Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
8.10    0.06 (0.75%)
Bid:
7.90
Ask:
8.30
Spread: 0.40 (5.063%)
Market Cap: £39.85m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

Second Drilling Program at Orom-Cross Project

16 Aug 2021 07:00

RNS Number : 6750I
Blencowe Resources PLC
16 August 2021
 

Date: 16th August 2021 Blencowe Resources Plc

 

("Blencowe" or the "Company")

 

Blencowe Completes Second Successful Drilling Program at Orom-Cross Project

 

The Company is pleased to provide a further update to the comprehensive JORC Resource diamond drilling program that has been completed on its Orom-Cross Graphite Project in Northern Uganda.

 

Highlights

· Another successful drilling campaign now completed.

· An additional 38 infill holes totalling 1,140m was completed in the Northern Syncline and a further 36 holes for 1,080m in the Camp Lode.

· 1,150 samples currently in transit to the JORC-accredited labs in Tanzania for sample preparation prior to assaying at SGS in Canada.

The company commenced a second phase of resource and in-fill drilling at its Orom-Cross project in May 2021 with the aim of upgrading resources at both the Camp Lode and Northern Syncline deposits. The company made steady progress on the program after easing of the Covid lockdown in country and successfully completed the planned JORC resource drill out of both the Northern Syncline Lode and the High-Grade Camp Lode with a combined total meterage of 2,220m drilled in both deposits. An additional 38 infill holes totalling 1,140m was completed in the Northern Syncline and a further 36 holes for 1,080m in the Camp Lode. Similarly to the first phase drilling program, these holes intersected significant bands of graphite over the length of the holes.

The drilling was planned to cover the top third of the deposit to approximately 25 meters, being the weathered free dig material, which will be the focus for the initial mining program. There is considerably more graphite below as fresh material which can be drilled at a later stage if required. Each of these deposits are also open along strike. Geological logging of the holes and core sample delineation is also completed with 1,150 samples currently in transit to the JORC-accredited labs in Tanzania for sample preparation prior to assaying at SGS in Canada.

Additional drillholes were completed for geotechnical samples to aid in mine design and these samples are currently in transit to the geotechnical consultants in South Africa for testing.

The drill sites are being rehabilitated and the drilling teams have departed from site on the weekend, with a local team remaining to maintain the site on care and maintenance.

 

Cameron Pearce, Executive Chairman's commented;

"Once again we are pleased to report continued successful work out at site, being the second extensive drilling campaign to delineate a substantial JORC standard resource in the Indicated and/or Measured categories. Our local partners have done a fantastic job in the face of Covid restrictions and completed this program on-time and to-budget. We now expect to have enough tonnes drilled out to complete the first ten years' mine life at Orom-Cross and we can continue to add to this cost-effectively, as required, to help meet the expected significant increase in graphite demand.

We will now commence work on the Preliminary Economic Assessment, being an internally generated first full commercial end-to-end study of the entire graphite project. This will be completed in the next quarter and we will then move immediately into Pre-Feasibility Study stage. This will involve the creation of a Full Sales and Marketing Plan and the first steps towards finding potential offtake partners to sell our end product into. We are comfortable with all the progress we have made over the past 15 months since we acquired Orom-Cross and we will continue to add value in all ways possible."

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn

 

 

Investor Relations

Sasha Sethi

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@lionsheadconsultants.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

Brandon Hill Capital Limited

Jonathan Evans

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 First Equity Limited

 Jason Robertson

 

Twitter 

https://twitter.com/BlencoweRes

LinkedIn 

https://www.linkedin.com/company/72382491/admin/

 

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

 

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 

Tel: +44(0)20 7330 1883

jasonrobertson@firstequitylimited.com

 

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is now moving into the studies phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 16.3Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

http://www.rns-pdf.londonstockexchange.com/rns/6750I_1-2021-8-15.pdf

 

 

 

Figure 1: OROM_Cross Diamond Drill hole locations - Drilling Phases 1 and 2

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFFFSLTRIELIL
Date   Source Headline
23rd Oct 202510:48 amRNSExercise of Warrants
21st Oct 20257:00 amRNSFurther Drilling Results - Camp Lode
17th Oct 202511:08 amRNS-RInterview with CEO Mike Ralston -DFS Progress
17th Oct 20257:00 amRNSFurther Battery Testing Success
15th Oct 20255:00 pmRNSHolding(s) in Company
8th Oct 202512:24 pmRNSExercise of Warrants
3rd Oct 20257:00 amRNSIssue of DFC Performance Shares and DFS Options
1st Oct 20251:19 pmRNSExercise of Warrants
26th Sep 20259:04 amRNSHolding(s) in Company
25th Sep 20257:00 amRNSDrilling Results
23rd Sep 20257:00 amRNSHolding(s) in Company
12th Sep 20257:00 amRNSFundraise of £1.12m and Exercise of Options at 6p
10th Sep 20257:00 amRNS-RUpdated Corporate Presentation
4th Sep 20257:00 amRNSAppointment of Project Finance Adviser
22nd Aug 20257:00 amRNSCompletion of Orom-Cross DFS Programmes
12th Aug 20257:00 amRNSIssue of Equity
1st Aug 20257:00 amRNSOfftake Agreement Signed
30th Jul 20257:00 amRNSExercise of Warrants
17th Jul 20257:00 amRNSStage 7 Drill Program Completed
8th Jul 202510:48 amRNSExercise of Warrants
8th Jul 20257:00 amRNSReceipt of US$0.75 million from DFC
2nd Jul 20257:00 amRNSDeep Drilling at Northern Syncline
26th Jun 20257:00 amRNSStage 7 Drilling Program Update
13th Jun 20257:00 amRNSSAFELOOP Testing Update
2nd Jun 20253:56 pmRNSInterim Consolidated FS Six Month End 31 Mar 2025
23rd May 20257:00 amRNSFurther US$0.5M Grant Funding Received From DFC
22nd May 20259:36 amRNSHolding(s) in Company
21st May 20257:00 amRNS-RInterview with CEO
7th May 20257:00 amRNSStage 7 Drill Program Nears Completion
22nd Apr 20254:43 pmRNSResults of Retail Offer - Replacement
16th Apr 20258:14 amRNSResults of Retail Offer
15th Apr 20254:40 pmRNSRetail Offer to Raise up to £100,000
15th Apr 20254:35 pmRNSFundraise of £1m to support completion of the DFS
8th Apr 20257:39 amRNSOfftake Agreement with TaiDa
31st Mar 20257:00 amRNSDrilling Update
21st Mar 20257:00 amRNSESIA Approval
19th Mar 20257:00 amRNSOfftake for Purified Graphite
3rd Mar 20257:00 amRNSAFC Expression of Interest
26th Feb 20254:32 pmRNSResult of AGM
20th Feb 20257:00 amRNSHydropower Study
14th Feb 20257:00 amRNS7,000m Drilling Programme
31st Jan 20258:56 amRNSAnnual Financial Report
30th Jan 20257:00 amRNSSAFELOOP Update
28th Jan 20257:00 amRNS-RWebinar 25 February 2025
9th Jan 20257:00 amRNSCommencement of Drilling
19th Dec 202411:02 amRNSResult of Meeting
10th Dec 202410:04 amRNS-RUpdated Corporate Presentation
9th Dec 20247:00 amRNSExercise of Warrants
28th Nov 20247:00 amRNSBlencowe Joins European EV Consortium
26th Nov 202412:12 pmRNSPublication of a Prospectus

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.