SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    2.60 (1.95%)
Bid:
136.00
Ask:
136.60
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q3 2023 Operations Update

10 Oct 2023 07:00

RNS Number : 4697P
Central Asia Metals PLC
10 October 2023

10 October 2023

CENTRAL ASIA METALS PLC

('CAML' or the 'Company') Q3 2023 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q3 2023 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

Q3 2023 operational summary

- Zero lost time injuries ('LTIs') at Kounrad or Sasa

- Kounrad copper production, 3,661 tonnes

- Sasa zinc in concentrate production, 5,127 tonnes

- Sasa lead in concentrate production, 7,039 tonnes

Outlook

- On track to achieve 2023 full year guidance:

o Copper: 13,000 to 14,000 tonnes

o Zinc in concentrate: 19,000 to 21,000 tonnes

o Lead in concentrate: 27,000 to 29,000 tonnes

CAML production summary

Metal production (tonnes)

Q3 2023

Q2 2023

Q1 2023

9m 2023

9m 2022

Copper

3,661

3,380

3,336

10,377

10,685

Zinc

5,127

4,847

4,917

14,891

16,211

Lead

7,039

7,116

6,618

20,773

20,726

Nigel Robinson, Chief Executive Officer, commented:

"We are pleased to report another solid period of base metal production during Q3 2023, and we remain on schedule to meet our full year guidance. Importantly, this production has been delivered safely as we have reported zero LTIs at both operations.

"During Q3 2023 we reached the impressive milestone of having generated over $1 billion in revenue from Kounrad in our 11 years of operations. This is a fantastic achievement from the Kounrad team, especially given that the copper has all been produced from waste material.

"As we look towards the end of the year, we will further progress our investments at Sasa, as well as complete construction and commissioning of our Kounrad Solar Power Plant, which should start generating electricity for us before the end of 2023."

Health and Safety

There were no LTIs reported at either Kounrad or Sasa during Q3 2023 and in the nine months to 30 September 2023, there has only been one Group LTI.

Kounrad

Kounrad Q3 2023 copper production of 3,661 tonnes brings output for the first nine months of 2023 to 10,377 tonnes. Copper sales during Q3 2023 were 3,903 tonnes.

Solid progress on the construction of the 4.77MW solar farm was achieved during Q3 2023 and at the end of the period the physical installation works were substantially completed. Commissioning of the facility is expected to commence before the end of October, and it is forecast that during the coming winter period it will be contributing around 10% of daily power requirement.

Sasa

In Q3 2023, mined and processed ore were 199,085 tonnes and 199,427 tonnes respectively, bringing the total for the first nine months of the year to 595,319 tonnes mined and 596,099 tonnes processed. The average head grades for the Q3 2023 period were 3.04% zinc and 3.79% lead, and for the first nine months of the year were on average 2.94% and 3.74% respectively. The average Q3 2023 metallurgical recoveries were 84.6% for zinc and 93.1% for lead.

Sasa produces a zinc concentrate and a separate lead concentrate. In Q3 2023, 10,249 tonnes of concentrate containing 50.0% zinc and 9,919 tonnes of concentrate containing 71.0% lead were produced. This brings total production for the first nine months of 2023 to 29,506 tonnes of zinc concentrate at a grade of 50.5% and 29,221 tonnes of lead concentrate at a grade of 71.1%.

Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2023 payable production was 4,307 tonnes of zinc and 6,687 tonnes of lead, bringing total payable production for the nine-month period to 12,530 tonnes of zinc and 19,734 tonnes of lead.

Payable base metal in concentrate sales for Q3 2023 were 4,097 tonnes of zinc and 7,252 tonnes of lead.

During Q3 2023, Sasa sold 95,044 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.

Units

Q3 2023

Q2 2023

Q1 2023

9m 2023

9m 2022

Ore mined

t

199,085

199,731

196,503

595,319

602,587

Plant feed

t

199,427

200,705

195,968

596,099

604,478

Zinc grade

%

3.04

2.85

2.95

2.94

3.16

Zinc recovery

%

84.6

84.7

85.2

84.8

84.9

Lead grade

%

3.79

3.85

3.59

3.74

3.66

Lead recovery

%

93.1

92.1

94.2

93.1

93.7

Zinc concentrate

t (dry)

10,249

9,541

9,716

29,506

32,323

- Grade

%

50.0

50.8

50.6

50.5

50.2

- Contained zinc

t

5,127

4,847

4,917

14,891

16,211

Lead concentrate

t (dry)

9,919

10,020

9,282

29,221

29,172

- Grade

%

71.0

71.0

71.3

71.1

71.0

- Contained lead

t

7,039

7,116

6,618

20,773

20,726

Phase two of the Central Decline development at depths beneath the 910 metre level is underway and, as at 30 September 2023, the decline had been developed down to 860 metres. While Sasa awaits a component to enable testing of cemented backfill, mining on the 800 metre level that has been prepared for paste fill mining operations has now commenced. Construction of the dry stack tailings plant project has commenced, as has land clearance for the dry stack tailings landform.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson

CEO

Gavin Ferrar

CFO

Louise Wrathall

louise.wrathall@centralasiametals.com

Director of Corporate Development

Emma Chetwynd Stapylton

emma.chetwyndstapylton@centralasiametals.com

Investor Relations Manager

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

David McKeown

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Thomas Rider

Pascal Lussier Duquette

BlytheRay (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Megan Ray

Note to editors:

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia.

For further information, please visit www.centralasiametals.com and follow CAML on Twitter at @CamlMetals and on LinkedIn at Central Asia Metals Plc.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
UPDQKLFBXBLFFBQ
Date   Source Headline
11th Jun 20265:40 pmRNSTR-1: Form for notification of major holdings
10th Jun 20267:00 amRNSTrading Update and Outlook
9th Jun 20265:14 pmRNSTR-1: Notification of major holdings
9th Jun 20267:00 amRNSTR-1: Notification of major holdings
8th Jun 202612:25 pmRNSShare Purchase by a Director
2nd Jun 20269:36 amRNSTR-1: Notification of major holdings
2nd Jun 20267:06 amRNSProposed acquisition of Cygnus Metals Limited
29th May 20266:03 pmRNSTR-1: Notification of major holdings
20th May 202612:14 pmRNSTR-1: Notification of major holdings
19th May 20265:47 pmRNSTR-1: Notification of major holdings
18th May 20262:37 pmRNSResults of 2026 Annual General Meeting (AGM)
11th May 202612:03 pmRNSShare Premium Cancellation Effective
6th May 20266:00 pmRNSTR-1: Notification of major holdings
5th May 202610:59 amRNSTR-1: Notification of major holdings
1st May 20263:24 pmRNSTR-1: Notification of major holdings
30th Apr 202611:32 amRNSChange of registered office address
16th Apr 20267:00 amRNSQ1 2026 Operations Update
15th Apr 20269:17 amRNSAnnual Report and Accounts 2025 and Notice of AGM
15th Apr 20267:00 amRNSPublication of 2025 Sustainability Report
10th Apr 20261:14 pmRNSTR-1: Notification of major holdings
31st Mar 202612:49 pmRNSTotal Voting Rights
30th Mar 202611:40 amRNSResults of Extraordinary General Meeting
30th Mar 20268:28 amRNSTR-1: Notification of major holdings
19th Mar 20267:00 amRNS2025 Full-Year Results
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
10th Mar 20267:00 amRNSProposed Share Premium Cancellation and EGM Notice
5th Mar 20267:00 amRNSTransaction in Own Shares
4th Mar 20267:00 amRNSTransaction in Own Shares
3rd Mar 20267:00 amRNSSasa Mineral Resource and Ore Reserve Statement
3rd Mar 20267:00 amRNSNotice of Results
3rd Mar 20267:00 amRNSTransaction in Own Shares
2nd Mar 20267:00 amRNSTransaction in Own Shares
27th Feb 20265:43 pmRNSTotal Voting Rights
18th Feb 20267:00 amRNSTransaction in Own Shares
17th Feb 20267:00 amRNSTransaction in Own Shares
16th Feb 20267:00 amRNSTransaction in Own Shares
13th Feb 20267:00 amRNSTransaction in Own Shares
12th Feb 20267:00 amRNSTransaction in Own Shares
6th Feb 20265:04 pmRNSTR-1: Notification of major holdings
5th Feb 20267:00 amRNSTransaction in Own Shares
4th Feb 20267:00 amRNSTransaction in Own Shares
3rd Feb 20267:00 amRNSTransaction in Own Shares
2nd Feb 20267:00 amRNSTransaction in Own Shares
30th Jan 20265:46 pmRNSTotal Voting Rights
28th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
22nd Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
19th Jan 20267:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.