Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDoriemus Regulatory News (DOR)

  • There is currently no data for DOR

Further Update on Horse Hill-1 Flow Test

9 Mar 2016 07:00

RNS Number : 4710R
Doriemus PLC
09 March 2016
 

 

 

Doriemus PLC

("Doriemus" or the "Company")

 

Further Update on Horse Hill-1 Flow Test

Portland Zone Flows Oil at a Sustained Rate of 168 Barrels Per Day

 

Doriemus (AIM: DOR) announces that Horse Hill Developments Limited ("HHDL") has informed the Company that 37-degree API, light, sweet, dry (99-100% oil) crude has flowed to surface, via rod pumping, at an average stabilised rate of 168 barrels per day over a continuous 9-hour period. The flow is from a 103-ft aggregate perforated zone within the Upper Portland sandstone interval at a depth of approximately 615 metres below ground level. Maximum flow during this test period was restricted by the initial rod pump configuration. The flow test will now continue with a pump configuration designed to permit optimal flow over a longer flow period.

 

The Horse Hill-1 ("HH-1") well has now produced at a combined average stable rate of over 1,528 bopd from the two Kimmeridge and Upper Portland zones.

 

It should be noted that the only commercial Upper Portland oil production in the Weald Basin is from the nearby Brockham field, 8 km to the northwest of HH-1, in which the Company has a 10% interest. The Brockham field was discovered by BP in 1987 and flowed 28-degree API oil on an extended well test in 1988, at a maximum stabilised rate on pump of 117 bopd. A subsequent extended well test in 2001, prior to commercial production, produced oil at an average pumped rate of approximately 140 bopd.

 

Horse Hill-1 Discovery Well and Licence

The exploration drilling phase of the HH-1 discovery well was originally completed at the end of 2014. The well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. Doriemus owns a 6.5% interest in PEDL137.

 

The Board commented:

"This is further exciting news on our investment. We are very appreciative of the hard work currently being undertaken by Mr Sanderson and the Horse Hill company and we look forward to further news from the test program. ‎"

 

Interest in Horse Hill:

Doriemus owns a 10% direct interest in HHDL. HHDL is a special purpose company that owns a 65% participating interest and operatorship of Licence PEDL137 and the adjacent Licence PEDL246 in the UK Weald Basin.

 

Qualified Person's Statement:

Stephen Sanderson, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

Doriemus plc

Donald Strang

 

 +44 (0) 20 7440 0640

Cairn Financial Advisers LLP

(Nominated Adviser)

James Caithie / Jo Turner / Richard Nash

 

Optiva Securities Limited

(Broker)

Christian Dennis / Jeremy King

 

Square 1 Consulting Ltd

(PR)

David Bick

 +44 (0) 20 7148 7900

 

 

 

+44 (0) 20 3137 1902

 

 

 

+44 (0) 20 7929 5599

 

 

 

Glossary

 

choke

Device incorporating a fixed or variable orifice that is used to control fluid flow rate during testing of an exploratory discovery

degree API

A measure of the density of crude oil as defined by the American Petroleum Institute

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended flow test

a flow test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand.

sweet oil or crude

A type of oil that contains less than 0.42% Sulphur

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLAKFDQCBKDPNK
Date   Source Headline
9th Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
2nd Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
1st Mar 20168:00 amRNSISDX Admission Application Announcement
1st Mar 20168:00 amRNSAIM Cancellation
1st Mar 20167:00 amRNSFurther Update on Horse Hill-1 Flow Test
17th Feb 20167:00 amRNSHorse Hill-1, Further Update on Flow Test
16th Feb 20167:00 amRNSHorse Hill-1 Oil Discovery, Update on Flow Test
8th Feb 20167:00 amRNSHorse Hill Flow Test Operations Commence
4th Jan 20167:00 amRNSHorse Hill-1 Final Flow Test Consent
30th Nov 201511:15 amRNSHorse Hill-1 Flow Test Consent
30th Sep 201512:48 pmRNSHalf Yearly Report
16th Sep 20157:00 amRNSAppointment of Broker
11th Sep 20152:30 pmRNSSuspension - Doriemus Plc
11th Sep 20152:30 pmRNSAcquisition and Suspension of Trading
26th Aug 20157:52 amPRNIndependent Assessment of Horse Hill Licence Area
24th Jul 20152:01 pmPRNResult of AGM
26th Jun 20151:07 pmPRNFinal Results
18th Jun 20157:00 amPRNIndependent Assessment of the Horse Hill Licences
5th Jun 20157:30 amRNSRestoration - Doriemus Plc
5th Jun 20157:00 amPRNIndependent Assessment of Horse Hill-1 Well
4th Jun 20157:30 amRNSSuspension - Doriemus Plc
4th Jun 20157:30 amPRNAnnouncement regarding temporary suspension
13th May 20152:00 pmPRNHorse Hill Licence Extensions, UK Weald Basin
11th May 20157:00 amPRNUpdate - Horse Hill, UK Weald Basin
28th Apr 20157:00 amPRNUpdate - Horse Hill, UK Weald Basin
15th Apr 20157:00 amPRNClarification of Press Comment re 9 April Announcement
9th Apr 20157:00 amPRNSignificant upgrade to the Horse Hill discovery
26th Mar 201511:06 amPRNHolding(s) in Company
18th Mar 20157:00 amPRNUpdate on Horse Hill discovery, UK Weald Basin
17th Mar 20157:00 amPRNHolding(s) in Company
13th Mar 20154:15 pmPRNHolding(s) in Company
12th Mar 20157:00 amPRNPlacing
17th Dec 201412:31 pmPRNHorse Hill-1 Oil Discovery Update
5th Nov 20148:00 amPRNHorse Hill-1 Provisional Results at TD, Weald Basin UK
28th Oct 201411:47 amPRNResult of General Meeting
24th Oct 20147:00 amPRNPortland Oil Discovery, Horse Hill-1, Weald Basin
16th Oct 201411:30 amPRNDrilling Update, Horse Hill-1, Weald Basin UK
13th Oct 20145:08 pmPRNNotice of General Meeting
6th Oct 20147:00 amPRNDrilling Update, Horse Hill-1, Weald Basin UK
30th Sep 20144:15 pmPRNExercise of Warrants
30th Sep 20149:28 amPRNBoard Change
29th Sep 201412:00 pmPRNHalf-yearly Report
29th Sep 201411:00 amPRNDrilling Update, Horse Hill-1, Weald Basin UK
24th Sep 20141:00 pmPRNDrilling Update, Horse Hill-1, Weald Basin UK
18th Sep 20142:00 pmPRNUpdate, Horse Hill-1, Weald Basin UK
12th Sep 20143:19 pmPRNCorporate Update
4th Sep 20142:00 pmPRNIncreased Acreage Holdings, Weald Basin UK
3rd Sep 20147:00 amPRNDrilling commences at Horse Hill
13th Aug 20145:29 pmPRNResult of AGM
6th Aug 201412:00 pmPRNEnvironment Agency Permits Granted

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.