Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCleantech Lithium Regulatory News (CTL)

Share Price Information for Cleantech Lithium (CTL)

Share Price is delayed by 15 minutes
Get Live Data
8.15    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.70 (8.974%)
Market Cap: £16.64m
CTL Live PriceLast checked at - London Stock Exchange

Intraday Cleantech Lithium Share Chart

Trials to Further Validate PFS Process Design

16 Apr 2026 07:00

RNS Number : 6567A
CleanTech Lithium PLC
16 April 2026
 

16 April 2026

CleanTech Lithium PLC ("CTL", CleanTech Lithium" or the "Company")

Trials to Further Validate PFS Process Design

 

CleanTech Lithium PLC (AIM: CTL, Frankfurt: T2N), an exploration and development company advancing sustainable lithium projects in Chile, announces an update on two trials being undertaken in North America and in Santiago, Chile, to produce battery grade lithium carbonate from the Laguna Verde project. The trials are focused on replicating and validating the process design that has been defined in the Laguna Verde Pre-Feasibility Study ("PFS").

Highlights:

· In North America, stage two of the downstream processing of eluate* (see footnote for definition) produced by our DLE pilot plant located in Chile, into battery grade lithium carbonate has commenced.

· The first stage of this work was undertaken by Conductive Energy and reported to the market in January 2025.

· Conductive Energy was acquired by Empower EIT over the course of 2025, with Empower establishing an advanced lithium processing facility in Dallas, USA.

· This second stage of eluate conversion will process >60m3 of concentrated eluate at the new facility.

· The nanofiltration stage of the process will utilise an advanced membrane developed by DuPont Water Solutions to maximise impurity removal and lithium recovery.

· Approximately 300kg of battery grade lithium carbonate are expected to be produced in Q2 2026 and made available to potential strategic partners for product qualification.

· Concurrently, a smaller scale pilot programme is underway utilising the pilot plant of Lanshen Technology ("Lanshen"), located in Santiago, Chile.

· This pilot plant replicates the process flowsheet developed with Lanshen for the Laguna Verde PFS and aims to demonstrate the robustness of the process design and provide a high degree of validation of the process parameters used in the PFS.

· A volume of 24m3 of feed brine from Laguna Verde is being processed into >5kg of battery grade lithium carbonate.

Ignacio Mehech, Chief Executive Officer, CleanTech Lithium said: "We are undertaking important pilot scale process trials in North America and Chile to produce battery grade lithium carbonate from Laguna Verde brine. This work will provide strong technical support for the process flow sheet used in our PFS which we think is an important consideration for engaging with potential strategic investors."

Further Details:

Eluate conversion in North America commences

In 2H 2024, a total of 88m3 of concentrated eluate produced at the Company´s DLE pilot plant located in Copiapó, Chile, was shipped to the facilities of Conductive Energy in Chicago, USA, for conversion into lithium carbonate. A total of 27.5m3 of eluate was processed in this first stage trial which produced approximately 50kg of lithium carbonate. The details were reported to the market on January 14, 2025 (link). Conductive Energy entered an extended acquisition process in 2025 which culminated in it being acquired by Empower EIT, a company which aims to be a leader in lithium processing in North America. With the establishment of Empower´s new 1600m2 facility based in Dallas, Texas, stage two processing has commenced on the remaining approximately 60m3 of concentrated eluate. A nanofiltration stage has been added to remove divalent ions from the eluate which should further reduce impurities in the battery grade lithium carbonate product.

 

Fig. 1: Empower Lithium Processing Facility in Dallas, Texas

 

The conversion process is depicted in Fig. 2. For the nanofiltration (NF) stage, Empower and CleanTech will build on previous collaboration with DuPont Water Solutions, a business unit of DuPont, which has developed a new NF membrane to remove impurities and maximize lithium recovery. The stage two trial aims to produce approximately 300kg of battery grade lithium carbonate. Lithium carbonate product will be sent to a laboratory in North America to be verified as battery-grade (>99.5%) and meeting Chinese Standard GBT 23853-2022 Type 1 for minor impurities. Samples will be available for product qualification by potential strategic partners. An initial volume of battery grade lithium is expected to be produced in the coming weeks, and the processing of the total volume of 60m3 of eluate is targeted to be completed by the end of next month.

Fig. 2: Downstream process for eluate conversion

Plant Programme with Lanshen to Validate and Optimise PFS Process

CleanTech selected Lanshen´s technology for the DLE stage of the process design used in the Laguna Verde PFS with the downstream conversion process design also developed with Lanshen. The Company will continue to evaluate the optimal options for DLE and downstream process stages with all parties. For the purposes of validating the PFS process design, the Company has engaged Lanshen to complete a trial at Lanshen´s pilot plant in Santiago, Chile to produce battery grade lithium carbonate from Laguna Verde feed brine. This trial will test both the specific DLE adsorbent and the flow-sheet used for the downstream conversion process in the PFS. It will also evaluate key materials, reagents and equipment, and verify the PFS assumptions for the capacity of DLE modules and water consumption rates. The Company believes this pilot programme will provide a powerful validation of the PFS process design.

A volume of 24m3 of feed brine from Laguna Verde is being processed into >5kg of battery grade lithium carbonate with the test-work expected to be completed and the results reported to the market in the current quarter.

Fig. 3: Lanshen pilot plant facilities in Santiago, Chile

 

*Eluate*

Purified, lithium-rich solution produced as the output of the Direct Lithium Extraction ("DLE") process. The eluate being processed by Empower was produced by processing Laguna Verde brine through CleanTech Lithium's DLE pilot plant, which selectively removes lithium while rejecting over 99% of key impurities including calcium, magnesium and sodium. The resulting lithium chloride eluate was further concentrated using reverse osmosis to be further processed downstream to produce battery-grade lithium carbonate.

 

 

For further information contact:

CleanTech Lithium PLC

Ignacio Mehech/Gordon Stein/Nick Baxter

Office: +44 (0) 1534 668 321

Mobile: +44 (0) 7494 630 360

Email: info@ctlithium.com

Beaumont Cornish Limited (Nominated Adviser)

Roland Cornish/Asia Szusciak

+44 (0) 20 7628 3396

iStar Capital Limited (Joint Broker)

Daniel Fox-Davies

+44 (0) 20 3884 8450

daniel@istarcapital.com

Canaccord Genuity (Joint Broker)

James Asensio

+44 (0) 20 7523 4680

About Reach announcements

This is a Reach announcement. Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases into the public domain. Information required to be notified under the AIM Rules for Companies, Market Abuse Regulation or other regulation would be disseminated as an RNS regulatory announcement and not on Reach.

 

 

Notes

CleanTech Lithium (AIM:CTL, Frankfurt:T2N) is an exploration and development company advancing lithium projects in Chile for the clean energy transition. CleanTech Lithium has two key lithium projects in Chile, Laguna Verde and Viento Andino, and exploration stage project in Arenas Blancas (Salar de Atacama), located in the lithium triangle, a leading centre for battery grade lithium production. CleanTech Lithium and the Mining Ministry in Chile have agreed the contractual terms for the Special Lithium Operating Contract ("CEOL") for Laguna Verde, subject to final ratification.

 

CleanTech Lithium is committed to utilising Direct Lithium Extraction ("DLE") with reinjection of spent brine. Direct Lithium Extraction is a transformative technology which removes lithium from brine with higher recoveries, short development lead times and no extensive evaporation pond construction. For more information, please visit: www.ctlithium.com

 

**ENDS**

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAAKPBQFBKDFQD
Date   Source Headline
30th Apr 20267:00 amRNS-RUpdated Investor Presentation
22nd Apr 20267:00 amRNSUpdate to Legal Claim in Chile
16th Apr 20267:00 amRNS-RTrials to Further Validate PFS Process Design
14th Apr 20267:00 amRNSReplacement: Positive PFS Results RNS
9th Apr 20267:00 amRNSAppointment of Australian Resident Independent NED
31st Mar 20267:00 amRNSPositive Pre-Feasibility Study & Reserves Declared
23rd Mar 20267:00 amRNSVAT refund of over £1 million received
17th Mar 20263:08 pmRNSIssue of Equity, TVR and Blocklisting Application
16th Mar 20268:00 amRNSHolding(s) in Company
10th Mar 20265:53 pmRNSLV CEOL Terms Agreed with Chilean Government
12th Feb 20267:00 amRNSUpdate to CEOL Process and CFO Position
27th Jan 20263:30 pmRNSHolding(s) in Company
6th Jan 20267:00 amRNSAppointment of Project Financial Advisor
5th Jan 20267:00 amRNSCEOL Application for Laguna Verde Submitted
31st Dec 20257:00 amRNS-REnd-of-Year Message from CEO
22nd Dec 20254:23 pmRNSResult of AGM
19th Dec 20257:00 amRNSLaguna Verde New CEOL Streamlined Process Opened
15th Dec 20257:00 amRNSLaguna Verde Indigenous Consultations Concluded
1st Dec 20257:00 amRNSLegal action against subsidiary of CleanTech
28th Nov 20257:00 amRNSNotice of AGM and Electronic Communications
10th Nov 20257:00 amRNSLaguna Verde Resource Increase
3rd Nov 20257:00 amRNSIssue of Equity & Partial Redemption of Loan Notes
23rd Oct 20255:22 pmRNSHolding(s) in Company
20th Oct 20257:00 amRNSUpdate to Certain Laguna Verde Licence Payments
10th Oct 20257:00 amRNS-RInvestor Presentation via Investor Meet Company
6th Oct 20257:00 amRNSAppointment of Jersey Resident Independent NED
1st Oct 20257:00 amRNS-RShareholder Meet and Greet in London
29th Sep 20257:00 amRNSInterim Results for six-months ending 30 June 2025
8th Sep 20257:00 amRNSIssue of Equity and TVR
29th Aug 202512:19 pmRNSResult of GM, Issue of Equity and TVR
29th Aug 20257:00 amRNSResults of Retail Offer
26th Aug 20257:01 amRNSRetail Offer to Shareholders
26th Aug 20257:00 amRNSResults of Broker Option
14th Aug 20255:03 pmRNSGrant of Options
13th Aug 20254:51 pmRNSNotice of General Meeting and Posting of Circular
11th Aug 20258:24 amRNSResults of Placing, Issue of Equity and TVR
11th Aug 20257:00 amRNSAdditional Licences, Fundraising & Board Changes
1st Aug 20257:00 amRNSExtension to Loan Notes Maturity Date
7th Jul 20257:00 amRNSProcess Test-work Progress Update
30th Jun 20257:05 amRNSUpdate to CEOL Appeal
30th Jun 20257:00 amRNSExtension to Loan Notes Maturity Date
12th Jun 202511:00 amRNSFinal Results
30th Apr 20257:00 amRNSUpdate to CEOL Application
23rd Apr 20257:00 amRNSUpdate to CEOL Process
17th Apr 20257:00 amRNS-RCollaboration with DuPont Water Solutions
10th Apr 20257:00 amRNSAppointment of CEO and Director
4th Apr 20257:00 amRNSCEOL Application Process Update
24th Mar 202512:47 pmRNSResult of GM Admission of Retail Offer Shares TVR
10th Mar 20257:00 amRNSResults of Retail Offer & Update on Broker Option
4th Mar 20254:45 pmRNSNotice of General Meeting and Posting of Circular

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.