Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Pakrut Bankable Feasibility Study Update

31 Mar 2010 13:14

Kryso Resources plc (`Kryso' or `the Company') Pakrut Bankable Feasibility Study Update

Kryso Resources plc (AIM: KYS), the gold exploration and development company that is advancing its 2.8 million ounce Pakrut gold project in Tajikistan through a bankable feasibility study (BFS), is pleased to provide a progress update.

On the basis of the grade and extent of near surface mineralisation, the management and consultants of Kryso originally intended the Pakrut gold project to be developed as an open pit mine, with underground development to follow at a later stage. It was on this premise that the BFS was initially prepared by the Beijing General Research Institute of Mining & Metallurgy (BGRIMM), the consulting group appointed by Kryso to complete the study.

However, deeper level drilling of Ore Zone 1 (results announced on 3 June and 18 September 2009 with further results to be announced shortly) has demonstrated that Ore Zone 1 widens significantly at depth. This presents an opportunity for the development of an underground mining operation from the outset, with either decline or shaft access. Ore Zone 1 is the largest ore zone identified at Pakrut to date and remains open at depth-.

It is anticipated that an underground approach would deliver superior economics relative to a combination of open pit and underground mining and would also enable the early exploitation of higher grade ore found at depth, with lower grade near surface ore blended in as required to produce optimal feed for the mill.

The underground mining approach has been adopted by BGRIMM with the further rationale that the major ore zones at Pakrut are vertical in orientation, the surrounding terrain is mountainous and the area of level ground available for surface facilities is relatively limited.

To facilitate the planning and design of an underground mine, which requires additional information to that required for an open pit mine, Kryso staff and consultants have been working on the development of an updated wire-frame model of the Pakrut deposit using a 2g/t Au cut-off grade. This model, which forms part of the BFS, will include all offshore assays from 2009 drilling at Pakrut and is expected to be completed during Q2 2010.

The remainder of the BFS is approximately 80% complete. BGRIMM are currently finalising capital and operating cost estimates, having recently completed all metallurgical test work and process plant and infrastructure design.

The completed and revised BFS is now expected to be available at the end of Q2 2010, following finalisation of the mine plan and financial model.

Dr Trevor Davenport, Non-Executive Chairman and interim Managing Director of Kryso, comments:

`The reorientation of the Pakrut BFS around an underground mine is an essential step towards getting the best out of the Pakrut gold project and the delivery of an optimal mining case is a key precursor to securing financing for the project.'

About the Pakrut Gold Project

The Pakrut gold project, of which Kryso has 100% ownership, is situated in Tajikistan approximately 112 km northeast of the capital city Dushanbe.

Pakrut has total JORC Code-compliant gold resources of approximately 2.8 million ounces (assuming a cut-off grade of 0.5g/t Au) and is located within the Tien Shan gold belt, which extends from Uzbekistan into Tajikistan, Kyrgyzstan and western China, and which hosts a number of multi-million ounce gold deposits.

Drilling at Pakrut has previously returned numerous exciting intersections, including 123.7m at 6.1g/t Au, 42m at 11.2g/t Au and 50m at 5.7g/t Au. Kryso undertakes offshore assaying of its drill samples at the SGS Group laboratory in Johannesburg, South Africa.

A bankable feasibility study (BFS) for the Pakrut project is currently being undertaken by the Beijing General Research Institute of Mining & Metallurgy (BGRIMM).

About Tajikistan

Tajikistan is a secular republic located in Central Asia. The country is a member of the Commonwealth of Independent States (CIS) and the Shanghai Cooperation Organisation. Tajikistan hosts numerous operating precious metal mines as well as the largest aluminium smelter in Central Asia. Kryso's management team has extensive experience in the mining industry in Tajikistan.

All geological results have been approved for release by Dr Trevor Davenport B.Sc, M.Sc, Ph.D, MIMM, C.Eng, Non-Executive Chairman and acting Managing Director of Kryso Resources plc. Dr Davenport has more than 35 years of experience in the mining industry and has consented to the inclusion of the material in the form and context in which it appears.

Glossary

Au: The chemical symbol for gold.

Cut-off grade: The grade used to separate ore and waste such that only material classified as ore will be treated in order to recover the economic metal or mineral of interest.

Bankable feasibility study: A study of the economic viability of the mining and production of base or precious metals or other minerals in such form and containing such detail as is customarily required by a bank or other financial institution engaged in mining project finance to enable it to determine whether to finance the development of a commercial mining operation.

g/t: grams per tonne.

JORC Code: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

m: metre.

oz: troy ounce.

Resource: An estimated tonnage and grade of mineralization in the ground.

t: metric ton.

For further information please visit the Company's website (www.kryso.com) or contact:

Dr. Trevor Davenport/Craig Brown, Kryso Resources plc

Tel: +44 (0) 20 7371 0600

Katy Mitchell, WH Ireland Limited

Tel: +44 (0) 161 832 2174

Christian Dennis, Orbis Equity Partners Limited

Tel: +44 (0) 20 3137 1902

vendor
Date   Source Headline
20th Apr 20153:28 pmBUSResignation of Non-Executive Chairman and Director
16th Apr 20157:00 amBUSOperational Update
31st Mar 20155:13 pmBUSChange of Adviser
19th Mar 20157:00 amBUSIssue of Equity
18th Feb 20157:00 amBUSDirectors' Dealings
17th Feb 20157:00 amBUSDirectors' Dealings
9th Feb 20157:00 amBUSOperational Update
28th Jan 20152:06 pmBUSHong Kong Listing Update
19th Jan 20157:00 amBUSDirectors' Dealings
6th Jan 20151:04 pmBUSHong Kong Listing Update
6th Nov 20144:40 pmRNSSecond Price Monitoring Extn
6th Nov 20144:35 pmRNSPrice Monitoring Extension
28th Oct 20141:13 pmBUSResult of AGM
6th Oct 20147:00 amBUSChina Nonferrous Gold Limited Notice of AGM, Proposals in Relation to Hong Kong Listing and Posting of Delisting Circular
2nd Oct 20143:55 pmBUSIssue of Equity
10th Sep 20142:11 pmBUSInterim Results for the Six-Month Period Ended 30 June 2014
10th Sep 20141:38 pmBUSFiling of Application Proof Prospectus and Update
2nd Sep 20143:23 pmBUSAward of Consultancy Contracts
7th Aug 20141:57 pmBUSHKEx Listing Update
30th Jun 20147:00 amBUSFinal Results
27th Jun 20149:10 amBUSExternal Power Supply Construction Contract
24th Jun 20141:59 pmBUSMine Construction Agreement
13th Jun 20149:43 amBUSDirectorate Change
12th May 20141:54 pmBUSTermination of Option
17th Apr 201411:59 amBUSExploration Licence
9th Apr 20147:00 amBUSIssue of Shares
11th Mar 20147:00 amBUSOperational Update
7th Mar 201412:15 pmBUSResult of Meeting
17th Feb 20147:00 amBUSPosting of Circular
18th Dec 20137:00 amBUSGrant of Options
21st Nov 20137:00 amBUSChange of Name Update
1st Nov 20137:00 amBUSChange of Name Update
29th Oct 20131:27 pmBUSResult of General Meeting and Change of Name
28th Oct 20137:00 amBUSAppointment of Sponsor for Proposed Hong Kong Listing
11th Oct 20139:19 amBUSChange of Name, Notice of General Meeting
30th Sep 20132:55 pmBUSProposed Change of Name and Board Changes
27th Sep 20137:00 amBUSInterim Results for the Six-Month Period Ended 30 June 2013
14th Aug 201310:43 amBUSAWARD OF CONTRACTS FOR FLOTATION CELLS, CRUSHERS AND BALL MILLS - Replacement
14th Aug 20139:35 amBUSMiscellaneous
8th Aug 201310:13 amBUSAWARD OF EXTERNAL POWER SUPPLY CONSTRUCTION CONTRACT
31st Jul 20138:00 amBUSAdmission to Trading on AIM
30th Jul 201312:56 pmBUSCourt Sanction of Scheme
30th Jul 20137:30 amRNSSuspension - Kryso Resources Plc
29th Jul 20139:53 amBUSTemporary Suspension
1st Jul 20137:00 amBUSResult of AGM
17th Jun 20137:00 amBUSSRK’s Independent Technical Report Endorses Updated BFS Compiled by BGRIMM
7th Jun 20135:10 pmBUSFinal Results
24th May 20131:18 pmBUSResults of Voting at Court Meeting and General Meeting
20th May 20131:55 pmBUSHolding(s) in Company
8th May 20137:36 amBUSIntroduction of a New Aim-Listed Holding Company, Incorporated in the Cayman Islands

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.