SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

Q3 2016 Operations Update

5 Oct 2016 07:00

RNS Number : 6898L
Central Asia Metals PLC
05 October 2016
 

5 October 2016

 

 

CENTRAL ASIA METALS PLC

("CAML" or the "Company")

 

Q3 2016 Operations Update

 

 

Central Asia Metals plc (AIM: CAML) today provides a Q3 2016 production and Stage 2 Expansion update for the Kounrad dump leach, solvent extraction and electro-winning (SX-EW) copper recovery plant in Kazakhstan ("Kounrad").

Summary:

·

Record quarterly copper production during Q3 2016, up 38% to 4,102 tonnes (Q3 2015: 2,966 tonnes)

·

2016 copper production to 30 September up 31% to 11,010 tonnes (to 30 September 2015: 8,410 tonnes)

·

Record monthly copper production of 1,503 tonnes in August 2016

·

2016 copper cathode sales to 30 September up 38% to 10,646 tonnes (to 30 September 2015: 7,699 tonnes)

·

On track to achieve upper end of 2016 production guidance of between 13,000 and 14,000 tonnes

·

Stage 2 Expansion on schedule for completion in October and approximately 25% below budget

 

Kounrad Q3 2016 production

Kounrad Q3 production of 4,102 tonnes of copper cathode brings production for the first nine months of 2016 to 11,010 tonnes of copper cathode, a 31% increase on the corresponding period of 2015.

Copper cathode sales to 30 September 2016 of 10,646 tonnes represents an increase of 38% on the nine months to 30 September 2015. The copper was sold predominantly through CAML's off-take sales arrangement with Traxys.

Stage 2 Expansion update

The Stage 2 Expansion, comprising construction of the buildings, collector trenches, ponds and pipeline infrastructure to connect the SX-EW plant to the Western Dumps area, is on schedule and nearing completion and is approximately 25% under budget. Completion of this project will extend the life of the operation beyond 2030.

Electrical aspects of the project are complete, including the overhead power lines and sub-station construction. The required solution ponds have been excavated and lined, and the collector trenches will be completed in October, as will the irrigation system on the initial leaching blocks. The pregnant leach solution (PLS) and raffinate pipes from the Western Dumps to the SX-EW plant are now in position.

Nick Clarke, Executive Chairman, commented:

"We are delighted to report record quarterly production from our Kounrad plant, and expect to achieve annual copper production towards the upper end of the 13,000 to 14,000 tonne guidance range. Looking ahead, we have nearly completed our Stage 2 Expansion and will begin leaching copper from the Western Dumps in Q2 2017. As a result of the devaluation of the Kazakhstan Tenge as well as some engineering cost savings, we remain confident that we can complete this capex programme approximately 25% below our initial budget of US$19.5m. In Q4 2016, we will also complete the definitive feasibility study that is currently being concluded on our Copper Bay project in Chile."

 

For further information contact:

 

Central Asia Metals plc

 

Tel: +44 (0) 20 7898 9001

Nick Clarke, Executive Chairman

Nigel Robinson, CFO

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

 

 

Peel Hunt (Nominated Adviser & Joint Broker)

 

Tel: +44 (0) 20 7418 8900

Matthew Armitt

Ross Allister

 

 

Mirabaud Securities (Joint Broker)

Tel: +44 (0) 20 7878 3362

Peter Krens

 

 

 

Bell Pottinger (PR Advisers)

Tel: +44 (0) 20 3772 2500

Aarti Iyer

Richard Crowley

 

 

 

Note to editors:

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in Kazakhstan. The Company also has a 75% equity interest in Copper Bay Ltd, which is a private company conducting a definitive feasibility study at its copper project in Chañaral Bay, Chile. For further information, please visit www.centralasiametals.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFEEIFLSIIR
Date   Source Headline
19th Sep 20187:00 amRNSInterim Results for Six Months Ended 30 June 2018
30th Aug 20187:00 amRNSNotice of Interim Results
10th Jul 20187:00 amRNSH1 2018 Operations Update
14th Jun 201811:11 amRNSExercise of Options/PDMR Dealing Notification
23rd May 20181:09 pmRNSResults of Annual General Meeting
3rd May 20187:30 amRNSGrant of Options
27th Apr 20187:00 amRNSAppointment of Chief Operating Officer
26th Apr 20183:34 pmRNSAnnual Report & Accounts 2017, Notice of 2018 AGM
12th Apr 20187:00 amRNSQ1 2018 Operations Update
12th Apr 20187:00 amRNS2017 Full Year Results
29th Mar 20187:00 amRNSNotice of Results
9th Feb 201811:58 amRNSStandard form for notification of major holdings
9th Feb 201811:56 amRNSDirector Dealing Notification
8th Feb 20186:30 pmRNSResult of Placing of Shares in Central Asia Metals
8th Feb 20184:37 pmRNSProposed Placing of Shares in Central Asia Metals
15th Jan 20187:00 amRNS2017 Operations Update
30th Nov 20174:35 pmRNSTotal Voting Rights
17th Nov 20177:45 amRNSUpdate research from QuotedData
6th Nov 20178:00 amRNSCompletion of acquisition and Readmission
1st Nov 201710:00 amRNSSchedule One update - Central Asia Metals Plc
1st Nov 20177:00 amRNSExpected date of completion of the Acquisition
17th Oct 20174:11 pmRNSHolding(s) in Company
16th Oct 20175:30 pmRNSStandard form for notification of major holdings
16th Oct 20175:01 pmRNSStandard form for notification of major holdings
13th Oct 20173:38 pmRNSStandard form for notification of major holdings
13th Oct 20173:21 pmRNSStandard form for notification of major holdings
12th Oct 20171:02 pmRNSTR-1: Form for notification of major holdings
12th Oct 201712:54 pmRNSDirector Dealing Notification
11th Oct 201712:13 pmRNSResults of Extraordinary General Meeting
6th Oct 201710:30 amRNSSchedule One - Central Asia Metals Plc
3rd Oct 20177:00 amRNSQ3 2017 Operations Update
25th Sep 20177:30 amRNSRestoration - Central Asia Metails plc
25th Sep 20177:00 amRNSAdmission Document and Notice of General Meeting
22nd Sep 20173:14 pmRNSRESULTS OF PLACING
22nd Sep 20177:02 amRNSProposed Placing
22nd Sep 20177:01 amRNSProposed acquisition of Lynx Resources Limited
22nd Sep 20177:00 amRNSInterim Results
20th Sep 20179:00 amRNSStandard form for notification of major holdings
4th Sep 20177:30 amRNSSuspension - Central Asia Metals plc
4th Sep 20177:00 amRNSIntended Transaction and Suspension of Trading
14th Aug 20179:58 amRNSHolding(s) in Company
10th Aug 20175:01 pmRNSHolding(s) in Company
5th Jul 20177:00 amRNSOperations Update to 30 June 2017
31st May 201712:51 pmRNSAGM Results
23rd May 201712:08 pmRNSUpdate research from QuotedData
5th May 20176:02 pmRNSShare Pledge by a Director
27th Apr 20175:45 pmRNSPosting of Annual Report and Notice of AGM
25th Apr 20172:00 pmRNSUpdate research from QuotedData
24th Apr 20177:30 amRNSGrant of Options
13th Apr 20174:26 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.