The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 6.00
Bid: 5.70
Ask: 6.30
Change: -0.25 (-4.20%)
Spread: 0.60 (10.526%)
Open: 5.95
High: 6.00
Low: 5.70
Prev. Close: 5.95
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Second Drilling Program at Orom-Cross Project

16 Aug 2021 07:00

RNS Number : 6750I
Blencowe Resources PLC
16 August 2021
 

Date: 16th August 2021 Blencowe Resources Plc

 

("Blencowe" or the "Company")

 

Blencowe Completes Second Successful Drilling Program at Orom-Cross Project

 

The Company is pleased to provide a further update to the comprehensive JORC Resource diamond drilling program that has been completed on its Orom-Cross Graphite Project in Northern Uganda.

 

Highlights

· Another successful drilling campaign now completed.

· An additional 38 infill holes totalling 1,140m was completed in the Northern Syncline and a further 36 holes for 1,080m in the Camp Lode.

· 1,150 samples currently in transit to the JORC-accredited labs in Tanzania for sample preparation prior to assaying at SGS in Canada.

The company commenced a second phase of resource and in-fill drilling at its Orom-Cross project in May 2021 with the aim of upgrading resources at both the Camp Lode and Northern Syncline deposits. The company made steady progress on the program after easing of the Covid lockdown in country and successfully completed the planned JORC resource drill out of both the Northern Syncline Lode and the High-Grade Camp Lode with a combined total meterage of 2,220m drilled in both deposits. An additional 38 infill holes totalling 1,140m was completed in the Northern Syncline and a further 36 holes for 1,080m in the Camp Lode. Similarly to the first phase drilling program, these holes intersected significant bands of graphite over the length of the holes.

The drilling was planned to cover the top third of the deposit to approximately 25 meters, being the weathered free dig material, which will be the focus for the initial mining program. There is considerably more graphite below as fresh material which can be drilled at a later stage if required. Each of these deposits are also open along strike. Geological logging of the holes and core sample delineation is also completed with 1,150 samples currently in transit to the JORC-accredited labs in Tanzania for sample preparation prior to assaying at SGS in Canada.

Additional drillholes were completed for geotechnical samples to aid in mine design and these samples are currently in transit to the geotechnical consultants in South Africa for testing.

The drill sites are being rehabilitated and the drilling teams have departed from site on the weekend, with a local team remaining to maintain the site on care and maintenance.

 

Cameron Pearce, Executive Chairman's commented;

"Once again we are pleased to report continued successful work out at site, being the second extensive drilling campaign to delineate a substantial JORC standard resource in the Indicated and/or Measured categories. Our local partners have done a fantastic job in the face of Covid restrictions and completed this program on-time and to-budget. We now expect to have enough tonnes drilled out to complete the first ten years' mine life at Orom-Cross and we can continue to add to this cost-effectively, as required, to help meet the expected significant increase in graphite demand.

We will now commence work on the Preliminary Economic Assessment, being an internally generated first full commercial end-to-end study of the entire graphite project. This will be completed in the next quarter and we will then move immediately into Pre-Feasibility Study stage. This will involve the creation of a Full Sales and Marketing Plan and the first steps towards finding potential offtake partners to sell our end product into. We are comfortable with all the progress we have made over the past 15 months since we acquired Orom-Cross and we will continue to add value in all ways possible."

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn

 

 

Investor Relations

Sasha Sethi

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@lionsheadconsultants.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

Brandon Hill Capital Limited

Jonathan Evans

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 First Equity Limited

 Jason Robertson

 

Twitter 

https://twitter.com/BlencoweRes

LinkedIn 

https://www.linkedin.com/company/72382491/admin/

 

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

 

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 

Tel: +44(0)20 7330 1883

jasonrobertson@firstequitylimited.com

 

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is now moving into the studies phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 16.3Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

http://www.rns-pdf.londonstockexchange.com/rns/6750I_1-2021-8-15.pdf

 

 

 

Figure 1: OROM_Cross Diamond Drill hole locations - Drilling Phases 1 and 2

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFFFSLTRIELIL
Date   Source Headline
2nd Jun 20219:54 amRNSHalf-year Report
1st Jun 20217:00 amRNSTR-1: Standard form notification of major holdings
24th May 20217:00 amRNSMetallurgical Test Work
19th May 202111:34 amRNSUpdated Corporate Presentation
14th May 202112:00 pmRNSTransaction in Shares
4th May 20217:00 amRNSStage Two Drilling Program Commences
29th Apr 20212:12 pmRNSDirector/PDMR Shareholding
26th Apr 20211:26 pmRNSHolding(s) in Company
13th Apr 20217:30 amRNSInvestor Webinar
13th Apr 20217:00 amRNSMaiden JORC Mineral Resource
7th Apr 20212:30 pmRNSWarrant Exercise
31st Mar 202110:08 amRNSResult of AGM
24th Mar 202111:30 amRNSWarrant Exercise
8th Mar 20214:30 pmRNSNotice of AGM
1st Mar 20217:00 amRNSDrilling Results
12th Feb 20217:00 amRNSTR-1: Standard form notification of major holdings
8th Feb 20212:12 pmRNSWarrant Exercise
8th Feb 20217:07 amRNSDrilling Results at Camp Lode
26th Jan 20217:00 amRNSAnnual Financial Report
22nd Jan 20211:07 pmRNSInvestor Conference Call
18th Jan 20217:00 amRNSPlacing to Raise £500,000
16th Dec 20207:00 amRNSPlacing to Raise £300,000
9th Dec 20209:52 amRNSTR-1: Standard form notification of major holdings
1st Dec 202011:01 amRNSBlock Listing Application Update
27th Nov 202012:11 pmRNSBlock Listing Application Update
26th Nov 20207:16 amRNSJORC Resource Update
25th Nov 20201:59 pmRNSBlock Listing Application & Issue of Equity
23rd Nov 20207:00 amRNSDirector Warrant Exercise and Purchase of Shares
5th Nov 20207:00 amRNSPublication of New Research Note
14th Oct 20202:07 pmRNSHolding(s) in Company
14th Oct 20207:21 amRNSHolding(s) in Company
14th Oct 20207:20 amRNSHolding(s) in Company
13th Oct 202010:21 amRNSHolding(s) in Company
9th Oct 20204:03 pmRNSTR-1: Standard form notification of major holdings
7th Oct 20209:47 amRNSTR-1: Standard form notification of major holdings
6th Oct 202012:59 pmRNSIssue of Equity
21st Sep 20207:00 amRNSSamples Sent for Assay to Deliver Maiden Resource
18th Aug 20207:00 amRNSTR-1: Standard form notification of major holdings
17th Aug 202010:22 amRNSUpdated presentation on the company website
10th Aug 20207:00 amRNSFirst Stage Value-Add Completed at Orom-Cross
4th Aug 20207:00 amRNSAppointment of SGS Lakefield
20th Jul 20207:00 amRNSJORC Resource Drilling Program Completed
16th Jul 20203:57 pmRNSTR-1: Standard form notification of major holdings
2nd Jul 20207:00 amRNSPhase 1 Drilling Program Update
16th Jun 20207:00 amRNSUpdate on the High-Grade Graphite Zone
2nd Jun 20207:00 amRNSHalf-year Report
27th May 20207:00 amRNSNew High-Grade Graphite Zone Identified
11th May 20207:00 amRNSRecommencement of metallurgical test work
5th May 20201:32 pmRNSTR-1: Notification of major holdings
5th May 20207:00 amRNSNew Research Initiation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.