SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
136.20    2.60 (1.95%)
Bid:
136.00
Ask:
136.60
Spread: 0.60 (0.441%)
Market Cap: £232.09m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

H1 2018 Operations Update

10 Jul 2018 07:00

RNS Number : 0736U
Central Asia Metals PLC
10 July 2018
 

10 July 2018

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

H1 2018 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a H1 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia ('Sasa').

Highlights

- Kounrad

o H1 2018 copper production, 6,747 tonnes

- Sasa

o H1 2018 zinc in concentrate production, 11,020 tonnes

o H1 2018 lead in concentrate production, 14,386 tonnes

- On track to meet 2018 production guidance

o Copper 13,000 to 14,000 tonnes

o Zinc in concentrate 21,000 to 23,000 tonnes

o Lead in concentrate 28,000 to 30,000 tonnes

- Shuak

o 2018 exploration programme underway, 11,550 metres drilled in H1 2018

- Cash in the bank on 30 June 2018, $40.5m

 

CAML production summary

Metal production (tonnes)

Q2 2018

Q1 2018

H1 2018

H1 2017*

Copper

3,677

3,070

6,747

7,027

Zinc

5,502

5,518

11,020

10,739

Lead

7,366

7,020

14,386

14,879

*H1 2017 zinc and lead production pre-date CAML ownership

Nigel Robinson, Chief Executive Officer, commented:

"After a particularly cold winter in Kazakhstan during Q1, we had a solid Q2 and were pleased with our overall H1 2018 Kounrad copper production. At Sasa, which we have now owned and operated for eight months, we are also pleased with our zinc and lead output and we are firmly on track to meet annual guidance for the three metals.

"During Q2 2018, we made several senior management changes that we believe have both strengthened and provided continuity to our business. Our integration of Sasa into the CAML Group is progressing well and we have commenced a life of mine ('LOM') technical study that should ensure the optimal future of the operation. The Company continues to assess additional business opportunities."

Kounrad

Kounrad Q2 2018 copper production of 3,677 tonnes brings output for the first six months of 2018 to 6,747 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 75,173 tonnes.

4,312 tonnes of CAML's H1 2018 cathode production was leached from the Western Dumps, equating to approximately 64% of total output.

Copper sales during H1 2018 were 6,044 tonnes and 763 tonnes were in stock as at 30 June 2018. The cathode was sold predominantly through CAML's offtake partner, Traxys.

Sasa

In Q2 2018, mined and processed ore were 198,560 tonnes and 197,241 tonnes respectively, bringing the H1 2018 total to 390,932 tonnes of ore mined and 393,605 tonnes of ore processed. The average head grades for the Q2 2018 period were 3.36% zinc and 3.98% lead, and for H1 2018 were on average 3.34% and 3.91% respectively. The average H1 2018 metallurgical recoveries were 83.8% for zinc and 93.5% for lead. Q2 zinc recoveries were lower than previous periods due to a mechanical failure of the original zinc regrind mill and commissioning of the new SMD mill.

Sasa produces a zinc concentrate and a separate lead concentrate that contains silver. In Q2 2018, 11,239 tonnes of concentrate containing 49.0% zinc and 10,125 tonnes of concentrate containing 72.7% lead were produced. Total H1 2018 production was 22,624 tonnes of zinc concentrate at an average grade of 48.7% and 19,712 tonnes of lead concentrate at an average grade of 73.0%.

Sasa typically receives from smelters approximately 85% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q2 2018 payable production of zinc was 4,603 tonnes and of lead was 6,997 tonnes, bringing total payable production for H1 2018 to 9,211 tonnes of zinc and 13,666 tonnes of lead. Payable base metal in concentrate sales for the six month period were 9,256 tonnes of zinc and 13,701 tonnes of lead.

During H1 2018, Sasa sold 180,233 ounces of payable silver. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

 

Units

Q2 2018

Q1 2018

H1 2018

H1 2017*

Ore mined

t

198,560

192,372

390,932

391,043

Plant feed

t

197,241

196,364

393,605

392,257

Zinc grade

%

3.36

3.32

3.34

3.20

Zinc recovery

%

83.1

84.6

83.8

85.6

Lead grade

%

3.98

3.83

3.91

4.00

Lead recovery

%

93.8

93.3

93.5

94.6

Zinc concentrate

t (dry)

11,239

11,385

22,624

21,719

- Grade

%

49.0

48.5

48.7

49.5

- Contained zinc

t

5,502

5,518

11,020

10,739

Lead concentrate

t (dry)

10,125

9,587

19,712

20,301

- Grade

%

72.7

73.2

73.0

73.3

- Contained lead

t

7,366

7,020

14,386

14,879

*H1 2017 Sasa production pre-dates CAML ownership

Shuak

Exploration commenced at Shuak in May 2018 and, since then, 11,550 metres of core hydrotransport ('CHT') drilling have been undertaken throughout the licence. The Kyzyl-Sor prospect has been identified as the key area of interest and, taking into account the weathering profile identified by the TEM-FAST geophysical survey, CHT drilling is currently underway in this area.

An induced polarisation ('IP') survey will be undertaken in H2 2018, as well as a diamond drilling programme to commence in Q3 2018 that will primarily focus on Kyzyl-Sor.

Cash

As of 30 June 2018, CAML had cash in the bank of $40.5 million.

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nick Clarke, Chairman

Nigel Robinson, CEO

Gavin Ferrar, CFO

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

James Bavister

Mirabaud Securities (Joint Broker)

Tel: +44 (0) 20 3167 7221

Peter Krens

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Camilla Horsfall

Megan Ray

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns the Kounrad SX-EW copper project in central Kazakhstan and the Sasa zinc-lead mine in Macedonia. The Company also owns 80% of the Shuak copper exploration property in northern Kazakhstan. For further information, please visit www.centralasiametals.com.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBLGDRCGGBGIC
Date   Source Headline
11th Jun 20265:40 pmRNSTR-1: Form for notification of major holdings
10th Jun 20267:00 amRNSTrading Update and Outlook
9th Jun 20265:14 pmRNSTR-1: Notification of major holdings
9th Jun 20267:00 amRNSTR-1: Notification of major holdings
8th Jun 202612:25 pmRNSShare Purchase by a Director
2nd Jun 20269:36 amRNSTR-1: Notification of major holdings
2nd Jun 20267:06 amRNSProposed acquisition of Cygnus Metals Limited
29th May 20266:03 pmRNSTR-1: Notification of major holdings
20th May 202612:14 pmRNSTR-1: Notification of major holdings
19th May 20265:47 pmRNSTR-1: Notification of major holdings
18th May 20262:37 pmRNSResults of 2026 Annual General Meeting (AGM)
11th May 202612:03 pmRNSShare Premium Cancellation Effective
6th May 20266:00 pmRNSTR-1: Notification of major holdings
5th May 202610:59 amRNSTR-1: Notification of major holdings
1st May 20263:24 pmRNSTR-1: Notification of major holdings
30th Apr 202611:32 amRNSChange of registered office address
16th Apr 20267:00 amRNSQ1 2026 Operations Update
15th Apr 20269:17 amRNSAnnual Report and Accounts 2025 and Notice of AGM
15th Apr 20267:00 amRNSPublication of 2025 Sustainability Report
10th Apr 20261:14 pmRNSTR-1: Notification of major holdings
31st Mar 202612:49 pmRNSTotal Voting Rights
30th Mar 202611:40 amRNSResults of Extraordinary General Meeting
30th Mar 20268:28 amRNSTR-1: Notification of major holdings
19th Mar 20267:00 amRNS2025 Full-Year Results
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
10th Mar 20267:00 amRNSProposed Share Premium Cancellation and EGM Notice
5th Mar 20267:00 amRNSTransaction in Own Shares
4th Mar 20267:00 amRNSTransaction in Own Shares
3rd Mar 20267:00 amRNSSasa Mineral Resource and Ore Reserve Statement
3rd Mar 20267:00 amRNSNotice of Results
3rd Mar 20267:00 amRNSTransaction in Own Shares
2nd Mar 20267:00 amRNSTransaction in Own Shares
27th Feb 20265:43 pmRNSTotal Voting Rights
18th Feb 20267:00 amRNSTransaction in Own Shares
17th Feb 20267:00 amRNSTransaction in Own Shares
16th Feb 20267:00 amRNSTransaction in Own Shares
13th Feb 20267:00 amRNSTransaction in Own Shares
12th Feb 20267:00 amRNSTransaction in Own Shares
6th Feb 20265:04 pmRNSTR-1: Notification of major holdings
5th Feb 20267:00 amRNSTransaction in Own Shares
4th Feb 20267:00 amRNSTransaction in Own Shares
3rd Feb 20267:00 amRNSTransaction in Own Shares
2nd Feb 20267:00 amRNSTransaction in Own Shares
30th Jan 20265:46 pmRNSTotal Voting Rights
28th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
22nd Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
19th Jan 20267:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.