PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.55
Bid: 3.40
Ask: 3.70
Change: 0.00 (0.00%)
Spread: 0.30 (8.824%)
Open: 3.55
High: 3.55
Low: 3.55
Prev. Close: 3.55
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

19 Mar 2008 08:13

Roxi Petroleum Plc19 March 2008 Operations Update Roxi Petroleum plc ("Roxi" or "the Company"), the Kazakhstan based oilexploration and development company, that on 3 March 2008 acquired 59% of EragonPetroleum Plc for US$190m satisfied by the allotment of 145m ordinary shares at65 pence per share, announces the current operational status of all of theassets operated by Roxi. Rob Schoonbrood, CEO, said, "We are hard at work to accelerate the progress ofall of the oilfields now included in Roxi's portfolio of oil and gas assets. Wewill keep our investors abreast of all significant developments on a regularbasis." Ravninnoe Contract Area Roxi has completed the acquisition of a 193 km2 3D seismic survey over theContract Area located in Mangistau and Atyrau Oblasts of Western Kazakhstan. Atthe end of January, 2008 the final data was delivered by the seismic contractor,KazGeCo, to Veritas Caspian LLP for processing. The survey is designed toresolve the detail of the Ravninnoe oilfield, which Roxi believes is acombination of structurally and stratigraphically closed clastic reservoirs inthe Middle Carboniferous. On the 12 March 2008, Roxi began the first of five well re-entries planned for2008 to establish the condition of the wellbores and possibly test-produce thereservoir. These wells were drilled in the 1980's and encountered oil shows inCarboniferous sandstones at depths between 3200m and 3300m, Roxi will acquiremodern wireline log data and perforate and test the Carboniferous reservoirs ifthe wellbores are in safe and sound condition. Beibars Contract Area Roxi has completed all environmental and regulatory permissions in order toacquire a 121km2 3D seismic survey over the Contract Area located in theMangistau Oblast of Western Kazakhstan. This survey was originally planned forthe fourth-quarter of 2007 but was delayed for 3 months due to proceduralmatters. A further delay has been encountered pending resolution of a recentconflict in land use rights issued to both Roxi and the Kazakhstan Ministry ofDefense which is considering the surface area for use in training exercises.Discussions with the local Land Use Authority have taken place to seek aworkable solution. Subject to resolution of this issue, the Seismic Contractor,KazGeCo, will mobilize and begin work in mid 2008. Galaz Contract Area (NW Konus) The acquisition of approximately 30km2 of 3D seismic was completed in its Galaz(NW Konus) Contract Area located in the Kyzylorda Oblast of Central Kazakhstan.The seismic contractor, Azimut, completed the acquisition of the survey inJanuary 2008. The dataset is currently being processed by Geostan. The objectiveof the survey is to better define the structural and stratigraphic detail of theUpper Jurassic reservoir sands with existing proven, probable, and possiblereserves. The survey will also assess the exploration potential in the lowerCretaceous-Neocomian sands and in deeper undrilled Jurassic sequences. Wells #26 and 27 were re-entered the fourth quarter of 2007. Well #26 was re-perforated in the Jurassic sands at a depth of 1330m and 10m3 of oil and waterwere recovered to surface. Well #27 was re-perforated in Cretaceous sands at adepth of 1315m and 50m3 of oil and water were recovered to surface. Roxi willinstall a pump to test Well #27 within the month. Basic production equipment isbeing installed to test Well #26. Tenders for new well drilling have been received and a contract will be awardedto begin drilling in the second quarter of 2008. BNG Contract Area (Ayrshagyl) Roxi has applied for an extension of a portion of the Contract Area in its BNG(Ayrshagyl) Contract Area located in the Mangistau Oblast of Western Kazakhstanto cover structures within the original block. Should the extension be granted, the company will perform gravity and seismicsurvey programs on this area and elsewhere on the block in 2008. Munaily Contract Area Two wells were drilled on its Munaily Contract Area located in the Atyrau Oblastof Western Kazakhstan in the fourth quarter of 2007. Well H1 was drilled to a total depth of 1270m and encountered a 12m grossthickness of oil bearing Jurassic sands at 1228m. The well was completed and putonto production test in January 2008. The well has flowed under natural flow atrates of approximately 80 barrels of oil per day over a 30 day period, Uponcompletion of testing, further prospective zones existing in the wellbore willbe perforated and tested. Well H2 was drill to a depth of 600m and encountered initial indications of oilin existing reservoirs. Further work is needed to test this and other zones inthe well. Enquiries: Roxi Petroleum plc Rob Schoonbrood, CEO +7 727 244 0920 David Barker, COO +7 727 244 0920 College Hill (Financial PR) Paddy Blewer +44 (0) 20 7457 2020 Nick Elwes +44 (0) 20 7457 2020 WH Ireland (NOMAD and broker) James Joyce/David Porter +44 (0) 20 7220 1666 Qualified person Duncan McDougall, Technical Director of Roxi Petroleum and a Fellow in theGeological Society, London, has reviewed and approved the technical disclosurein this announcement. He holds a BSc in Geology and has 25 years internationalexperience of exploration, appraisal, and development of oilfields in a varietyof environments. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
11th Apr 20127:00 amRNSOperational update
20th Mar 20127:00 amRNSBNG Farm-out
8th Mar 20127:00 amRNSOperational Update
8th Feb 201212:36 pmRNSOperational Update
23rd Jan 20127:01 amRNSNW Konys Commences Pilot Production
3rd Jan 20127:00 amRNSNW Konys Pilot Production Consent Update
22nd Dec 20111:25 pmRNSOil Well Spudding
19th Dec 20117:00 amRNSSpudding of BNG Well 136
15th Dec 201112:38 pmRNSREPLACEMENT - Award of options
15th Dec 20117:00 amRNSAward of options
7th Dec 20117:00 amRNSGas Flaring Consent Update
29th Nov 20117:01 amRNSNK-10 Well Spudded 28 November 2011
22nd Nov 20117:00 amRNSOperational Update
18th Nov 201110:01 amRNSDirector/PDMR Shareholding
9th Nov 20115:00 pmRNSHolding(s) in Company
2nd Nov 201112:51 pmRNSHolding(s) in Company
1st Nov 20117:00 amRNSOperational Update
31st Oct 20111:15 pmRNSDirector/PDMR Shareholding
20th Oct 20117:00 amRNSOperational Update
17th Oct 201111:28 amRNSDirector/PDMR Shareholding
29th Sep 20118:51 amRNSReplacement of New Debt Facility
29th Sep 20117:00 amRNSNew debt facility
26th Sep 20117:00 amRNSInterim Results
8th Sep 201112:09 pmRNSShare Price Movement
18th Jul 20117:00 amRNSOperational Update
27th Jun 201111:21 amRNSResult of AGM
27th Jun 20117:00 amRNSBNG Operational Update
6th Jun 20117:00 amRNSAppointment of Nominated Adviser and Broker
27th May 20117:00 amRNSAnnual Report and Accounts and Notice of AGM
20th May 20117:00 amRNSPreliminary Results
11th May 20117:00 amRNSCancellation of 35 per cent sale of the BNG Asset
3rd Mar 20117:00 amRNSCanamens BNG Funding Announcement
22nd Feb 20117:00 amRNSOperational and Business Update
14th Feb 201110:39 amRNSElemes 135 Well Results
28th Jan 20118:58 amRNSOperations Update
27th Jan 20117:00 amRNSOperational Update
13th Jan 20117:00 amRNSGrant of Options and Directors' Shareholdings
12th Jan 20117:00 amRNSOperational and Business Update
10th Jan 201111:59 amRNSNW Konys Pilot Production Consent Update
7th Jan 20118:50 amRNSYelemes 135 Well Spud
13th Dec 20101:03 pmRNSNK 20 Well Spud
1st Dec 20107:00 amRNSOperational and Business Update
15th Nov 20107:00 amRNSOperational Update
8th Nov 20107:00 amRNSChange of Registered Address & Company Secretary
12th Oct 201010:17 amRNSSale of Ravninnoe Oil LLP Interest
16th Sep 20107:00 amRNSBNG Operational Update
8th Sep 20107:00 amRNSNotice of Results
10th Aug 20109:00 amRNSOperational Update
3rd Aug 20107:00 amRNSGalaz update
14th Jul 20107:00 amRNSRavninnoe and BNG Operations update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.