Less Ads, More Data, More Tools Register for FREE

Pin to quick pickseEnergy Group Regulatory News (EAAS)

Share Price Information for eEnergy Group (EAAS)

Share Price is delayed by 15 minutes
Get Live Data
5.15    0.00 (0.00%)
Bid:
5.00
Ask:
5.30
Spread: 0.30 (6.00%)
Market Cap: £19.94m
EAAS Live PriceLast checked at - London Stock Exchange

Intraday eEnergy Group Share Chart

Positive Preliminary Testwork on Firestone Samples

13 Apr 2011 07:00

RNS Number : 7787E
Alexander Mining PLC
13 April 2011
 



Alexander Mining plc

('Alexander' or the 'Company')

Positive Preliminary AmmLeach® Amenability Testwork on Samples from Firestone's Zinc-Lead Properties in Nevada

Alexander (listed: AXM-AIM and AXD-TSXV) and Firestone Ventures Inc. ('Firestone'; listed: FV-TSXV; F5V-FSE) are pleased to announce that preliminary stage amenability tests using the AmmLeach® process on two grab samples, with grades of 15.3% and 16.3% zinc, from Firestone's Black Mountain and Antelope zinc properties in Nevada, produced high leaching recoveries.

This follows positive results from the metallurgical testwork using AmmLeach® at Firestone's Torlon Hill deposit (as announced on March 4, 2011).

Martin Rosser, CEO of Alexander, said:

"These positive results certainly warrant further work on representative samples from Black Mountain and Antelope and we look forward to discussing the likely next steps with Firestone."

Lori Walton, President and CEO of Firestone, said:

"We are very encouraged by these early stage characterisation tests, which show excellent leaching recoveries. What is interesting is that the AmmLeach® process appears to work on both smithsonite and hemimorphite - carbonate and silicate zinc minerals respectively. These are the two primary zinc-bearing minerals present at both our Black Mountain and Antelope zinc exploration project areas."

The aim of the testwork was to test the amenability of two hand-picked grab samples from Firestone's Black Mountain property and Antelope property to the AmmLeach® process. No attempt was made to collect a representative sample or to optimise leach recoveries. It is stressed that the tests were very preliminary characterisation tests on grab samples of high-grade material and further testing will be required upon completion of drilling programmes.

Firestone has a 1,245m drill programme planned to begin in May at its road-accessible Black Mountain zinc-lead-silver property located 29km northeast of Wells, Nevada, U.S.A. Firestone has an option to earn 100% interest in the Black Mountain project from Kinross Gold (as announced on March 24, 2011 and November 29, 2010). Zinc mineralization at Black Mountain consisting of hemimorphite and smithsonite is structurally controlled and hosted in Devonian carbonate rocks. In addition, the permitting process is underway for a late 2011 drilling programme at Firestone's Antelope zinc-lead-silver property, southwest of Eureka, Nevada.

The AmmLeach® process, developed by MetaLeach Limited (a wholly owned subsidiary of Alexander Mining plc), uses a proprietary ammonia based process for leaching high acid consuming ores that are very costly or not economic to treat using acid leaching technology.

Recently, Firestone announced positive test results using AmmLeach® on selected representative samples from the Torlon Hill zinc-lead-silver deposit in Guatemala, Central America. As a result, Firestone has requested Alexander submit a conceptual process flow sheet as a potential pre-cursor to a feasibility study for Torlon Hill and a plan for substantial additional next stage testwork. An announcement on the findings of this report is imminent.

This news release may contain forward looking statements, being statements which are not historical facts, including, without limitation, statements regarding potential mineralization, exploration results, resource or reserve estimates, anticipated production or results, sales, revenues, costs, "best-efforts" financings or discussions of future plans and objectives. There can be no assurance that such statements will prove accurate. Such statements are necessarily based upon a number of estimates and assumptions that are subject to numerous risks and uncertainties that could cause actual results and future events to differ materially from those anticipated or projected. Important factors that could cause actual results to differ materially from the Company's expectations are in Company documents filed from time to time with the TSX Venture Exchange and provincial securities regulators, most of which are available at www.sedar.com. The Company disclaims any intention or obligation to revise or update such statements unless required by law. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

ENDS

 

For further information please contact: 

Martin Rosser Matt Sutcliffe

Chief Executive Officer Executive Chairman

Mobile: + 44 (0) 7770 865 341 Mobile: +44 (0) 7887 930 758

 

Alexander Mining plc

1st Floor

35 Piccadilly

London

W1J 0DW

Tel: +44 (0) 20 7292 1300

Fax: +44 (0) 20 7292 1313

Email: mail@alexandermining.com

Website: www.alexandermining.com

 

Nominated Advisor and Broker

Ambrian Partners Limited

Samantha Harrison / Jen Boorer

+44 (0) 20 7634 4700

 

Public/Media Relations

Britton Financial PR

Tim Blackstone

+44 (0) 20 7242 9786

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCITMITMBBBBAB
Date   Source Headline
29th Oct 20075:10 pmRNSHolding(s) in Company
9th Oct 200712:14 pmRNSHolding(s) in Company
1st Oct 200712:39 pmRNSHolding(s) in Company
1st Oct 200712:35 pmRNSHolding(s) in Company
21st Sep 20072:16 pmRNSHolding(s) in Company
19th Sep 20073:59 pmRNSHolding(s) in Company
18th Sep 20077:03 amRNSCorporate Update
18th Sep 20077:01 amRNSInterim Results
1st Aug 20079:46 amRNSRule 26 compliance
27th Jul 20077:00 amRNSNew leaching technology
26th Jul 20075:09 pmRNSHolding(s) in Company
20th Jul 20073:45 pmRNSHolding(s) in Company
13th Jul 20076:09 pmRNSHolding(s) in Company
9th Jul 20071:09 pmRNSOperations Update
21st Jun 20071:53 pmRNSHolding(s) in Company
13th Jun 200711:48 amRNSResult of AGM
30th Apr 20074:24 pmRNSHolding(s) in Company
30th Apr 20077:02 amRNSFinal Results
29th Mar 20079:02 amRNSHolding(s) in Company
12th Mar 20077:01 amRNSMolinetes Peru - update
1st Mar 20079:59 amRNSHolding(s) in Company
14th Feb 200712:23 pmRNSHolding(s) in Company
2nd Feb 20074:25 pmRNSHolding(s) in Company
5th Jan 20071:10 pmRNSResource Statement for Leon
15th Dec 20067:58 amRNSTotal Voting Rights
15th Dec 20067:58 amRNSLeon Drilling Update
25th Oct 20067:01 amRNSEncouraging Results at Leon
22nd Sep 20067:00 amRNSInterim Results
15th Sep 20067:31 amRNSLeon Project Update
1st Aug 20067:00 amRNSDirectorate Change
18th Jul 20067:30 amRNSOperations Update
12th May 20063:38 pmRNSHolding(s) in Company
10th May 20067:00 amRNSUpdate on Leon Project
3rd May 20068:00 amRNSChange of Adviser
27th Apr 20062:12 pmRNSResult of AGM
12th Apr 20069:46 amRNSDirectorate Change
17th Mar 20068:28 amRNSUpdate on Peru gold project
15th Mar 20068:02 amRNSFinal Results
10th Mar 20067:01 amRNSDrilling Report
9th Feb 20067:01 amRNSHolding(s) in Company
27th Jan 20063:06 pmRNSHolding(s) in Company
22nd Nov 20054:54 pmRNSBoard Appointment
18th Nov 20059:48 amRNSPeru Progress Report
17th Oct 20059:52 amRNSDrilling Begins at Rachaite
29th Sep 20053:41 pmRNSInterim Results
12th Sep 20053:44 pmRNSHolding(s) in Company
1st Aug 200511:17 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.