Intraday Central Asia Metals Share Chart

Q1 2018 Operations Update

12 Apr 2018 07:00

RNS Number : 6421K
Central Asia Metals PLC
12 April 2018
 

12 April 2018

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company')

Q1 2018 Operations Update

Central Asia Metals plc (AIM: CAML) today provides a Q1 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia ('Sasa').

Highlights

- Kounrad

o Q1 2018 copper production, 3,070 tonnes

- Sasa

o Q1 2018 zinc in concentrate production, 5,518 tonnes

o Q1 2018 lead in concentrate production, 7,020 tonnes

- Shuak

o Encouraging assay results

o 2018 proposed $2.5 million exploration programme

 

CAML production summary

Metal production (tonnes)

Q1 2018

Q1 2017*

Copper

3,070

3,357

Zinc

5,518

5,289

Lead

7,020

7,286

*Q1 2017 zinc and lead production pre-date CAML ownership

Nick Clarke, Chairman, commented:

"These production results demonstrate a good start to the year at both Kounrad and Sasa. Taking seasonal variations in Kazakhstan into account, both of our operations are on track to achieve 2018 production targets, which are 13,000 to 14,000 tonnes of copper cathode, plus 21,000 to 23,000 tonnes of zinc in concentrate and 28,000 to 30,000 tonnes of lead in concentrate."

Kounrad

Kounrad Q1 2018 copper production is 3,070 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 71,496 tonnes.

The winter period was the coldest experienced in five years, with a week in January averaging minus 38 degrees centigrade. The Western Dumps raffinate heating system that formed part of the Stage 2 Expansion programme worked well in its first winter of operation, with 2,302 tonnes of copper being leached from these dumps. This equates to 75% of total Kounrad Q1 2018 production.

Copper sales during Q1 2018 were 2,527 tonnes.

Sasa

In Q1 2018, mined and processed ore was 192,372 tonnes and 196,364 tonnes respectively. The average head grades for the period were 3.32% zinc and 3.83% lead. The average metallurgical recoveries were 84.6% for zinc and 93.3% for lead.

Sasa produces a zinc concentrate and a separate lead concentrate that contains silver. In Q1 2018, 11,385 tonnes of concentrate containing 48.5% zinc and 9,587 tonnes of concentrate containing 73.2% lead were produced. 

Sasa typically receives from smelters approximately 85% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q1 2018 payable production of zinc was 4,690 tonnes and of lead was 6,669 tonnes. Payable base metal in concentrate sales for the period were 4,584 tonnes of zinc and 6,726 tonnes of lead.

During Q1 2018, Sasa sold 108,680 ounces of payable silver. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

 

Units

Q1 2018

Q1 2017*

Ore mined

t

192,372

191,939

Plant feed

t

196,364

192,773

Zinc grade

%

3.32

3.21

Zinc recovery

%

84.6

85.5

Lead grade

%

3.83

4.00

Lead recovery

%

93.3

94.4

Zinc concentrate

t (dry)

11,385

10,688

- Grade

%

48.5

49.5

- Contained zinc

t

5,518

5,289

Lead concentrate

t (dry)

9,587

10,333

- Grade

%

73.2

73.1

- Contained lead

t

7,020

7,286

*Q1 2017 Sasa production pre-dates CAML ownership

Shuak

Following completion of the Shuak 2017 exploration programme, CAML has now received all assay results for the diamond and core hydrotransport ('CHT') drilling undertaken.

The new areas of oxide mineralisation that have been identified at the Kyzyl-Sor prospect have an estimated average thickness of 46 metres at an estimated average copper grade of 0.32% based on CHT drilling, although these estimates will not form part of any resource estimation.

Core from diamond drilling demonstrated intersections in the oxide material such as 41 metres at a copper grade of 0.51% from a depth of 3 metres and 45 metres at a copper grade of 0.28% from a depth of 2 metres.

Examples of encouraging sulphide intervals are 23 metres at a copper grade of 0.94% from a depth of 55 metres and 32 metres at a copper grade of 0.72% from a depth of 81 metres.

The following table demonstrates some notable drilling results in oxidised material.

Prospect

Drill hole

From (m)

Intersection (m)

Cu (%)

Mongol V

MN1

3.0

47.0

0.29

Mongol V

MN2

0.5

49.2

0.24

Mongol V

MN5

0.4

18.6

0.24

Mongol V

MN14

6.0

24.7

0.28

Mongol V

MN15

0.6

20.1

0.23

Mongol North

MN9

4.9

13.1

0.15

Mongol North

MN13

14.6

33.4

0.26

Mongol I-II

MM2

0.2

13.9

0.39

Mongol I-II

MM2

25.8

15.9

0.36

Mongol I-II

MM4

0.5

58.3

0.44

Mongol I-II

MM9

21.3

54.7

0.22

Kyzyl-Sor

KS1

2.2

45.1

0.28

Kyzyl-Sor

KS2

31.1

10.5

0.22

Kyzyl-Sor

KS4

0.4

37.8

0.28

Kyzyl-Sor

KS6

5.0

59.0

0.13

Kyzyl-Sor

KS12

3.1

41.0

0.51

Kyzyl-Sor

KS13

5.5

50.8

0.26

Kyzyl-Sor

KS15

9.3

32.7

0.20

 

The following table demonstrates some notable drilling results in sulphide material.

Prospect

Drill hole

From (m)

Intersection (m)

Cu (%)

Mongol V

MN2

78.3

27.4

0.58

Mongol V

MN3

55.0

23.0

0.94

Mongol V

MN4

81.0

32.3

0.72

Mongol V

MN5

71.0

30.3

0.31

Mongol V

MN6

38.2

22.7

0.98

Mongol V

MN14

60.0

35.4

0.59

Mongol V

MN15

64.9

24.1

0.57

Mongol V

MN15

238.0

17.0

0.67

Mongol V

MN15

328.5

12.7

0.60

Mongol North

MN9

37.0

18.0

0.59

Mongol North

MN9

95.4

21.2

0.55

Mongol I-II

MM1

21.7

97.3

0.20

Mongol I-II

MM2

44.1

22.5

1.74

Mongol I-II

MM2

74.5

9.5

1.21

 

While these intersections are encouraging, CAML will undertake additional drilling and exploration in 2018 in order to better understand likely continuity or resource potential of the Shuak licence.

The table below highlights the $2.5 million proposed 2018 Shuak exploration programme.

 

South Shuak

Deep zones

Kyzyl-Sor

Mongol I

Mongol V

Total

CHT drilling (m)

6,000

 

7,500

1,200

1,000

15,700

Diamond drilling (m)

1,500

1,500

2,000

2,000

1,500

8,500

Geophysics, TEM-FAST (no. lines)

35

-

-

5

-

40

Geophysics, induced polarisation (no. lines)

-

40

-

-

-

40

 

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nick Clarke, Chairman

Nigel Robinson, CFO

Louise Wrathall, Investor Relations

louise.wrathall@centralasiametals.com

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

James Bavister

Mirabaud Securities (Joint Broker)

Tel: +44 (0) 20 3167 7221

Peter Krens

Blytheweigh (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Camilla Horsfall

Megan Ray

Qualified Person Statement:

 

The technical information contained in this announcement has been reviewed and approved by Nick Clarke, CAML Chairman, a qualified Chartered Engineer and member of the Institute of Materials, Minerals and Mining (MIMMM).

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns the Kounrad SX-EW copper project in central Kazakhstan and the Sasa zinc-lead mine in Macedonia. The Company also owns 80% of the Shuak copper exploration property in northern Kazakhstan. For further information, please visit www.centralasiametals.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDLLFVRSEILLIT
Date   Source Headline
11th Jun 20265:40 pmRNSTR-1: Form for notification of major holdings
10th Jun 20267:00 amRNSTrading Update and Outlook
9th Jun 20265:14 pmRNSTR-1: Notification of major holdings
9th Jun 20267:00 amRNSTR-1: Notification of major holdings
8th Jun 202612:25 pmRNSShare Purchase by a Director
2nd Jun 20269:36 amRNSTR-1: Notification of major holdings
2nd Jun 20267:06 amRNSProposed acquisition of Cygnus Metals Limited
29th May 20266:03 pmRNSTR-1: Notification of major holdings
20th May 202612:14 pmRNSTR-1: Notification of major holdings
19th May 20265:47 pmRNSTR-1: Notification of major holdings
18th May 20262:37 pmRNSResults of 2026 Annual General Meeting (AGM)
11th May 202612:03 pmRNSShare Premium Cancellation Effective
6th May 20266:00 pmRNSTR-1: Notification of major holdings
5th May 202610:59 amRNSTR-1: Notification of major holdings
1st May 20263:24 pmRNSTR-1: Notification of major holdings
30th Apr 202611:32 amRNSChange of registered office address
16th Apr 20267:00 amRNSQ1 2026 Operations Update
15th Apr 20269:17 amRNSAnnual Report and Accounts 2025 and Notice of AGM
15th Apr 20267:00 amRNSPublication of 2025 Sustainability Report
10th Apr 20261:14 pmRNSTR-1: Notification of major holdings
31st Mar 202612:49 pmRNSTotal Voting Rights
30th Mar 202611:40 amRNSResults of Extraordinary General Meeting
30th Mar 20268:28 amRNSTR-1: Notification of major holdings
19th Mar 20267:00 amRNS2025 Full-Year Results
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
11th Mar 20264:11 pmRNSTR-1: Notification of major holdings
10th Mar 20267:00 amRNSProposed Share Premium Cancellation and EGM Notice
5th Mar 20267:00 amRNSTransaction in Own Shares
4th Mar 20267:00 amRNSTransaction in Own Shares
3rd Mar 20267:00 amRNSSasa Mineral Resource and Ore Reserve Statement
3rd Mar 20267:00 amRNSNotice of Results
3rd Mar 20267:00 amRNSTransaction in Own Shares
2nd Mar 20267:00 amRNSTransaction in Own Shares
27th Feb 20265:43 pmRNSTotal Voting Rights
18th Feb 20267:00 amRNSTransaction in Own Shares
17th Feb 20267:00 amRNSTransaction in Own Shares
16th Feb 20267:00 amRNSTransaction in Own Shares
13th Feb 20267:00 amRNSTransaction in Own Shares
12th Feb 20267:00 amRNSTransaction in Own Shares
6th Feb 20265:04 pmRNSTR-1: Notification of major holdings
5th Feb 20267:00 amRNSTransaction in Own Shares
4th Feb 20267:00 amRNSTransaction in Own Shares
3rd Feb 20267:00 amRNSTransaction in Own Shares
2nd Feb 20267:00 amRNSTransaction in Own Shares
30th Jan 20265:46 pmRNSTotal Voting Rights
28th Jan 20267:00 amRNSTransaction in Own Shares
23rd Jan 20267:00 amRNSTransaction in Own Shares
22nd Jan 20267:00 amRNSTransaction in Own Shares
20th Jan 20267:00 amRNSTransaction in Own Shares
19th Jan 20267:00 amRNSTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.