgold.comWebsite: www.mercatorgold.com Bankside Consultants Ltd Tel: +44 (0) 20 7367 8888Simon RothschildKeith IronsOliver Winters AIM: MCR This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Oct 20114:07 pmBUSIssue of Equity
7th Oct 20117:00 amBUSThemac Resources Provides Copper Flat Project Update
3rd Oct 20117:41 amBUSUnchimé Iron Ore Project Update
23rd Sep 20117:00 amBUSAdditional High Grade Gold Assays from Sierra de las Minas Sampling
15th Sep 20117:00 amBUSArgentina Exploration Update
16th Aug 20113:28 pmBUSDirector/PDMR Shareholding
15th Aug 201111:00 amBUSUpdate
29th Jul 20112:53 pmBUSTotal Voting Rights
8th Jul 20115:07 pmBUSIssue of Equity
6th Jul 20115:00 pmBUSDirector/PDMR Shareholding
5th Jul 20117:00 amBUSUnchimé Iron Project, Argentina
30th Jun 201110:50 amBUSTotal Voting Rights
30th Jun 20117:00 amBUSHalf-yearly Report
24th Jun 20117:00 amBUSTHEMAC RESOURCES ANNOUNCES COMMENCEMENT OF COPPER FLAT DRILLING PROGRAMME
16th May 20117:00 amBUSArgentina Exploration Update
28th Apr 20115:45 pmBUSTotal Voting Rights
15th Apr 20114:48 pmBUSIssue of Equity
4th Apr 201112:53 pmBUSDirectorate Change
1st Apr 20112:47 pmBUSIssue of Equity
31st Mar 20111:03 pmBUSResult of AGM
31st Mar 201112:42 pmBUSTotal Voting Rights
21st Mar 20117:00 amBUSFinal Acceptance Received by THEMAC Resources for Acquisition of Copper Flat Option from ECR
17th Mar 20114:57 pmBUSIssue of Equity
9th Mar 20113:22 pmBUSFinal Results
9th Mar 201112:42 pmBUSClosing of Copper Flat Sale
28th Feb 20113:49 pmBUSTotal Voting Rights
7th Feb 20119:48 amBUSIssue of Equity
4th Feb 201111:46 amBUSPaniai Gold Update
18th Jan 201112:23 pmBUSIssue of Equity
14th Jan 20119:39 amBUSUPDATE ON MERCATOR GOLD AUSTRALIA PTY LTD
6th Jan 20115:01 pmBUSGrant of Options
5th Jan 20117:00 amBUSECR Agrees to Acquire El Abra Historic Gold Mine in La Rioja Province, Argentina
29th Dec 20103:42 pmBUSIssue of Equity
23rd Dec 20104:02 pmBUSTHEMAC SHAREHOLDERS APPROVE C$10.2 MILLION FINANCING
9th Dec 201012:04 pmBUSIssue of Equity
8th Nov 20103:34 pmBUSThemac Raises C$10,200,000 from Marley Holdings for Development of Copper Flat Project
27th Oct 20102:53 pmBUSSilver Swan Announces High Grade Results from Drilling at Austin Deposit
21st Oct 20104:11 pmBUSISSUE OF EQUITY
7th Oct 20107:00 amBUSElectrum Acquires Gold/Base Metal Projects in Argentina
30th Sep 20104:35 pmRNSDirectorate Change
30th Sep 20104:35 pmRNSSILVER SWAN ENCOUNTERS FURTHER SULPHIDES AT AUSTIN
29th Sep 20101:12 pmRNSVariation to terms of Convertible Loan Note
15th Sep 20109:44 amBUSDate of Meeting of Convertible Loan Note Holders
14th Sep 20107:00 amBUSProposed Variation to Terms of Convertible Loan Notes
27th Aug 20109:13 amRNSDirector/PDMR Shareholding
28th Jul 20103:05 pmBUSSilver Swan Resumes Drilling at Austin Prospect
9th Jul 20101:07 pmBUSTHEMAC Resources Group Releases Copper Flat PEA Results
8th Jul 20103:14 pmBUSUpdate on THEMAC Resources Group
30th Jun 20107:00 amBUSHalf-yearly Report
21st Jun 20103:38 pmBUSExceptional Silver Swan Drilling Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.