The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDES.L Regulatory News (DES)

  • There is currently no data for DES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

18 Apr 2011 07:00

RNS Number : 0588F
Desire Petroleum PLC
18 April 2011
 



For immediate release 18 April 2011

 

Ninky Well and 3D Seismic Operational Update

14/15-3 well to be plugged and abandoned with oil shows

Desire Petroleum plc (AIM:DES), the company wholly focussed on the North Falkland Basin, advises that the 14/15-3 well on the Ninky prospect has reached a total depth of 2,620 metres in the Barremian source rock interval.

Ninky Well Results

Based on drilling and wireline logging, the well encountered two sand-prone sections in the Upper and Middle F2 intervals, which were the primary targets (2323 metres to 2334 metres and 2365 metres to 2389 metres). The sands have a combined gross thickness of 35 metres and oil shows were encountered throughout both intervals while drilling. The reservoir quality is generally poor having only 5.6 metres of net reservoir with an average porosity of 13%. A thin interval of around 1.2 metres at the top of the Middle F2 zone is interpreted to be oil bearing from log analysis.

Wireline formation pressure measurements were attempted, but no valid pressures were obtained, indicating that the reservoirs are low permeability at this location. As a result no wireline sampling was attempted. The depositional model suggests these sands are sourced from the east and therefore better reservoir quality may be expected downdip. In addition, there are indications from seismic of further sands along strike on the Ninky structural high, which were not penetrated in this well. These opportunities will be evaluated with the new 3D seismic as part of Desire's prospect inventory update.

Operations on the Ninky well will now be completed and the well will be plugged and abandoned.

3D Seismic Update

The 3D seismic operations are ongoing with the Polarcus Nadia vessel, in a joint programme with Rockhopper. To date, approximately 1485 km2 of data have been acquired in the Desire operated part of the programme. Desire anticipates that a further 195 km2 will be acquired to complete the operated programme. The joint survey is expected to be completed during May. Processing of the new seismic data is in progress and initial indications are that data quality is good. Priority areas have been identified in the East Flank play between Ninky and Sea Lion, and over the Ann/Orca South prospect. The processed data from these priority areas is expected to be available in July. The full, merged data will be available later in the year, which will provide coverage over the southern part of the East Flank play and the Helen prospect.

Desire remains optimistic that existing prospects can be significantly de-risked using the new seismic data and that new prospects will be identified, particularly within the East Flank play which is widely developed within the Desire operated licences.

 

Stephen Phipps, Chairman of Desire, commented " On completion of the Ninky well Desire will have funds of circa $37 million which, while more than adequate for our share of rig and vessel demobilisation, completion of our 3D seismic acquisition, processing and interpretation plus general working capital needs, is insufficient to drill further wells. Given our continuing confidence that oil will be discovered on Desire's acreage, further wells will need to be drilled and, therefore, once the results of the Ninky well and the 3D seismic have been analysed, we will review all financing options available with the intention of rejoining the drilling campaign later in the year if possible".

 

 

Subsurface support is provided to Desire Petroleum by Senergy (GB) Ltd and the well results reported today are based on the work of the Senergy operations team.

This statement has been approved by Mr Ken Black , Exploration Director of Desire Petroleum plc, who is a member of the Petroleum Exploration Society of Great Britain , with over 30 years experience in petroleum exploration and management.

 

 

For further information please contact:

Desire Petroleum plc

020 7436 0423

Stephen Phipps, Chairman

Dr Ian Duncan, Chief Executive Officer

 

Seymour Pierce Limited

020 7107 8000

Jonathan Wright

 

Buchanan Communications

020 7466 5000

Tim Thompson

Ben Romney

Chris McMahon

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGUMCCUPGGQM
Date   Source Headline
14th Apr 20094:40 pmRNSSecond Price Monitoring Extn
14th Apr 20094:35 pmRNSPrice Monitoring Extension
1st Apr 20092:45 pmRNSNotice of Results
16th Mar 20094:40 pmRNSSecond Price Monitoring Extn
16th Mar 20094:35 pmRNSPrice Monitoring Extension
4th Mar 20097:00 amRNSEIA Submission
17th Feb 20094:40 pmRNSSecond Price Monitoring Extn
17th Feb 20094:35 pmRNSPrice Monitoring Extension
10th Feb 200910:26 amRNSOperational Update
4th Feb 200911:15 amRNSDirectorate Change
20th Jan 20093:16 pmRNSDirector/PDMR Shareholding
15th Dec 20084:41 pmRNSSecond Price Monitoring Extn
15th Dec 20084:35 pmRNSPrice Monitoring Extension
22nd Sep 20083:32 pmRNSDirector/PDMR Shareholding
12th Sep 200810:00 amRNSInterim Results
8th Sep 20087:00 amRNSEnvironmental Impact Assessme
14th Aug 20088:29 amRNSFarm-out Agreement and Grant
24th Jul 20081:54 pmRNSHolding(s) in Company
21st Jul 20081:41 pmRNSHolding(s) in Company
14th Jul 20084:32 pmRNSHolding(s) in Company
10th Jul 200811:23 amRNSAdditional Listing and TVR
9th Jul 20087:00 amRNSDirectorate Change
3rd Jul 20085:06 pmRNSSecond Price Monitoring Extn
3rd Jul 20085:01 pmRNSPrice Monitoring Extension
12th Jun 20089:25 amRNSResult of AGM
9th Jun 20084:09 pmRNSHolding(s) in Company
9th Jun 20087:00 amRNSHolding(s) in Company
2nd May 20084:48 pmRNSHolding(s) in Company
30th Apr 20087:05 amRNSDirectorate Change
30th Apr 20087:01 amRNSPreliminary Results
21st Apr 20087:00 amRNSExercise of options
10th Apr 200812:05 pmRNSAdditional Listing and TVR
28th Mar 20084:20 pmRNSHolding(s) in Company
12th Mar 20084:53 pmRNSDirector Declaration
28th Feb 20083:49 pmRNSStmnt re Share Price Movement
28th Feb 20087:00 amRNSDirector/PDMR Shareholding
26th Feb 20084:05 pmRNSGrant of SARs
25th Feb 20083:30 pmRNSRestoration -Desire Petroleum
25th Feb 20083:00 pmRNSFarm-in agreement
25th Feb 20087:30 amRNSTemporary Suspension
25th Feb 20087:30 amRNSSuspension - Desire Petroleum
14th Jan 20087:00 amRNSAppointment of Director
6th Dec 20077:00 amRNSUpdate on Activities
27th Nov 20073:16 pmRNSHolding(s) in Company
22nd Nov 20072:58 pmRNSHolding(s) in Company
20th Nov 200711:00 amRNSSite Survey
13th Nov 20077:01 amRNSHolding(s) in Company
12th Nov 20077:00 amRNSHolding(s) in Company
16th Oct 20072:19 pmRNSAdditional Listing
26th Sep 200712:25 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.