Q3 2023 Operations Update

10 Oct 2023 07:00

RNS Number : 4697P
Central Asia Metals PLC
10 October 2023

10 October 2023

CENTRAL ASIA METALS PLC

('CAML' or the 'Company') Q3 2023 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q3 2023 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

Q3 2023 operational summary

- Zero lost time injuries ('LTIs') at Kounrad or Sasa

- Kounrad copper production, 3,661 tonnes

- Sasa zinc in concentrate production, 5,127 tonnes

- Sasa lead in concentrate production, 7,039 tonnes

Outlook

- On track to achieve 2023 full year guidance:

o Copper: 13,000 to 14,000 tonnes

o Zinc in concentrate: 19,000 to 21,000 tonnes

o Lead in concentrate: 27,000 to 29,000 tonnes

CAML production summary

Metal production (tonnes)

Q3 2023

Q2 2023

Q1 2023

9m 2023

9m 2022

Copper

3,661

3,380

3,336

10,377

10,685

Zinc

5,127

4,847

4,917

14,891

16,211

Lead

7,039

7,116

6,618

20,773

20,726

Nigel Robinson, Chief Executive Officer, commented:

"We are pleased to report another solid period of base metal production during Q3 2023, and we remain on schedule to meet our full year guidance. Importantly, this production has been delivered safely as we have reported zero LTIs at both operations.

"During Q3 2023 we reached the impressive milestone of having generated over $1 billion in revenue from Kounrad in our 11 years of operations. This is a fantastic achievement from the Kounrad team, especially given that the copper has all been produced from waste material.

"As we look towards the end of the year, we will further progress our investments at Sasa, as well as complete construction and commissioning of our Kounrad Solar Power Plant, which should start generating electricity for us before the end of 2023."

Health and Safety

There were no LTIs reported at either Kounrad or Sasa during Q3 2023 and in the nine months to 30 September 2023, there has only been one Group LTI.

Kounrad

Kounrad Q3 2023 copper production of 3,661 tonnes brings output for the first nine months of 2023 to 10,377 tonnes. Copper sales during Q3 2023 were 3,903 tonnes.

Solid progress on the construction of the 4.77MW solar farm was achieved during Q3 2023 and at the end of the period the physical installation works were substantially completed. Commissioning of the facility is expected to commence before the end of October, and it is forecast that during the coming winter period it will be contributing around 10% of daily power requirement.

Sasa

In Q3 2023, mined and processed ore were 199,085 tonnes and 199,427 tonnes respectively, bringing the total for the first nine months of the year to 595,319 tonnes mined and 596,099 tonnes processed. The average head grades for the Q3 2023 period were 3.04% zinc and 3.79% lead, and for the first nine months of the year were on average 2.94% and 3.74% respectively. The average Q3 2023 metallurgical recoveries were 84.6% for zinc and 93.1% for lead.

Sasa produces a zinc concentrate and a separate lead concentrate. In Q3 2023, 10,249 tonnes of concentrate containing 50.0% zinc and 9,919 tonnes of concentrate containing 71.0% lead were produced. This brings total production for the first nine months of 2023 to 29,506 tonnes of zinc concentrate at a grade of 50.5% and 29,221 tonnes of lead concentrate at a grade of 71.1%.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2023 payable production was 4,307 tonnes of zinc and 6,687 tonnes of lead, bringing total payable production for the nine-month period to 12,530 tonnes of zinc and 19,734 tonnes of lead.

Payable base metal in concentrate sales for Q3 2023 were 4,097 tonnes of zinc and 7,252 tonnes of lead.

During Q3 2023, Sasa sold 95,044 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.

Units

Q3 2023

Q2 2023

Q1 2023

9m 2023

9m 2022

Ore mined

t

199,085

199,731

196,503

595,319

602,587

Plant feed

t

199,427

200,705

195,968

596,099

604,478

Zinc grade

%

3.04

2.85

2.95

2.94

3.16

Zinc recovery

%

84.6

84.7

85.2

84.8

84.9

Lead grade

%

3.79

3.85

3.59

3.74

3.66

Lead recovery

%

93.1

92.1

94.2

93.1

93.7

Zinc concentrate

t (dry)

10,249

9,541

9,716

29,506

32,323

- Grade

%

50.0

50.8

50.6

50.5

50.2

- Contained zinc

t

5,127

4,847

4,917

14,891

16,211

Lead concentrate

t (dry)

9,919

10,020

9,282

29,221

29,172

- Grade

%

71.0

71.0

71.3

71.1

71.0

- Contained lead

t

7,039

7,116

6,618

20,773

20,726

Phase two of the Central Decline development at depths beneath the 910 metre level is underway and, as at 30 September 2023, the decline had been developed down to 860 metres. While Sasa awaits a component to enable testing of cemented backfill, mining on the 800 metre level that has been prepared for paste fill mining operations has now commenced. Construction of the dry stack tailings plant project has commenced, as has land clearance for the dry stack tailings landform.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson

CEO

Gavin Ferrar

CFO

Louise Wrathall

louise.wrathall@centralasiametals.com

Director of Corporate Development

Emma Chetwynd Stapylton

emma.chetwyndstapylton@centralasiametals.com

Investor Relations Manager

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

David McKeown

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Thomas Rider

Pascal Lussier Duquette

BlytheRay (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Megan Ray

Note to editors:

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia.

For further information, please visit www.centralasiametals.com and follow CAML on Twitter at @CamlMetals and on LinkedIn at Central Asia Metals Plc.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
UPDQKLFBXBLFFBQ
Date   Source Headline
5th Apr 20174:01 pmRNSHolding(s) in Company
4th Apr 20177:00 amRNSQ1 2017 Production Update
4th Apr 20177:00 amRNSFinal Results
15th Mar 20177:00 amRNSNotice of Preliminary Results
19th Jan 20174:08 pmRNSHolding(s) in Company
18th Jan 20177:00 amRNSResults of the Copper Bay DFS
5th Jan 20177:00 amRNS2016 Operations Update
12th Dec 201612:46 pmRNSDirector/PDMR Shareholding
22nd Nov 20163:13 pmRNSAgreement signed to acquire Shuak copper property
5th Oct 20167:00 amRNSQ3 2016 Operations Update
13th Sep 20163:03 pmRNSUpdate research from QuotedData
12th Sep 20167:00 amRNSHalf-year Report
22nd Aug 201610:00 amRNSNew corporate website
22nd Aug 20167:00 amRNSNotice of Results
4th Jul 201612:34 pmRNSHolding(s) in Company
4th Jul 20167:00 amRNSOperations Update to 30 June 2016
8th Jun 20161:05 pmRNSResult of AGM
9th May 20168:00 amRNSExercise of Options and Directors' Dealings
27th Apr 20165:57 pmRNSAnnual Report and Accounts 2015 and Notice of AGM
21st Apr 201610:47 amRNSUpdate research from QuotedData
19th Apr 20167:30 amRNSGrant of Options
11th Apr 20168:09 amRNSNet Asset Value(s)
11th Apr 20167:00 amRNSFinal Results
7th Apr 20167:00 amRNSQ1 2016 Production Update
23rd Mar 20169:18 amRNSNotice of Results
9th Mar 20167:45 amRNSInitiation Research from QuotedData
15th Jan 201612:36 pmRNSHolding(s) in Company
6th Jan 20167:00 amRNS2015 Production Update and 2016 Outlook
8th Dec 20153:29 pmRNSAppointment of Non-Executive Director
30th Nov 201511:00 amRNSHolding(s) in Company
23rd Nov 20157:00 amRNSKounrad Update
5th Oct 20157:00 amRNSQ3 2015 Production Update
14th Sep 20157:00 amRNSHalf Yearly Report
28th Aug 201510:00 amRNSNotification of Major Interest in Shares
27th Aug 201510:30 amRNSNotice of Results
26th Aug 201512:57 pmRNSNotification of Major Interest in Shares
3rd Jul 20157:00 amRNSKounrad Production Update
29th Jun 20157:00 amRNSKounrad Production Update
25th Jun 20157:30 amRNSExercise of Options and Directors' Dealings
24th Jun 20157:00 amRNSUpdate on Copper Bay Investment
17th Jun 20151:20 pmRNSResult of AGM
21st May 20157:00 amRNSKounrad Expansion Update
20th May 20154:30 pmRNSPosting Notice of Meeting and Dividend Timetable
23rd Apr 20157:31 amRNSDirector Shareholding
23rd Apr 20157:30 amRNSGrant of Options
21st Apr 20154:48 pmRNSAnnual Report and Accounts 2014
15th Apr 201511:21 amRNSProposed Share Premium Cancellation& result of EGM
7th Apr 20157:00 amRNSQ1 2015 Production Update
30th Mar 20157:01 amRNSCircular and Notice of EGM
30th Mar 20157:00 amRNS2014 Full Year Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.