Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCleantech Lithium Regulatory News (CTL)

Share Price Information for Cleantech Lithium (CTL)

Share Price is delayed by 15 minutes
Get Live Data
8.15    -0.10 (-1.21%)
Bid:
7.80
Ask:
8.50
Spread: 0.70 (8.974%)
Market Cap: £16.64m
CTL Live PriceLast checked at - London Stock Exchange

Intraday Cleantech Lithium Share Chart

Process Test-work Progress Update

7 Jul 2025 07:00

RNS Number : 8607P
CleanTech Lithium PLC
07 July 2025
 

7 July 2025

 

CleanTech Lithium PLC ("CleanTech Lithium" or the "Company")

Process Test-work Progress Update

 

CleanTech Lithium PLC (AIM:CTL), an innovative sustainable lithium developer in Chile, is collaborating with DuPont Water Solutions, a business unit of DuPont, to test lithium processing technology. DuPont has developed a new nanofiltration (NF) membrane technology which aims to remove impurities and maximise lithium recovery. NF is applied in CleanTech Lithium's direct lithium extraction (DLE) downstream process. Trials have recently been completed with highly encouraging results.

 

Test-work Highlights:

· Test-work on lithium processing technology, a new nanofiltration (NF) membrane technology, for high lithium recovery developed by Dupont Water Solutions

· The test-work focused on processing two different concentrations of eluate produced from CleanTech Lithium´s DLE pilot plant in Chile, and measured the key metrics of impurity removal and lithium recovery

· The first trial was based on eluate representative of the average produced from the Company´s DLE pilot plant, while the second trial applied to eluate that had been concentrated approximately 4 times higher by forward osmosis

· The primary impurities targeted by NF are Calcium and Magnesium which showed very high rejection rates while lithium recovery rates were 94% and 92%:

 

Trial 1 - Concentrated Eluate

Trial 2 - Concentrated Eluate

Parameter (mg/L)

Pre-NF

Post NF

Rejection

Pre-NF

Post NF

Rejection

Lithium

2,120

1,990

6%

8,760

8,080

8%

Calcium

284

42

85%

1,200

180

85%

Magnesium

225

9

96%

950

32

97%

 

 

 

 

· The results were in line or exceeded the expected design parameters provided by Dupont Water Solutions with performance minimally impacted by feed concentration

· The membranes were designed to run at a higher pressure than that trialled which would likely increase the lithium recovery rates and reduce reprocess volumes to recover the rejected lithium

· The effectiveness of the NF membrane at high eluate concentrations is positive for application of the technology at much lower feed volumes, reducing Capex and Opex costs

 

Commenting, Ignacio Mehech, Chief Executive Officer, of Cleantech Lithium PLC, said:

"These highly encouraging results mark an important step in our collaboration with DuPont Water Solutions. Calcium and magnesium are among the most difficult impurities to remove in the lithium extraction process, and DuPont's nanofiltration technology has demonstrated excellent rejection rates while maintaining high lithium recovery. This supports our approach to sustainable lithium production and signals the potential for reduced capital and operating costs as we progress towards commercialisation."

 

 

Competent Persons Statement

 

The following professional acts as qualified person, as defined in the AIM Note for Mining, Oil and Gas Companies (June 2009) and JORC Code (2012):

 

Marcelo Bravo: Chemical Engineer (Universidad Católica del Norte), has a Master's Degree in Engineering Sciences major in Mineral Processing, Universidad de Antofagasta. He currently works as a Senior Process Consulting Engineer at the Ad-Infinitum company. Mr Bravo has relevant experience in researching and developing potassium, lithium carbonate, and solar evapo-concentration design processes in Chile, Argentina, and Bolivia. Mr Bravo, who has reviewed and approved the information contained in this announcement, is registered with No. 412 in the public registry of Competent Persons in Mining Resources and Reserves per the Law of Persons Competent and its Regulations in force in Chile. Mr Bravo has sufficient experience relevant to the metallurgical tests and the type of subsequent processing of the extracted brines under consideration and to the activity being carried out to qualify as a competent person, as defined in the JORC Code. Mr Bravo consents to the inclusion in the press release of the matters based on his information in the form and context in which it appears.

 

 

Further Information

 

CleanTech Lithium PLC

Ignacio Mehech/Gordon Stein/Nick Baxter

Jersey office: +44 (0) 1534 668 321

Chile office: +562-32239222

Beaumont Cornish Limited (Nominated Adviser)

Roland Cornish/Asia Szusciak

+44 (0) 20 7628 3396

Fox-Davies Capital Limited (Joint Broker)

Daniel Fox-Davies

+44 (0) 20 3884 8450

daniel@fox-davies.com

Canaccord Genuity (Joint Broker)

James Asensio

+44 (0) 20 7523 4680

Beaumont Cornish Limited ("Beaumont Cornish") is the Company's Nominated Adviser and is authorised and regulated by the FCA. Beaumont Cornish's responsibilities as the Company's Nominated Adviser, including a responsibility to advise and guide the Company on its responsibilities under the AIM Rules for Companies and AIM Rules for Nominated Advisers, are owed solely to the London Stock Exchange. Beaumont Cornish is not acting for and will not be responsible to any other persons for providing protections afforded to customers of Beaumont Cornish nor for advising them in relation to the proposed arrangements described in this announcement or any matter referred to in it.

 

Notes

CleanTech Lithium (AIM:CTL, Frankfurt:T2N) is an exploration and development company advancing lithium projects in Chile for the clean energy transition. CleanTech Lithium has two key lithium projects in Chile, Laguna Verde and Viento Andino, and exploration stage project in Arenas Blancas (Salar de Atacama), located in the lithium triangle, a leading centre for battery grade lithium production.

CleanTech Lithium is committed to utilising Direct Lithium Extraction ("DLE") with reinjection of spent brine resulting in no aquifer depletion. Direct Lithium Extraction is a transformative technology which removes lithium from brine with higher recoveries, short development lead times and no extensive evaporation pond construction. For more information, please visit: www.ctlithium.com

**ENDS**

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUSUORVSUBRAR
Date   Source Headline
30th Apr 20267:00 amRNS-RUpdated Investor Presentation
22nd Apr 20267:00 amRNSUpdate to Legal Claim in Chile
16th Apr 20267:00 amRNS-RTrials to Further Validate PFS Process Design
14th Apr 20267:00 amRNSReplacement: Positive PFS Results RNS
9th Apr 20267:00 amRNSAppointment of Australian Resident Independent NED
31st Mar 20267:00 amRNSPositive Pre-Feasibility Study & Reserves Declared
23rd Mar 20267:00 amRNSVAT refund of over £1 million received
17th Mar 20263:08 pmRNSIssue of Equity, TVR and Blocklisting Application
16th Mar 20268:00 amRNSHolding(s) in Company
10th Mar 20265:53 pmRNSLV CEOL Terms Agreed with Chilean Government
12th Feb 20267:00 amRNSUpdate to CEOL Process and CFO Position
27th Jan 20263:30 pmRNSHolding(s) in Company
6th Jan 20267:00 amRNSAppointment of Project Financial Advisor
5th Jan 20267:00 amRNSCEOL Application for Laguna Verde Submitted
31st Dec 20257:00 amRNS-REnd-of-Year Message from CEO
22nd Dec 20254:23 pmRNSResult of AGM
19th Dec 20257:00 amRNSLaguna Verde New CEOL Streamlined Process Opened
15th Dec 20257:00 amRNSLaguna Verde Indigenous Consultations Concluded
1st Dec 20257:00 amRNSLegal action against subsidiary of CleanTech
28th Nov 20257:00 amRNSNotice of AGM and Electronic Communications
10th Nov 20257:00 amRNSLaguna Verde Resource Increase
3rd Nov 20257:00 amRNSIssue of Equity & Partial Redemption of Loan Notes
23rd Oct 20255:22 pmRNSHolding(s) in Company
20th Oct 20257:00 amRNSUpdate to Certain Laguna Verde Licence Payments
10th Oct 20257:00 amRNS-RInvestor Presentation via Investor Meet Company
6th Oct 20257:00 amRNSAppointment of Jersey Resident Independent NED
1st Oct 20257:00 amRNS-RShareholder Meet and Greet in London
29th Sep 20257:00 amRNSInterim Results for six-months ending 30 June 2025
8th Sep 20257:00 amRNSIssue of Equity and TVR
29th Aug 202512:19 pmRNSResult of GM, Issue of Equity and TVR
29th Aug 20257:00 amRNSResults of Retail Offer
26th Aug 20257:01 amRNSRetail Offer to Shareholders
26th Aug 20257:00 amRNSResults of Broker Option
14th Aug 20255:03 pmRNSGrant of Options
13th Aug 20254:51 pmRNSNotice of General Meeting and Posting of Circular
11th Aug 20258:24 amRNSResults of Placing, Issue of Equity and TVR
11th Aug 20257:00 amRNSAdditional Licences, Fundraising & Board Changes
1st Aug 20257:00 amRNSExtension to Loan Notes Maturity Date
7th Jul 20257:00 amRNSProcess Test-work Progress Update
30th Jun 20257:05 amRNSUpdate to CEOL Appeal
30th Jun 20257:00 amRNSExtension to Loan Notes Maturity Date
12th Jun 202511:00 amRNSFinal Results
30th Apr 20257:00 amRNSUpdate to CEOL Application
23rd Apr 20257:00 amRNSUpdate to CEOL Process
17th Apr 20257:00 amRNS-RCollaboration with DuPont Water Solutions
10th Apr 20257:00 amRNSAppointment of CEO and Director
4th Apr 20257:00 amRNSCEOL Application Process Update
24th Mar 202512:47 pmRNSResult of GM Admission of Retail Offer Shares TVR
10th Mar 20257:00 amRNSResults of Retail Offer & Update on Broker Option
4th Mar 20254:45 pmRNSNotice of General Meeting and Posting of Circular

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.